Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on February 7, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flooring Replacement

Awarded
FA8101-11-T-0011-FlooringFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Taylor Center - Bresnan Wood Floor Replacement
Solicitation # SRC-MNSU-2027-000651-RFB
Solicitation SRC-MNSU-2027-000651-RFB is a request for bids from the Minnesota State Colleges and Universities System for the replacement of the wood floor at the Taylor Center Bresnan Arena Court at Minnesota State University, Mankato. The scope of work involves the removal and disposal of existing maple flooring, the installation of 25/32” x 2-1/4” 2nd and better grade maple, and the application of a water-based seal and oil modified gloss finish. The selected vendor will also assist in redesigning graphics and game lines and will be responsible for the final cleaning and protection of the entire arena, including the seating area. Any necessary subfloor repairs will be handled on a time and material basis, requiring the vendor to provide an hourly rate in their bid. The project is scheduled to begin on May 17, 2027, with substantial completion by June 28, 2027, and final completion by July 9, 2027. The contract will be awarded to the lowest priced, qualified bidder who meets all technical requirements, timeline constraints, and terms and conditions. Bidders must submit a lump sum total bid and provide required documentation, including an Affidavit of Non-Collusion, an Affirmative Action declaration, and a Supplier Diversity Form. All submissions must be made electronically through the Minnesota State e-procurement system by the deadline of November 12, 2026. Compliance with prevailing wage standards is mandatory for this project.
Minnesota State Colleges and Universities System

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 238330
New
Federal
USMC Stair Runner Replacement for Home of the Commandant
Solicitation # M0026427RFI002
The Department of Defense, through the Marine Corps, has issued a sources sought announcement under solicitation M0026427RFI002 to conduct market research for the replacement of the stair runner at the Home of the Commandant in Washington D.C. This project requires a custom, like-for-like replacement for three flights of stairs and associated landings, designed to replicate the existing runner's appearance, color, pattern, and texture to maintain the residence's historic architectural character. The scope of work includes field measurements, the provision of material samples for government approval, fabrication of a professional-quality runner with finished edges, and full installation. The project must be completed by April 16, 2027, with work typically performed Monday through Friday from 7:00 AM to 4:00 PM. This opportunity is designated as a total small business set-aside under NAICS code 238330. Interested vendors must demonstrate experience in custom carpet fabrication and professional installation. Key requirements include the use of protective coverings to safeguard historic woodwork and architectural features, the removal of all contractor-generated debris, and compliance with security and access-control protocols at Marine Barracks Washington. Responses must be submitted to Sergeant Jacob Espinosa by 10:00 AM EST on October 22, 2026, and should include the company name, address, phone number, point of contact, CAGE code, company size status, and ownership nationality.
Commander

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This flooring replacement contract at Tinker Air Force Base involves the removal of existing flooring and the installation of ceramic tile designed to prevent water penetration. The scope of work includes the installation of partition walls equipped with 36-inch industrial metal doors and frames, all of which must comply with OSHA requirements. While the contractor is responsible for the walls and flooring, they are not required to provide or install new lighting, emergency lighting, exit signs, fire alarms, or electrical receptacles. The contractor is not responsible for relocating existing light fixtures or ceiling fixtures, although some HVAC diffusers may need minor adjustments to accommodate the new walls. The project allows the contractor to determine the optimal installation sequence, suggesting that flooring be laid prior to the installation of partition walls. The doors provided must feature industrial-grade hardware, though the contractor is not required to key them for the end user.

General Info

Agency

N/A

Contract Value

$27,394

NAICS

238330 - Flooring Contractors

Place of Performance

TINKER AFB, OKLAHOMA, TINKER AFB, OK, 73145, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
All Questions are to be posted along with answers. The follwoing questions and anwers are being provided: 1) Is there a desired spec on the floor tile? The only desired spec on the floor tile is that it be cermaic tile to prevent water penetration. 2) Will the floor tile go down before the walls are installed? It makes sense to put the tile down first, then put in the partition walls, but the contractor can figure that out. 3) At some locations the walls will intersect or split the light fixtures and HVAC grills. Will the contractor be responsible for relocating them? The contractor isn't responsible for relocating any lights or other ceiling fixtures. However, it became evident at the site visit that some HVAC diffusers may need to be pushed up just to fit the walls. 4) Will exit lights be required? Exit lighting will not be required from the contractor. 5) Will emergency lighting be required? Emergency lighting will not be required. 6) Will new lighting be required? New lighting will not be required. 7) Will new light switching be required? New light switches will not be required. 8) Will existing light fixtures need to be moved if over new walls? Existing light fixtures do not need to be moved by the contractor. 9) Will fire alarm be required? Fire alarm and switches will not be required. 10) Will receptacles be required in new walls? Electrical outlets in the new walls will not be required. Existing electrical on outer walls will remain. 11)The old floor will be torn out and replaced with the ceramic tile. 12) Per Appendix "A" the contractor installed partition walls are to have doors. Please verify if the contractor is to install these doors. If so is there any direction on door type, material of construction, frame type, and hardware schedule? Will the contractor be required to "key" the doors for the end user? If a door or hardware schedule is to be provided we ask that you provide adequate time for pricing after it is used. A: Doors must be provided and shall be 36" with metal frame and door construction. Hardware provided must be for industrial use but does not require to be keyed for the end user. All installation must meet OSHA requirements.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS