Flume Creek Leftovers Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Transportation is preparing to rehabilitate 17 culvert systems comprising 30 segments along Interstate 5 in Shasta County, between post miles 56.70 and 66.50, using state and federal funds. The work aims to repair, replace, or upsize deteriorated culverts affected by corrosion, abrasion, joint separation, and deformation, which compromise structural integrity and hydraulic function. These deficiencies, particularly in smaller-diameter culverts, increase maintenance demands and threaten roadway stability if left unaddressed. The project will employ trenchless technology, cut-and-cover methods, concrete repairs, and liner installations to restore functionality and enhance resilience against future flow increases linked to climate change. Construction will involve temporary construction easements and four permanent drainage easements, with staging areas located at PM 61.70 and PM 64.59. Approximately 5.33 acres of soil will be disturbed, requiring clearing, grubbing, and limited tree removal, with excavation depths reaching up to 60 feet for trenchless installations. Lane closures will be implemented as needed, and all nearby utilities will be preserved in place. The project is scheduled for completion within a single construction season, requiring approximately 210 working days. No borrow or disposal sites are anticipated, as all excess soil and debris will become the contractor’s property. Consultation has been conducted with relevant agencies, tribes, and stakeholders, and the project requires permits from the Army Corps of Engineers under a Nationwide Permit, Regional Water Quality Control Board Section 401 certification, and a California Department of Fish and Wildlife Section 1602 Agreement. The initiative aligns with broader efforts to safeguard infrastructure reliability and environmental compliance, with Jana Marquardt of Caltrans District 2 serving as the primary point of contact. The project was posted as a forecast on June 30, 2026, under the title Flume Creek Leftovers Project.
General Info
Agency
NAICS
Place of Performance
Interstate 5, post miles 56.70 to 66.50, Shasta County, CASet-Aside
Timeline
Organization & Contact Information
Full Description