This Solicitation opportunity from Washington was posted on January 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Seattle, through Seattle City Light, is soliciting qualifications for the Flume Creek Culvert Replacement and Channel Restoration project located at Boundary Road (County Road 2975). Interested parties must submit their qualifications by January 31, 2026, with all inquiries regarding the solicitation to be directed through the city’s e-procurement portal by the specified question submission deadline. This project focuses on infrastructure improvement aimed at replacing a culvert and restoring the channel to enhance environmental and functional conditions in the designated area.
The solicitation, identified as RFQ #SCL-767069239, was posted on January 2, 2026. The City’s contracting office, located in Seattle, Washington, oversees this opportunity and is managed by Senior Contracts & Procurement Specialist Ned Lichty, who serves as the primary contact. This request for qualifications is part of Seattle City Light’s efforts to engage qualified entities capable of undertaking this essential infrastructure project, with submissions and communications requiring adherence to the stated timelines and processes via the designated online portal.
General Info
Seattle City Light seeks qualifications for Flume Creek Culvert Replacement; submissions due January 31, 2026.
HighAI Summary for Approach to Scope of Work - Anonymous Attachment A: This document is a template for consultants to detail their proposed approach to completing the scope of work for a project. It emphasizes anonymity to minimize bias, prohibiting any identifying information such as company or personnel names. The document instructs consultants to describe their overall approach, processes and tools for monitoring and reporting, and strategies to encourage the use of small, local, minority, women, veteran, and disadvantaged businesses. The response must not exceed five pages and must follow strict formatting guidelines.
DOCX
DOCX, High priority: read this first1 page · sow
HighAI Summary for Approach to Scope of Work - Anonymous Consultant Response: This document is a template for consultants to detail their proposed approach to completing the scope of work for a project with Seattle City Light. It requires an anonymous response, prohibiting any identifying information such as company or personnel names. The response must be specific about the approach to tasks, staff roles, responsibilities, and schedule, not exceeding five pages. Key content includes the overall project approach, processes and tools for monitoring scope, schedule, and price development, and strategies to encourage participation of small, local, minority, women, veteran, and disadvantaged businesses. The document emphasizes adherence to formatting rules to avoid disqualification.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Attachment F - Minimum Qualifications (REV1): A mandatory response template for consultants to demonstrate compliance with ten minimum qualifications for a project involving aquatic infrastructure, stream restoration, and environmental investigations. The document specifies strict formatting requirements and includes a revised section noting the removal of qualification #9 via Addendum dated 1/23/26.
DOCX
DOCX, High priority: read this first23 pages · contract-document
HighAI Summary for City of Seattle Consultant Agreement Template: This document is a template for a Consultant Agreement used by the City of Seattle. It includes instructions for completing the contract, such as verifying the legal name of the consultant and ensuring compliance with federal requirements if federally funded. The agreement outlines the parties involved, recitals explaining the contract's background, and options for the term of the agreement. It also covers the scope of work, time of beginning and completion, and provisions for expanding the scope for new work. The document is designed to be customized with specific project details, consultant information, and contract terms.
PDF
PDF, High priority: read this first3 pages · insurance-transmittal-form
HighAI Summary for City of Seattle Consultant Contract Insurance Requirements Transmittal Form RFQ #SCL-767069239: This document is the City of Seattle Consultant Contract Insurance Requirements Transmittal Form for the contract titled 'Flume Creek Culvert Replacement and Channel Restoration at Boundary Road' under RFQ #SCL-767069239. It serves as an attachment to Agreement No. CL0-CC2025-018 and outlines the insurance coverage requirements that the consultant must maintain throughout the contract term. The form includes fields for insurance representatives to complete and specifies required insurance types such as Commercial General Liability, Commercial Automobile Liability, Worker's Compensation, Umbrella or Excess Liability, and additional coverages like Pollution Liability, Aviation Liability, Professional Liability, Crime Insurance, and Cyber Liability. It also details the City of Seattle's requirements for additional insured status, minimum coverage limits, and policy endorsements. The form is intended to ensure compliance with the City's insurance terms and conditions for the awarded contract.
DOCX
DOCX, High priority: read this first7 pages · consultant-questionnaire
HighAI Summary for City of Seattle Consultant Questionnaire: This document is the City of Seattle Consultant Questionnaire, a mandatory form to be submitted with proposals or contracts. It collects detailed information about the consultant firm including legal name, contact details, business registration, ownership, financial responsibility, social equity compliance, disputes, and involvement of current or former city employees. The form serves as an attestation of the truthfulness of the information provided and requires prompt updates if any facts change prior to contract award. It is designed to ensure compliance with city regulations and standards, including labor standards and anti-discrimination laws.
DOC
DOC, High priority: read this first2 pages · minimum-qualifications
HighAI Summary for Minimum Qualifications Attachment F - Consultant Eligibility Response: This document is a template for consultants to respond to minimum qualifications required to be eligible for proposal submission. It outlines specific experience and expertise criteria, including project management in aquatic infrastructure, public works contracting, successful contract performance, stream restoration design, and environmental media specialist qualifications. The document emphasizes strict adherence to the template format and requires detailed compliance descriptions for each qualification to avoid disqualification.
DOCX
DOCX, High priority: read this first2 pages · past-performance
HighAI Summary for Narrative of Related Experience Attachment B: This document is a template for providing a narrative of related experience for consulting services projects. It requires the proposer to describe up to five projects that demonstrate experience relevant to the Scope of Work. Each project narrative should include details such as project name, owner, location, delivery method, project description, key team members, contract prices, completion dates, and client contact information. The purpose is to show a history of successful projects of similar scope and complexity, highlighting how the proposer's experience supports successful project delivery and goal achievement. The template emphasizes strict formatting requirements and limits narratives to two pages per project.
DOCX
DOCX, High priority: read this first4 pages · sow
HighAI Summary for Resume of Key Project Team and Org Chart - Attachment C: This document is a template for submitting resumes of key project team members and an organizational chart for a project related to an RFQ. It requires detailed resumes (maximum two pages each) for key technical leads and other significant contributors, describing their experience and qualifications relevant to the Scope of Work. The document outlines specific roles such as Project Manager, Lead Civil Engineer, Lead Hydraulics & Hydrology Engineer, and others, with responsibilities defined for each. It also mandates the inclusion of a project team organizational chart identifying key members and sub-consultants, along with the proposed percentage of time each member will dedicate to the project by task. The document emphasizes adherence to the template format to avoid disqualification and notes that certain key members must attend the interview phase.
PDF
PDF, High priority: read this first51 pages · rfq
HighAI Summary for RFQ SCL-767069239 Flume Creek Culvert Replacement and Channel Restoration: This Request for Qualifications (RFQ) SCL-767069239 issued by Seattle City Light seeks a consultant for the Flume Creek Culvert Replacement and Channel Restoration project at Boundary Road (County Road 2975). The document outlines the project background, including environmental and historical considerations, and the consultant's scope of work such as final design, surveys, studies, permitting support, and construction support. Key dates include solicitation release on January 2, 2026, response deadline January 30, 2026, and contract execution by April 27, 2026. The RFQ includes detailed procurement contact information, submission instructions, and attachments relevant to qualifications and project requirements.
PDF
PDF, High priority: read this first51 pages · rfq
HighAI Summary for RFQ SCL-767069239 Flume Creek Culvert Replacement and Channel Restoration: This Request for Qualification (RFQ) SCL-767069239 issued by Seattle City Light seeks a consultant for the Flume Creek Culvert Replacement and Channel Restoration at Boundary Road (County Road 2975). The RFQ was released on January 2, 2026, with a submission deadline of January 30, 2026. The consultant will develop final construction design drawings, conduct surveys and studies, provide permitting support, develop specifications, and offer construction support. The project involves replacing a culvert with a fish passable structure, sediment management, floodplain restoration, and wetland impact mitigation. Design and permitting are expected to complete in 2027, with construction from 2028 to 2029. The document includes procurement contact details, project background, scope of work, schedule, and attachments relevant to the solicitation.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ #SCL-767069239: Flume Creek Culvert Replacement and Channel Restoration: Request for Qualifications (RFQ) issued by Seattle City Light on January 2, 2026, to hire a consultant for the Flume Creek Culvert Replacement and Channel Restoration project. The scope includes final construction design, surveys, geotechnical and environmental studies, permitting support, and construction support to replace a culvert with a fish-passable structure and restore the channel and floodplain. Responses are due by January 30, 2026.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ #SCL-767069239: Flume Creek Culvert Replacement and Channel Restoration: Request for Qualifications (RFQ #SCL-767069239) issued by Seattle City Light for the Flume Creek Culvert Replacement and Channel Restoration at Boundary Road. The project involves replacing a culvert with a fish-passable structure, removing historic water control structures, sediment management, and floodplain restoration. The selected consultant will provide final construction design drawings, surveys, geotechnical and environmental studies, permitting support, and construction support. Responses are due by February 13, 2026.
DOCX
DOCX, High priority: read this first2 pages · risk-assessment-template
HighAI Summary for Risk Assessment Template for Controllable and Uncontrollable Risks: This document is a risk assessment template divided into two sections: Assessment of Controllable Risks and Assessment of Non-Controllable Risks. It provides instructions and a structured format for consultants to identify and describe risks related to a project, including their impact on cost, schedule, scope, and quality. Consultants must list risks in order of priority and provide detailed solutions including action steps, potential impacts, and response plans. The template emphasizes risk mitigation strategies focusing on early collaboration, transparent communication, and proactive planning. The document is intended to be used as a mandatory format with strict guidelines on modifications and page limits (2 pages max for each section).
DOCX
DOCX, High priority: read this firstsupporting-document
HighAI Summary for WMBE Inclusion Plan – Consultant Contracts: A mandatory submission form for City of Seattle consultant contracts valued above $343,000. The document requires prime contractors to outline aspirational Women and Minority Business Enterprise (WMBE) goals, identify core and non-core work assignments, provide past performance evidence of WMBE integration, and describe inclusion strategies. Failure to submit this plan may result in a solicitation response being deemed non-responsive.
DOCX
DOCX, Low prioritysupporting-document
LowAI Summary for City of Seattle Consultant Questionnaire: A mandatory administrative form for consultants submitting proposals to the City of Seattle. The document collects firm information, billing contacts, registration status, ownership history, financial responsibility, social equity compliance, legal disputes, and organizational conflicts of interest.
PDF
PDF, Low priority178 pages · environmental-report
LowAI Summary for Environmentally Sensitive Areas Report for Flume Creek Culvert Replacement Project: This draft Environmentally Sensitive Areas Report, dated 2/11/2025, was prepared for the Flume Creek Culvert Replacement at Boundary Road Project under the Boundary Hydroelectric Project (FERC No. 2144). It assesses wetlands, frequently flooded areas, fish and wildlife habitat conservation areas, and buffers within the project study area in Pend Oreille County, Washington. The report includes wetland and stream delineations conducted in 2023 and 2024, identifying seven wetlands and two streams. It outlines applicable environmental laws, study methods, and detailed wetland classifications and ratings. The report is intended to support project design and regulatory review, with final impact and mitigation assessments to be presented in a subsequent version.
PDF
PDF, Low priority4 pages · other
LowAI Summary for Evaluation Committee Member Roles and Responsibilities for RFQ #SCL-767069239: This document outlines the roles and responsibilities of Evaluation Committee members for RFQ #SCL-767069239, dated 12/22/2025. It details the purpose of the Evaluation Team, appointment procedures, duties of the Contract Administrator and team members, and the evaluation process including interviews and demonstrations. The document emphasizes confidentiality, public disclosure, conflict of interest policies, and fair evaluation practices. It also describes procedural steps before and after solicitation release, including scheduling, scoring, and decision-making processes. The document serves as guidance for committee members to ensure a fair, thorough, and transparent evaluation process.
PDF
PDF, Low priority31 pages · report
LowAI Summary for Flume Creek Site Characterization Report (NSD 2023): This document is the Flume Creek Site Characterization Report prepared by Natural Systems Design, Inc. in 2023 to support Seattle City Light's efforts in planning habitat enhancement actions at Flume Creek, a tributary to the Pend Oreille River in Washington State. The report provides an overview of the watershed, existing conditions of the creek channel and floodplain, and design considerations for replacing culverts and placing large wood to improve fish habitat. It supports the implementation of Protection, Mitigation, and Enhancement measures required by the Federal Energy Regulatory Commission license for Boundary Dam. The report includes detailed sections on watershed characteristics, land ownership, geology, soils, fisheries, and hydrology relevant to the project area.
DOCX
DOCX, Low priority1 page · other
LowAI Summary for List of Subconsultants - Attachment E: This document is an attachment titled 'List of Subconsultants - Attachment E' which requires the Consultant to list proposed Subconsultants as part of their project team. It includes instructions on listing each Subconsultant by legal designation and business type, and states that no changes to the list are allowed without written permission from City Light. The document also contains a declaration of truthfulness by the Consultant. It serves as a supporting document for a project but does not contain solicitation or contract award information.
DOCX
DOCX, Low priority1 page · presolicitation
LowAI Summary for Pre-Submittal Meeting Agenda for RFQ #SCL-767069239: This document is the agenda for the Pre-Submittal Meeting related to RFQ #SCL-767069239 for the Flume Creek Culvert Replacement and Channel Restoration at Boundary Road (County Road 2975). The meeting is scheduled for Thursday, January 14, 2025, from 11:00 AM to 12:15 PM PST and will be held virtually via Microsoft Teams. It includes details for joining the meeting, such as the meeting ID, passcode, dial-in phone number, and video conferencing options. Attendees are requested to confirm their attendance by completing a Pre-Submittal Meeting Attendance Roster link shared during the meeting.
DOCX
DOCX, Low priority4 pages · other
LowAI Summary for Resume of Key Project Team and Org Chart Attachment C: This document is a template for submitting resumes of key project team members and an organizational chart as part of a Request for Qualifications (RFQ). It includes instructions for providing two-page resumes for each key team member, describing their experience and qualifications related to the project scope. The document outlines the roles and responsibilities of various key team members such as Project Manager, Lead Civil Engineer, Lead Hydraulics & Hydrology Engineer, and others. It also requires a narrative describing the team and an overall project team organizational chart identifying key members and sub-consultants, including their proposed percentage of time assigned to the project by task.
PDF
PDF, Low priority1 page · other
LowAI Summary for Selection Team Member Rules for RFQ SCL-767069239: This document outlines the rules and instructions for members of the evaluation team involved in the RFQ SCL-767069239 process. It emphasizes the importance of personal contact restrictions, responsibility, fairness, confidentiality, and evaluation procedures. Team members are instructed to read proposals, score them based on evaluation factors in the RFP, justify extreme scores, and participate in consensus meetings. The document includes signature lines for team members and the Project Manager's role in presiding over meetings.
DOCX
DOCX, Low priority1 page · other
LowAI Summary for Unfair Advantage Guidance for Consultant Competition: This document discusses the concept of unfair advantage in consulting contracts, focusing on whether a preliminary consultant gains substantive or material advantages over other bidders. It outlines conditions under which a consultant may continue competing for future phases, emphasizing the importance of equal access to information and mitigation strategies to prevent conflicts of interest. The document provides guidance on handling situations where a consultant might influence project specifications or strategies to their benefit, recommending prohibition from future competition if such advantages cannot be mitigated.
DOCX
DOCX, Low priority3 pages · other
LowAI Summary for XPD Roles and Steps for Project Manager: This document outlines the roles and process steps for Expertise-Driven Project Delivery (XPD) in project management. It details onboarding activities, evaluation and selection phases, and contracting and pre-award clarification steps. The document assigns responsibilities between SCL C&P and the Project Team for tasks such as RFP development, proposal evaluations, interviews, final selection, and contract negotiations. It includes references to templates and training materials to support these processes. The document serves as a procedural guide rather than a solicitation or contract.
The City of Seattle is seeking qualifications for Project Title . Qualifications are due no later than Response Submission Time on Response Submission Date . All questions are to be submitted through the e-procurement portal at https://procurement.opengov.com/portal/seattle no later than Question Submission Time on Question Submission Date .
More opportunities from Washington → Seattle City Light
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.