Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on September 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FMO26484 Exterior Stair Repairs Joint Force Headquarters Hanscom AFB (MA National Guard)

Closed
BD-27-1069-MILDV-10000-134016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation BD-27-1069-MILDV-10000-134016 is a lump-sum open market procurement issued by the Massachusetts Military Division for exterior stair repairs at the Joint Force Headquarters (JFHQ) Hanscom Air Force Base. The project, identified as FMO26484, has an estimated cost of 70,000 dollars and involves replacing the deteriorating southern exterior staircase. The scope of work includes replacing 14 concrete steps and landings using class A 4000 psi concrete, repairing pavers, improving the sub-base and drainage, and restoring and reinstalling prefabricated brushed stainless steel handrails with integrated LED lights. All work must comply with IBC 1011-7, ADA, OSHA, and ASTM standards, and the contractor must provide a one-year warranty on materials and craftsmanship. Bids are due by October 15, 2026, at 10:00 AM and must be submitted electronically via the COMMBUYS portal. A mandatory site visit was scheduled for October 7, 2026, and all personnel requiring base access must possess REAL ID-compliant identification. The contract will be awarded to the lowest responsible and eligible bidder. Required submission documents include a General Bid Form, a 5 percent bid bond, a Certificate of Non-Collusion, and a Commonwealth Authorized Signatory listing. Awarded contractors must provide liability insurance naming the MA National Guard as additionally insured and adhere to the higher of either Davis-Bacon or Massachusetts Department of Labor Standards prevailing wage rates, with certified payroll required for payment.

General Info

Massachusetts Military Division seeks $70,000 for exterior stair repairs at Hanscom Air Force Base.

Documents

42
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this firstifb
High
HTML, High priority: read this firstifb
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this firstrfq
High
PDF, High priority: read this firstitb
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · rfp
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this firstifb
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this firstrfq
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · ifb
High
DOCX, High priority: read this firstitb
High
DOCX, High priority: read this first2 pages · bid-form
High
PDF, High priority: read this first6 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstwage-determination
High
PDF, Low prioritycertificate-of-non-collusion
Low
HTML, Low priority1 page · other
Low
PDF, Low priorityother
Low
PDF, Low priorityspecial-notice
Low

Read all 42 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 44 days
  • 26_1119 – Robbinsdale-MNOpen now, due in 1 day
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 30, 2026 to Oct 15, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more

Full Description

Show more
JFHQ Exterior Stair Repairs Hanscom AFB (MA National Guard)

More opportunities from Massachusetts → Military Division

Same awarding agency

NAICS: 238220
New
SLED
FMO26281 HVAC Upgrade - Mini Split Installation Westfield AASF #2 (MA National Guard)
Solicitation # BD-27-1069-MILDV-10000-135319
The Military Division of Massachusetts is soliciting bids for an HVAC upgrade at the Westfield AASF #2 facility for the MA National Guard. The project involves the installation of two 5-ton outdoor compressor/condenser units supporting eight indoor air handlers across four specific areas: the Engine Repair Shop and Sheet Metal Shop (heating and A/C), and the GSE Room and Supply Rooms (A/C only). Technical requirements specify the use of R-454B refrigerant, the installation of protective bollards for outdoor units, and strict adherence to City, County, and State electrical codes. The estimated project cost is $55,000, and the contract will be awarded to the lowest, responsible, and eligible bidder based on a lump sum bid. Bidders must submit electronic quotes via COMMBUYS by November 30 at 10:00 AM, including a 5% bid bond, a Non-Collusion form, and a Commonwealth Authorized Signatory form. Awarded contractors must provide a certificate of liability insurance naming the MA National Guard as additionally insured and a payment bond of 50% of the project value. Labor requirements include the payment of prevailing wages, submission of certified payroll, and a mandatory 10-hour OSHA-approved construction safety course for all employees. The installation must be accepted by the Construction Facilities Management Office (CFMO), with warranty requirements of five years for compressors and sealed system parts and one year for all other parts and labor.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 14 days
View Details
NAICS: 562910
SLED
ITB 250597 RE-BID Remove and Replace Munitions Impacted Soils on the India Range Berm
Solicitation # BD-27-1069-MILDV-30000-135116
Solicitation BD-27-1069-MILDV-30000-135116 is an invitation to bid issued by the Massachusetts Military Division for the removal and replacement of munitions-impacted soils on the India Range Berm at Camp Edwards, Joint Base Cape Cod. The scope of work requires the excavation of the top layer of loam and soil to a depth of 40 inches, the containment and disposal of copper and lead contaminated materials, and the restoration or replacement of the fabric liner. Following remediation, the contractor must install new 1/4 inch minus soils across the entire berm, apply jute mats, and perform hydro seeding. All project activities must be 100 percent complete by December 30, 2026. The contract will be awarded as a lump sum to the lowest responsible and eligible bidder. Mandatory requirements for bidders include a site visit on November 10, 2026, and electronic submission via COMMBUYS by November 18, 2026. Bidders must provide a 5 percent bid bond for projects exceeding 50,000 dollars, along with certifications for non-collusion, Massachusetts tax compliance, and OSHA safety training for all personnel. Due to the nature of the facility, all contractor personnel must comply with REAL ID requirements and FAR 52.204-9 and HSPD-12 for personal identity verification and background checks. Performance is subject to strict quality control standards, including a 94 percent compaction requirement for backstop fill and a grading tolerance of plus or minus 1 inch for unpaved areas. The contractor is responsible for all geotechnical engineering testing, while the government's Environmental Officer will inspect the inner core layer for munitions. Labor must adhere to the provided prevailing wage schedule in compliance with Massachusetts General Law Chapter 149. Additionally, the contractor must provide performance and payment bonds equal to the contract price and maintain a minority workforce utilization percentage of 15.3 percent.
Remediation Services

POSTED

11 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS