Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Site Demolition and Hazardous Material Removal

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

238910 - Site Preparation Contractors

Place of Performance

Camp Lejeune, NC, 28547, USA

Set-Aside

SBA

Documents

This scope was carved out of N4008527R9006.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

NH100 Engine Control Unit Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs demolition of existing structures and removal of contaminated materials for prime contractors on USACE/DoD projects. Demolishes existing work, removes and disposes of Polychlorinated Biphenyls (PCBs) and PCB-contaminated soils, and manages recyclable materials via DRMO. Coordinates with Base High Voltage Shop for electrical equipment removal. Must comply with State of North Carolina landfill permits. Delivers a cleared site and hazardous waste disposal certifications.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
CLASS 2 LANDFILL PARTIAL CLOSURE
Solicitation # 27027
The County of Greenville is soliciting proposals for the partial closure construction of the Class 2 Unit 2 Landfill at the Twin Chimneys Landfill in South Carolina. The scope of work involves significant earthwork, including approximately 301,000 cubic yards of excavation and 120,000 cubic yards of structural fill for a perimeter berm. Key deliverables include the construction of a stormwater pond, subgrade preparation, stone access roads, and the implementation of erosion control measures such as silt fencing, seeding, and gabion baskets. The project requires the contractor to provide a South Carolina-licensed land surveyor for as-built surveys and a licensed firm for soil testing. The County desires substantial completion within 210 calendar days, with a tentative Notice to Proceed date of December 18, 2026. Proposals are due by November 16, 2026, and will be evaluated on a point system covering responsiveness, experience, project approach, pricing, equipment, and references. Award decisions will heavily weigh integrity, reputation, and past performance. The contract requires a bid bond as well as performance and payment bonds equal to the contract price, remaining in effect for one year after final payment. Quality control is a dual-layered process where the contractor manages Construction Quality Control (CQC) through an independent laboratory, while the Owner performs Construction Quality Assurance (CQA) through a separate licensed firm. Payment is based on a mix of lump sum and unit price items, with undisputed invoices due upon receipt and subject to a non-appropriation clause.
LANDFILL OPERATIONS

POSTED

about 4 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department is soliciting sealed bids for project ACFD 26-03, which involves the demolition of Connex box structures and the removal of debris at 890 Lola Street in San Leandro, California. This stipulated sum, single-prime contract requires the successful bidder to complete all work, including site clearance and the sorting of recyclable materials, within 120 calendar days of the Notice to Proceed. A mandatory combined pre-bid conference and site visit was scheduled for November 12, 2026, and sealed bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Bidders must provide a bid security of 10 percent of the total bid price and, upon award, furnish 100 percent performance and payment bonds. The scope of work includes strict adherence to soil dust mitigation standards, hazardous materials procedures, and California Public Works Contract requirements regarding prevailing wages. Due to the nature of the site, the contractor must submit a comprehensive site security and logistics plan addressing tool control, crew size, and working around inmates. Compliance with the Americans with Disabilities Act and Title VII of the Civil Rights Act is required, and all work is subject to inspection and acceptance by the ACFD and its Construction Manager.
AC Fire Department

POSTED

about 6 hours ago

DEADLINE

in 27 days
View Details

More opportunities from Department Of Defense → Navfacsyscom Mid-Atlantic

Same awarding agency

NAICS: 236220
New
Federal
NH100 Engine Control Unit Replacement
Solicitation # N4008527R9006
The NH100 Engine Control Unit Replacement project, managed by Navfacsyscom Mid-Atlantic under solicitation N4008527R9006, involves the replacement of three Engine Control Units (ECUs) on emergency generators at the NH100 Naval Hospital in Camp Lejeune, North Carolina. The scope of work includes providing all labor, materials, and expertise to install ECUs, onboard controllers, custom fabricated wiring harnesses, pulse-controlled fuel injectors, and voltage regulators. The primary objective is to restore the emergency electrical distribution system to compliance, requiring the contractor to integrate components into existing PLC controllers and employ a verified Commissioning Agent to perform system acceptance tests in accordance with NFPA 110. This project is a total Small Business Set-Aside, and only M&R MACC Contractors listed on the General Requirements cover page are eligible to submit proposals. The estimated contract value ranges between $500,000 and $1,000,000. Performance is divided into two phases: a Submittal and Procurement Phase requiring technical submittals within 15 calendar days of award, and a Physical Construction and Commissioning Phase to be completed within 60 calendar days of receiving all manufacturer materials. Administrative requirements include a 20% bid bond, the use of Wide Area WorkFlow (WAWF) for invoicing, and adherence to the Buy American statute. The contractor must comply with North Carolina Building Codes, OSHA Safety Codes, and specific UFC standards. A preconstruction meeting must be held within 35 calendar days after award to address cybersecurity and safety protocols.
Commercial and Institutional Building Construction

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
Federal
MULTIPLE BARRACKS BUILDING 1245 and 1246 RENOVATIONS BEAUFORT SOUTH CAROLINA MARINE CORPS BASES
Solicitation # N4008527R0038
Solicitation N4008527R0038, managed by Navfacsyscom Mid-Atlantic for the Department of Defense, covers Repair Phase 4 renovations for BEQ Buildings 1245G and 1246H at the Marine Corps Bases in Beaufort, South Carolina. The scope of work primarily focuses on interior lighting and electrical distribution system updates, requiring adherence to EU Directive 2011/65/EU regarding hazardous substances. The project includes strict prohibitions on materials such as asbestos, lead-based paint, and mercury, and mandates compliance with ADA accessibility guidelines and EM 385-1-1 safety standards. Administrative requirements include the use of Wide Area Work Flow (WAWF) for invoicing, with a five-calendar-day submission window for monthly invoices. Quality control is central to the contract, requiring a QC Manager to be present on-site for all construction and testing, and the government's approval of a QC Plan before work begins. Performance milestones include a mandatory start date at contract award and a facility turnover planning meeting scheduled at 75 percent completion or six months prior to the completion date. The contractor must maintain a performance bond throughout the construction and warranty periods and provide insurance coverage per FAR 28.307-2.
Commercial and Institutional Building Construction

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Federal
SH50 and HP259 HVAC Repairs
Solicitation # N4008527R9004
Solicitation N40085-27-R-9004 is a small business set-aside for a turnkey modernization of mechanical, hydronic, and energy-management systems at MCB Camp Lejeune, North Carolina. The project is restricted to Mechanical MACC Contractors and is estimated between 1 million and 5 million dollars. The scope is divided into two primary efforts: the replacement of water source heat pumps and Building Automation System integration at Facility SH50, and the replacement of a 20-ton split system HVAC unit at Building HP259. Key deliverables include the demolition and disposal of legacy heat pumps, air handling units, and pumps, followed by the installation of high-efficiency replacements, new ductwork, refrigerant piping, and electrical connections. The contract must be completed within 180 days of award, with specific equipment changeovers scheduled between April 1, 2026, and April 1, 2027. Award will be based on the lowest price. Strict execution constraints apply, including the requirement that all major replacement equipment be verified on-site before demolition begins and that work in occupied facilities be coordinated to minimize disruption. Contractors must maintain a qualified Quality Control Manager on-site and adhere to Davis-Bacon Act labor standards, Buy American requirements, and specific ADA compliance for sensors and fixtures. Invoicing is processed via Wide Area WorkFlow, and performance bonds and liability insurance are required for the duration of the project.
Commercial and Institutional Building Construction

POSTED

about 11 hours ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS