Force Main Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Sealed bids for the Force Main Replacement project are due by 1:00 p.m. prevailing time on August 17th, 2026, submitted exclusively through the PennBid online platform. The project involves installing approximately 3,375 linear feet of new 20-inch force main and associated fiberoptic cable, linking a pump station on State Route 2017 to the Wastewater Treatment Plant at 870 S Front Street in Selinsgrove, Pennsylvania. Work is divided into two separate contracts: General Construction and Electrical Construction, each requiring independent bids. Bidding documents are freely accessible via PennBid, and each bid must include a certified check, bank money order, or bid bond equal to at least 10 percent of the total bid amount, payable to the Owner. Bidders must comply with the Commonwealth of Pennsylvania’s Steel Products Procurement Act and the Pennsylvania Prevailing Wage Act, with wage rates specified in the Project Manual. The successful bidder will be required to furnish a performance bond covering 100 percent of the awarded contract value. All contractors must adhere to federal and state non-discrimination laws, ensuring equal opportunity in employment regardless of race, creed, color, religion, sex, age, handicap, marital status, or national origin. A pre-bid meeting is scheduled for August 6th, 2026, at 10 a.m. at the ESCRA facility in Selinsgrove. The Owner retains the right to waive minor bid irregularities and to reject any or all bids without obligation.
General Info
Agency
NAICS
Place of Performance
Snyder County, PA, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (7)
See All 7 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
The Project consists of furnishing and installing approximately 3,375 linear feet of new 20” force main and fiberoptic cable, connecting from a pumpstation on State Route 2017 to the Wastewater Treatment Plant located at 870 S Front Street, Selinsgrove, Pennsylvania 17870.
The Project Work will be performed under two Contracts as follows:
CONTRACT ONE - GENERAL CONSTRUCTION CONTRACT TWO - ELECTRICAL CONSTRUCTION
Bidding Documents are available at no cost at PennBid - https://pennbid.net/
Each Bid shall be accompanied by a certified check, bank money order, or a Bid Bond in an amount not less than 10 percent of the Bid total, payable to the Owner in accordance with the Instructions to Bidders.
Laws and regulations applicable to this Contract include the following:
Commonwealth of Pennsylvania "Steel Products Procurement Act" - Act No. 3 of l978 as amended
Pennsylvania Prevailing Wage Act (Act of 1961, P.L. 987, No. 442). Bidders are subject to all applicable provisions of the Pennsylvania wage laws, and bids shall be prepared accordingly. The applicable wage predetermination is included in the Project Manual. The successful bidder will be required to provide a performance bond in the amount of 100% of the successful bid amount.
All contractors on this Project are required to ensure that employees and applicants will not be discriminated against because of race, creed, color, religion, sex, age, handicap, marital status or national origins; and, that the statutes and regulations of federal and state law regarding non-discrimination are met.
A pre-bid meeting will be held at 10 a.m., prevailing time, August 6th, 2026. The pre-bid meeting will be conducted at the ESCRA facility located at 870 S Front Street, Selinsgrove, PA 17870.
The Owner reserves the right, at its option, to waive as an informality any, defects, errors, or omissions in any or all Bids; and to reject any or all Bids.
Similar Contracts
Same NAICS industry code
More opportunities from Pennsylvania → Snyder County
Same awarding agency
