Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Fontana Walnut Residential Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fontana Walnut Residential Project, managed by the City of Fontana under Master Case No. 24-0060, is a comprehensive development effort to construct a 393-unit multi-family residential community on approximately 30.99 gross acres. The development consists of 103 detached cluster units, 113 detached motor court units, and 177 attached townhomes, supported by 786 garage parking spaces and associated infrastructure including drive aisles, landscaping, and utilities. To facilitate this, the project requires a General Plan Amendment to change land use from Multi-Family Medium/High to Multi-Family Residential, a zoning change from R-4 to R-3, the creation of a Planned Unit Development, and the subdivision of 35 parcels via Tentative Tract Map No. 20712. The scope also includes the upzoning of an additional 56.1 acres and the abandonment of a portion of Knox Avenue. The project is subject to rigorous environmental and technical compliance standards as detailed in a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program. Key technical requirements include a Preliminary Water Quality Management Plan adhering to Regional Water Quality Control Board standards, a Preliminary Sewer Study requiring a 960-foot upgrade of the sewer main to 10 inches, and a Phase I Environmental Site Assessment. Traffic impacts have been evaluated through a VMT Screening Analysis and a Traffic Impact Assessment, which recommend specific circulation improvements to maintain Level of Service C standards. Additionally, the project must comply with biological and archaeological guidelines, including the management of potential impacts on burrowing owls and the preservation of cultural resources, as well as adhering to EPA Tier 4 emission limits for construction equipment.

General Info

City of Fontana developing 393-unit residential community on 30.99 acres via PUD.

Agency

California → City of Fontana

NAICS

236118 - Residential RemodelersView NAICS

Place of Performance

Highland Avenue and Knox Avenue, and Jurupa Avenue and Alder Avenue, Fontana, CA, 92335

Set-Aside

NONE

Documents

(19)

Appendix G - Residential Development Site Preliminary Water Quality Management Plan

PDFsow

Update Phase I Environmental Site Assessment - Fontana Walnut 393 Project

PDFenvironmental-site-assessment

Appendix K - Fontana Upzoning Properties VMT Screening Evaluation Memo

PDFtechnical-memorandum

Appendix A - Residential Development Site Project Plan Set

PDFsow

Fontana Walnut Residential Project Initial Study/Mitigated Negative Declaration

PDFinitial-study-mnd

Appendix J - Residential Development Site Preliminary Sewer Study

PDFpreliminary-sewer-study

Appendix D - Residential Development Site Archeological Resources Inventory and Evaluation

PDFarchaeological-report

Appendix I-2 - Residential Development Site VMT Screening Analysis

PDFvmt-screening-analysis

Notice of Determination for Fontana Walnut Residential Project MCN 24-0060

PDFnotice-of-determination

Preliminary Geotechnical Evaluation for District Property 1, Fontana CA

PDFgeotechnical-report

Appendix C - Residential Development Site Biological Technical Report for Fontana Walnut Project

PDFbiological-technical-report

Fontana Walnut Residential Project Notice of Intent

PDFspecial-notice

Mitigation Monitoring and Reporting Program for Fontana Walnut Residential Project

PDFmitigation-monitoring-reporting-program

State Clearinghouse Summary Form for Fontana Walnut Residential Project

PDFenvironmental-summary

Appendix B - Residential Development Site Air Quality & GHG Assessment

PDFenvironmental-assessment

Appendix I-1 Administrative Draft Traffic Impact Assessment for Walnut Street and Highland Avenue Residential Project

PDFtraffic-impact-assessment

Notice of Completion & Environmental Document Transmittal - Fontana Walnut Residential Project

PDFnotice-of-completion

2025100627_CDFW_Comment on Fontana Walnut Residential Project MND

PDFcomment

Appendix H - Residential Development Site Noise Impact Assessment for Walnut Property Project

PDFnoise-impact-assessment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fontana
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Fontana
Office AddressN/A
Contacts
Alexia BarberenaAssociate Planner
Nolan LeggioVice President of Forward Planning

Interested Companies (1)

Show more
LSA Associates
Irvine, CA

Full Description

Show more
Project Title: Master Case No. (MCN) 24-0060; General Plan Amendment (GPA) No. 24-0004, Zoning District Map Amendment (ZCA) No. 24-0004 Tentative Tract Map No. 24-0009 (TTM No. 20712), Conditional Use Permit (CUP) No. 24-0023, and Design Review (DR) No. 24-0031 A request to change the General Plan Land Use Designation from Multi-Family Medium/High (R-MFMH) to Multi-Family Residential (R-MF), and change the zoning designation from Multi-Family Medium High Residential (R-4) to Multi-Family Residential (R-3), a request to subdivide 35 parcels to establish a condominium map and abandon a portion of Knox Avenue, a request to create a Planned Unit Development (PUD), and a request for site and architectural review of a new 393 multi-family unit development with associated improvements on approximately 30.99 gross acres.

Similar Contracts

Same NAICS industry code

NAICS: 236118
New
SLED
Housing Rehab-5525 Delona Road
Solicitation # 26-061
Santa Rosa County, Florida, is soliciting bids for a housing rehabilitation project located at 5525 Delona Road in Milton, Florida. The scope of work includes replacing windows at ten openings with windborne debris protection, installing a new kitchen sliding glass door and side entry door, and replacing the central HVAC system and registers. Additional requirements involve blowing attic insulation to achieve R-38, converting the primary bathroom shower with grab bars and GFCI outlets, replacing soffits with vented vinyl, wrapping fascia in aluminum coil, and recladding the rear addition with new vinyl siding and a water-resistive barrier. All work must comply with the Florida Building Code, OSHA standards, and the Americans with Disabilities Act. The project must reach substantial completion within 90 calendar days, with final completion and readiness for payment within 120 calendar days. Liquidated damages for delays are set at 75 dollars per day. Payment is structured with a 5 percent retainage, meaning the contractor is paid 95 percent of the work completed until final acceptance. Final payment is contingent upon a successful walkthrough by the homeowner and approvals from the Housing Program Inspector, the County Inspections Division, and the State Health Department. Bidders must be financially sound, of good reputation, and submit their proposals electronically via the OpenGov portal by October 14, 2026. Award selection is based on the best interest of the County, primarily considering the low bid alongside the contractor's qualifications.
Housing

POSTED

about 14 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236118
New
SLED
Solicitation A10-09-26-9613- Housing Rehab- Sequoyah County
Solicitation # A10-09-26-9613
Solicitation A10-09-26-9613 is a request for bids issued by the Housing Authority of the Cherokee Nation for the rehabilitation of a single-family home located at 704 NW 4th St, Muldrow, Oklahoma, in Sequoyah County. The scope of work includes carpentry, flooring, and tree removal, specifically involving window replacement, vinyl flooring installation, subfloor repair, and lapboard siding replacement. The project must be completed within 30 working days, with work commencing within two weeks of notification. Bids are due by October 6, 2026, at 5:00 P.M. The contract will be awarded to the lowest responsive and responsible bidder, with preference given to those with TERO certification from the Cherokee Nation Tribal Employment Rights Office. Mandatory submission documents include the Mandatory Bid Response sheet, the Work Write Up, and form HUD-5369-A. The project is subject to HUD general conditions, the Buy American Recovery Act, and Davis-Bacon wage determination OK20260079. Contractors must provide a one-year warranty on materials and workmanship and maintain appropriate commercial general liability and automobile insurance. Payment is structured with a minimum of 50 percent upon an inspection report and final payment upon 100 percent completion and acceptance by the HACN Inspector. Liquidated damages of 100 dollars per working day will be applied for extensions beyond the contract end date.
Cherokee Nation Housing Authority

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 236118
New
SLED
ADA Ramp
Solicitation # 171995
The Choctaw Nation Housing Authority is soliciting bids for the construction of an ADA-compliant ramp and landing at a residence in McAlester, Oklahoma. The project involves building a 5-foot wide flat landing extending 7 feet from the front porch with a 90-degree turn toward the parking area, anchored to the existing concrete porch. The ramp must be built to ADA specifications with a minimum clear width of 36 inches and include a concrete landing at the end that is at least 4 inches thick and extends 4 feet from the ramp. All work must meet or exceed 2019 IRC standards. Technical requirements specify the use of pressure-treated ground contact lumber and deck screws, 2x6 frame and deck material, joists spaced 16 inches on center, and 4x4 posts concreted at least 2 feet deep. Handrails must feature spindles at 4 inches on center and be sanded with rounded ends. Prospective contractors are required to visit the site before bidding, as change orders for identifiable site conditions will not be approved. The contractor is responsible for all measurements, material counts, permits, line locates, waste removal, and restoring the yard to mowing condition. Bids must be itemized, include a price validity date, and be submitted exclusively through the Housing Bid Board by September 28, 2026, at 4:30 p.m. This solicitation is subject to Davis-Bacon rules and provides preference to Indian organizations and Indian-owned economic enterprises. Project coordination is managed by Case Manager Andrea Strawn and Inspector Kevin Mings.
Choctaw Nation Housing Authority

POSTED

4 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS