Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Homeland Security was posted on October 25, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FOR DHS NMACC II CONTRACT HOLDERS ONLY - Design/Build of a Consolidated Administration Facility, added admin space, and removal/replacement of asphalt at USCG Station Charleston, Charleston, SC

Closed
70Z04723R43000003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Charleston, SC, 29401, USA

Set-Aside

NONE

Documents

69

14085369A-102 - USCGC Storrs Technical Drawing/Specifications

PDF, High priority: read this firstspecifications
High

Amendment 0002-R - Solicitation 70Z04723R43000003

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 70Z04723R43000003

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 70Z04723R43000003

PDF, High priority: read this firstamendment
High

Amendment 0006 - Construct Consolidated Base Administration Facility, USCG Base Charleston

PDF, High priority: read this firstamendment
High

Amendment 0010 to Solicitation 70Z04723R43000003

PDF, High priority: read this firstamendment
High

Amendment 5 Civil Drawings

PDF, High priority: read this firstamendment
High

Amendment Civil Set

PDF, High priority: read this firstamendment
High

Base Charleston LANT FASSO SCIF Construction Security Plan

PDF, High priority: read this firstspecifications
High

Base Command Cadre - Third Floor General Security Plan

PDF, High priority: read this firstspecifications
High

Construct Base Administration Facility - Project 14085369

PDF, High priority: read this firstsow
High

Construct Base Administration Facility - Section 01110 Design-Build General Paragraphs

PDF, High priority: read this firstsow
High

Construct Base Administration Facility - Specifications (Page 198)

PDF, High priority: read this firstspecifications
High

Dominion Energy Non-Residential Load Letter - Charleston Sector Building

PDF, High priority: read this firstspecifications
High

Electric Vehicle Support Equipment Configuration Standard Technical Order (SILC-CSTO-36-11)

PDF, High priority: read this firstspecifications
High

First Floor Plan - 14085369A-101

PDF, High priority: read this firstspecifications
High

First Floor Plan A-101

PDF, High priority: read this firstspecifications
High

FLETC-Charleston Center Design Guide

PDF, High priority: read this firstspecifications
High

General Decision Number SC20220041 - South Carolina Heavy Construction

PDF, High priority: read this firstwage-determination
High

General Decision SC20220004 - Heavy Dredging - South Carolina

PDF, High priority: read this firstwage-determination
High

Individual Space Criteria Sheet (ISCS)

PDF, High priority: read this firstspecifications
High

Individual Space Criteria Sheet (ISCS)

PDF, High priority: read this firstspecifications
High

Individual Space Criteria Sheet - Janitor Closet (Room 252)

PDF, High priority: read this firstspecifications
High

Price Proposal Form - Project 14085369 (70Z04723R43000003)

PDF, High priority: read this firstbid-schedule
High

Price Proposal Form - Project 14085369 (Amend 0007)

PDF, High priority: read this firstamendment
High

Price Proposal Form - USCG Base Charleston Admin Facility (Amend 0009)

PDF, High priority: read this firstbid-schedule
High

Process to Conduct Construction Activities in Areas under Land Use Controls - Charleston Naval Complex

PDF, High priority: read this first2 pages · specifications
High

Project 14085369 - Design-Build Criteria 1.7 Architectural

PDF, High priority: read this firstspecifications
High

Revised Individual Space Criteria Sheet (ISCS)

PDF, High priority: read this firstspecifications
High

RFP Guide Specifications: 18HSA Construct Consolidated Base Administration Facility

PDF, High priority: read this firstrfp
High

Sanitary As-Builts - Charleston Naval Redevelopment Authority

PDF, High priority: read this firstspecifications
High

Solicitation 70Z04723R43000003 Amendment 0001

PDF, High priority: read this firstamendment
High

Solicitation 70Z04723R43000003 Amendment 0003

PDF, High priority: read this firstamendment
High

Solicitation 70Z04723R43000003 Amendment 0004

PDF, High priority: read this firstamendment
High

Solicitation 70Z04723R43000003 Amendment 0005

PDF, High priority: read this firstamendment
High

Solicitation 70Z04723R43000003 Amendment 0007

PDF, High priority: read this firstamendment
High

Solicitation 70Z04723R43000003 Amendment 0008

PDF, High priority: read this firstamendment
High

Solicitation 70Z04723R43000003 Amendment 0009

PDF, High priority: read this firstamendment
High

Task Order Announcement 70Z04723R43000003 - USCG Base Charleston Administration Facility

PDF, High priority: read this firstrfp
High

Technical Specifications for Construction and Management of SCIFs V1.5

PDF, High priority: read this firstspecifications
High

UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, and Construction

PDF, High priority: read this first61 pages · specifications
High

USCG Base Charleston Utilities ICAM Phase 3.5 Site Plans

PDF, High priority: read this firstspecifications
High

USCG Base Charleston Utilities Site Plan

PDF, High priority: read this firstspecifications
High

USCG Boat Storage Geotechnical Engineering Report

PDF, High priority: read this firstspecifications
High

USCG Charleston NSCs 9 & 10 Geotechnical Report and Change Notice

PDF, High priority: read this firstspecifications
High

USCGC Storrs Technical Drawing/Specifications

PDF, High priority: read this firstspecifications
High

Veterans Terminal Bulkhead Reconstruction Geotechnical Data Report

PDF, High priority: read this firstspecifications
High

Wage Determination SC20220023 - Building Construction (Charleston County, SC)

PDF, High priority: read this firstwage-determination
High

Base Charleston Construct Consolidated Sector/Base Facility Project Summary

PDF, Low priorityother
Low

Base Charleston Expansion and Land Exchange FONSI/PEA

PDF, Low priority215 pages · determination-and-findings
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

13 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 21, 2023 to Mar 15, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 15, 2023 to Mar 31, 2023. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → FDCC(00047)
Contacts2 people available
OfficeNORFOLK, VA, 23513, USA
Office AddressNORFOLK, VA, 23513, USA

Full Description

Show more
This Opportunity is for contract holders on the DHS NMACC II ONLY. Contract was awarded on 06/26/2023 tor RQ-AECOM 2 JV. Listed in FPDS_NG with award amount of $51,930,500.00 The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation and other services for the design/build of the Consolidated Administration Building at Base Charleston that will house Base Charleston Administration personnel. This Consolidated Base Administration Building will house approximately seventy-two (72) staff in approximately 72,500 useable square feet. The Consolidated Base Administration Building is required to be a sustainable facility in accordance with the Council on Environmental Quality (CEQ) Guiding Principles for Federal Buildings, Dec 2020. The Consolidated Administration Building shall strive to incorporate the best in energy efficiency, environmental and advanced controls using a - whole building integrated design approach, as well as comply with ENERGY STAR standards. This building shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable to achieve net zero energy and emissions per Executive Order (EO) 14057. The project will also include the following two options: Option Item #1: The design/construction of approximately 3,000 SF of additional office space will be added to the design of the Base Administrative Facility. The space will support the Maintenance Augmentation Team (MAT) contingent currently housed on the Federal Law Enforcement Training Center (FLETC) complex. The additional space will be administrative only; and Option Item #2: The contractor shall remove and replace the roadway pavement on South Hobson Ave and North Port Drive/Brumby Street. The contractor shall remove the existing asphalt and aggregate and install new asphalt and aggregate with a geo-grid. Three Large Attachments - "Hydrostatic Flow Test, Enviromental Phase I EDDA Report, and NSC 9 and 10 Drawings" will be provided as uploaded documents to DOD Safe.

More opportunities from Department Of Homeland Security → FDCC(00047)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS