Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from South Carolina was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Force Main Installation – Pipe Supply and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 16 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract entails the supply and installation of 2,600 linear feet of force main piping, encompassing all necessary joints, fittings, pressure testing, and concrete encasement to ensure structural integrity and compliance with established standards. The work must adhere to ASTM C 478 for concrete pipe specifications and ACI 318 for concrete construction requirements, ensuring durability and pressure resistance under operational conditions. The scope is comprehensive, requiring full execution from material delivery through to final inspection and testing, with an emphasis on quality control and adherence to industry benchmarks. The procurement is classified as a subcontract under NAICS code 238910, indicating it falls within specialty trade contracting for plumbing, heating, and similar installations. It is issued by the City of Columbia in South Carolina, with a solicitation posted on April 28, 2026, and a strict response deadline of May 28, 2026. The place of performance and specific location details are not provided, but the work is expected to occur within the jurisdiction of the City of Columbia. Interested parties must submit proposals by the stated deadline to be considered for award, with no set-aside provisions indicated for small or disadvantaged businesses.

General Info

Supply and install 2,600 feet of ASTM-compliant force main piping by May 28, 2026.

Agency

South Carolina → City Of Columbia

Place of Performance

SC, USA

Set-Aside

NONE

Documents

This scope was carved out of BID031-25-26-WRO.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CDBE SS7655 Shady Lane FM Extension

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → City Of Columbia
ContactsNo contacts available
OfficeN/A
Organization / Agency
South Carolina → City Of Columbia
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of 2,600 LF of force main piping, including joints, fittings, pressure testing, and concrete encasement per ASTM C 478 and ACI 318.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS