Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FOPR for GLEN 26-1004 CSOF Bollards

Closed
FA255026R0050Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Schriever Space Force Base requires the construction of concrete-filled bollards along a designated section of the south restricted area fencing to meet current anti-terrorism and force protection standards as defined by the Unified Facilities Guide Specifications and the base defense plan. The existing fencing and operable sliding gates in this area are non-compliant and must be upgraded to enhance security. The contract involves developing detailed shop drawings and executing all necessary construction activities including procurement and installation of the bollards as illustrated in Figure 1. The total performance period is 180 days commencing from the Notice-To-Proceed date. The solicitation titled FOPR for GLEN 26-1004 CSOF Bollards with number FA255026R0050 was posted on August 4, 2026, with responses due by August 20, 2026. The North American Industry Classification System code is 236220 and the contracting office is under the Department of Defense located at Schriever SFB in Colorado. Primary point of contact for inquiries is Michelle Joann Hubbard, reachable via phone or email provided.

General Info

Construct concrete-filled bollards at Schriever SFB to meet anti-terrorism standards within 180 days.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Schriever Space Force Base, CO, 80912

Set-Aside

NONE

Documents

19

A/E/C Computer-Aided Design (CAD) Standard Release 6.1

PDF, High priority: read this firstspecifications
High

Amendment 1: FOPR GLEN 26-1004 CSOF Bollards

PDF, High priority: read this firstamendment
High

Attachment 11 Pre-Bid RFI As-built from ECP MILCON

PDF, High priority: read this firstspecifications
High

Construction Cost Estimate Breakdown - Eglin Air Force Base

XLS, High priority: read this firstspecifications
High

Fence Repair Plan - GLEN 20

PDF, High priority: read this firstspecifications
High

GLEN 26-1004 Construct CSOF Bollards Technical Requirements

PDF, High priority: read this firstsow
High

GLEN 26-1004 CSOF Bollards Fair Opportunity Proposal Request

PDF, High priority: read this firstrfp
High

GLEN 26-1004 CSOF Bollards FOPR Amendment 2

PDF, High priority: read this firstamendment
High

Schriever AFB Instruction 17-201: C4 Systems Configuration Management

PDF, High priority: read this firstspecifications
High

Attachment 07 Blank AF Form 66 Submittal Register

XLSX, Low prioritysubmittal-register
Low

GLEN 26-1004 CSOF Bollards - RFI #1

PDF, Low priorityq-and-a
Low

Request for Information (RFI) Blank Form

PDF, Low priorityrfi
Low

RFI's for GLEN 26-1004 CSOF Bollards

PDF, Low priorityq-and-a
Low

Schriever SFB IT Request Authorization for Restricted Areas

PDF, Low priorityother
Low

Schriever SFB Vehicle Access Authorization for Restricted Area (RAVP Template)

PDF, Low priorityother
Low

0001_Attachment_14_Drop_off_Location_for_the_barriers.png

PNG

Attachment_02_2_AEC_TITLEBLOCK_6_1.dwg

DWG

Attachment_09_Base_Access_List___Non_U_S_Born.xlsx

XLSX

Attachment_10_Base_Access_List___U_S_Born.xlsx

XLSX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2550 50 Cons Pkp
Contacts1 person available
OfficeSCHRIEVER SFB, CO, 80912-2116, USA
Office AddressSCHRIEVER SFB, CO, 80912-2116, USA
Contacts

Full Description

Show more
Schriever SFB (SSFB) requires construction for a section of the south restricted area (RA) fencings. This section of the RA fencing and operable sliding gates are currently not meeting the most recent anti-terrorism and force protection (ATFP) requirements per the Unified Facilities Guide Specifications (UFGS) and base defense plan (BDP) and requires renewal. The total Period of Performance (PoP) is 180 days from Notice-To-Proceed (NTP). Provide services to develop shop drawings and provide construction services to procure and install concrete filled bollards along selected section of the RA fence line shown in Figure 1.

More opportunities from Department Of Defense → FA2550 50 Cons Pkp

Same awarding agency

NAICS: 236220
Federal
USSF Construction CSO
Solicitation # USSF-CSO-FY26-2808A
The United States Space Force (USSF) Space Operational Contracting Headquarters has established a Master Commercial Solutions Opening (CSO) under solicitation number USSF-CSO-FY26-2808A to streamline the design, construction, repair, and alteration of base infrastructure. Authorized under 10 U.S.C. § 2808a, this framework utilizes Other Transaction (OT) authority, making all resulting agreements completely exempt from the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS). The Master CSO serves as an umbrella solicitation, with specific project requirements published separately as Areas of Interest (AOIs). All awards must be structured as fixed-price agreements, including firm-fixed-price, fixed-price incentive, or fixed-price award fee structures, while cost-reimbursable agreements are strictly prohibited. The solicitation process employs a phased down-select method to minimize industry costs, consisting of a Phase 1 White Paper, a Phase 2 Oral Pitch, and a Phase 3 Full Commercial Proposal. Evaluation focuses on technical merit, constructability, schedule viability, and fair and reasonable commercial pricing. Selected partners must adhere to commercial industry building codes such as IBC and NEC, and may be required to comply with Unified Facilities Criteria (UFC) and Anti-Terrorism/Force Protection (AT/FP) standards. Payment is managed through a milestone-based system, where fixed-price payments are triggered only upon the verifiable completion of work that has passed inspection. Additionally, contractors must comply with Davis-Bacon Act wage rates and maintain specific insurance coverages, including Professional Liability for design-build projects of at least $2M.
Commercial and Institutional Building Construction

POSTED

21 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS