Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on April 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Foam Densification Equipment Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract entails the supply of a commercial-grade foam densification system designed to process expanded polystyrene (EPS) at a rate of 440 pounds per hour, producing bales with a density of approximately 21 pounds per cubic foot. The equipment specified, such as the Runi SK370 or an approved equivalent, must include all necessary operational components to ensure complete functionality. Issued by the City of Sandy Springs, Georgia, this subcontract invites qualified suppliers to submit their proposals by the deadline of May 11, 2026. The procurement falls under the NAICS code 333318, which covers machinery manufacturing. The contract details emphasize the importance of meeting the performance criteria of the foam densification system to support efficient waste management or recycling operations. Further information and submission guidelines are accessible through the provided state government procurement portal.

General Info

Supply commercial foam densification system processing 440 lbs/hour, density 21 lbs/ft³, submit by May 11, 2026.

Documents

This scope was carved out of 26-046.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-046 Foam Densification System Purchase and Installation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Sandy Springs
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of a commercial-grade foam densification system (e.g., Runi SK370 or approved equal) capable of processing expanded polystyrene (EPS) at 440 lbs/hour with bale density of ~21 lbs/ft³, including all operational components.

More opportunities from Georgia → City of Sandy Springs

Same awarding agency

NAICS: 237110
SLED
27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027
Solicitation # 27-014
The City of Sandy Springs, Georgia, is soliciting bids for the 27-014 Trenchless Stormwater Pipe Rehabilitation Project to rehabilitate existing stormwater infrastructure at seventeen locations throughout the city. The project utilizes cured-in-place pipe (CIPP) lining methods for various pipe sizes, including 18-inch, 24-inch, and 30-inch diameters. The selected contractor must provide all necessary machinery, labor, and materials, ensuring all work adheres to Georgia Department of Transportation Standard Specifications and NASSCO CIPP Installation Guidelines. Key deliverables include pre- and post-CCTV inspection reports and a detailed quality control plan. Materials must be sourced from GDOT certified suppliers and stored according to strict temperature and time requirements to maintain resin integrity. Bids are due by November 19, 2026, and must be submitted exclusively through the Bonfire portal. The award is based on the total bid price, provided the contractor is deemed responsible and not in arrears to the city. Required documentation includes a bid price certification, a valid Georgia Utility License, and GDOT prequalification references. The contract requires strict compliance with the Drug-Free Workplace Act, the Georgia Security and Immigration Compliance Act, and Title VI of the Civil Rights Act of 1964. Once awarded, the contractor must commence work within ten days of the Notice to Proceed, with a total performance period of 120 calendar days to achieve substantial completion. Payment is processed monthly based on work evaluated by a city inspector, with the contractor eligible to request up to 90 percent of the contract price for incorporated work and approved on-site materials.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS