Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Oregon was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Foothill Drive Sanitary Sewer Upgrade Project No. 7207

Closed
7207State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing infrastructure. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as grading, earthwork, and asphalt resurfacing. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this opportunity is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This solicitation is specifically targeted toward DBE, MBE, WBE, and SBE firms to encourage maximum participation. Eligible subcontractors must possess a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Selected subcontractors will be required to execute a standard subcontract agreement and meet general insurance requirements. Additionally, the prime contractor reserves the right to require payment and performance bonds totaling 100 percent of the subcontractor bid, with bond premiums reimbursed up to a maximum of 1.5 percent.
W.A. Rasic Construction Company

POSTED

about 2 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

Clean Water Services is soliciting sealed electronic bids for the Foothill Drive Sanitary Sewer Upgrade Project No. 7207, which involves upsizing 1,587 linear feet of an existing 10-inch sanitary sewer line to a 14-inch line using the pipe-bursting method within Commonwealth Lake Park in Oregon. Bids must be submitted electronically via Bid Locker by 2:00 p.m. local time on July 14, 2026, with no facsimile or email submissions accepted. All bidders must register with Bid Locker at no cost, hold current licenses from the Oregon Construction Contractors Board or Oregon Landscape Contractors Board as applicable, and comply with Oregon’s prevailing wage laws under ORS 279C.800 to 279C.870. Bidders must also be licensed under ORS 468A.720 for asbestos abatement if relevant and must disclose their resident or nonresident status per ORS 279A.120. A bid bond, performance bond, payment bond, and public works bond are required, with performance and payment bonds due within ten days of award. Nonresident bidders may face a bid preference adjustment based on the percentage of preference their home state grants to Oregon contractors, as determined by the Oregon Department of Administrative Services. The bid must include a complete, signed Bid Form with unit prices in ink or typewritten format, a First-Tier Subcontractor Disclosure Form submitted within two working hours of bid closing, a Resident/Nonresident Bidder Status Form, and all other attachments specified in the contract documents, including engineering calculations approved by a registered Oregon civil engineer, third-party testing verification, manufacturer certifications, and compliance with ASTM F1216, D638, and D790 standards. Work must comply with all federal, state, and local regulations, including ADA requirements for temporary accessibility, and meet first-class workmanship standards. The contractor must provide a Site-Specific Safety Plan, name a safety manager, ensure all subcontractors carry proper insurance, and maintain workers’ compensation coverage with at least $500,000 in employer’s liability. Payment will be made based on actual quantities performed at unit prices listed in the bid form, with retainage released within 30 days after final acceptance. The project must be completed by November 29, 2026, with a one-year warranty on all

General Info

Submit electronic bid by July 14, 2026, for 10-inch to 14-inch sewer upgrade using pipe-bursting in Commonwealth Lake Park.

Documents

3

ITB Foothill Drive Sanitary Sewer Upgrade Project No. 7207

PDF, High priority: read this firstitb
High

Project 7207: Foothill Drive Sanitary Sewer Upgrade - Unverified Bid Results

PDF, Low prioritybid-results
Low

Project 7207: Foothill Drive Sanitary Sewer Upgrade - Verified Bid Results

PDF, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Clean Water Services
ContactsNo contacts available
OfficeUSA
Organization / AgencyOregon → Clean Water Services
Office AddressUSA
ContactsNo contact information available

Full Description

Show more
Sealed written bids for construction of the Foothill Drive Sanitary Sewer Upgrade Project No. 7207 (Project) will be received by Connie Wilson, Procurement Specialist, electronically via Bid Locker at https://bidlocker.us/details/6119 until the bid closing deadline of 2:00:00 p.m., local time, July 14, 2026, after which time bids will not be received.
It is each Bidder’s responsibility, when submitting its Bid electronically via Bid Locker, to ensure timely delivery by submitting its Bid sufficiently in advance of the deadline. Before bidders can submit their bids, they will need to register with Bid Locker at https://bidlocker.us/Home/bidlockerus. There is no cost to register. Clean Water Services (District) will not accept bids by facsimile or email.
Each bidder must be licensed by the Oregon Construction Contractors Board (or, for landscaping projects, licensed by the Oregon Landscape Contractors Board). Prevailing wage rates must be paid by bidder and any subcontractor on the project in accordance with ORS 279C.800 to 279C.870. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined by ORS 279A.120. Bidders must be licensed under ORS 468A.720 (regarding licensing of contractors on projects involving asbestos abatement). District will not receive or consider any bid that is not in compliance with the Instructions to Bidders and the Contract Documents. Bidders and any subcontractors will be required to have a public works bond filed with the Construction Contractors Board before starting work on the Project unless there is an applicable exemption under ORS 279C.836(4), (7), (8) or (9).
Upon bid closing, District will publicly open and read aloud by telephone conference all bids received by District. Bidders can attend the opening by calling the telephone conference number (503) 681-4497. Bidders must submit their First-Tier Subcontractor Disclosure Form to the same Bid Locker location within two working hours of the bid closing time (Deadline). District will reject any bid received that does not have a First-Tier Subcontractor Disclosure Form submitted by the Deadline.
The Project consists of the following work: This Project consists of upsizing an existing 1,587 linear feet, 10-inch sanitary sewer line to a 14-inch sanitary sewer line through the pipebursting method within Commonwealth Lake Park.

More opportunities from Oregon → Clean Water Services

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS