This Solicitation opportunity from Colorado was posted on February 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the Ford & Jackson Protected Bike Lanes Project, a key component of the 2023 Golden Pedestrian and Bicycle Plan. It involves constructing protected bike lanes on Ford and Jackson Streets between 14th and 24th Streets, along with a raised four-way intersection at Jackson and 24th Streets to enhance pedestrian safety near Golden High School. Additional improvements include intersection upgrades at Ford Street and 14th Street. This Tier 1 priority project focuses on creating dedicated, safe cycling infrastructure separated from vehicle traffic, aiming to reduce pedestrian and vehicle collisions. It also encompasses the reconstruction of curb ramps at nearly all intersections to ensure compliance with accessibility standards set forth by the Public Rights-of-Way Accessibility Guidelines (PROWAG).
The solicitation for this project was posted by the City of Golden's Public Works department on February 3, 2026, with a response deadline of March 4, 2026. The contracting opportunity is managed by project manager Sara Aupperle, who can be contacted for further details. The work is set to take place in Golden, Colorado. Relevant project information and updates have been made publicly available to ensure transparency and community engagement throughout the construction phase.
General Info
Construct protected bike lanes, raised intersection, curb ramps in Golden, Colorado; enhance safety and accessibility.
PDF, High priority: read this first38 pages · geotechnical-report
HighAI Summary for 18-064.14 Jackson and Ford Final Geotechnical Engineering Report: This final geotechnical engineering and pavement design report, dated October 17, 2025, was prepared by Yeh and Associates, Inc. for Muller Engineering Company regarding the City of Golden Jackson Street and Ford Street Improvements project in Golden, Colorado. The report presents the results of a subsurface geotechnical investigation including drilling three borings, laboratory testing, and evaluation of soil engineering characteristics. It provides engineering recommendations for pavement design, including Portland cement concrete pavement and hot mix asphalt, for the proposed multimodal roadway improvements such as a raised intersection and parking bump outs. The report includes site description, geologic setting, subsurface conditions, pavement design parameters, and construction recommendations to support the project design and construction phases.
PDF
PDF, High priority: read this first3 pages · design-memo
HighAI Summary for 18-064.14 Jackson and Ford Ramp Design Memo: This memorandum dated July 24, 2025, from Muller Engineering Company to the City of Golden details the curb ramp design for the Jackson and Ford Design Services project. The memo outlines the goal to install ADA compliant curb ramps while minimizing impacts to adjacent pavement and sidewalks, adhering to CDOT and CCD standards. It discusses design constraints due to steep existing grades and the need for unique solutions, including maximizing ramp slopes and turning spaces, adding curb extensions, and steepening sidewalks. Table 1 lists specific locations where design criteria were exceeded, explaining the reasons for these deviations and the measures taken to maintain compliance as closely as possible.
PDF
PDF, High priority: read this first18 pages · specifications
HighAI Summary for 18-064.14 Jackson to Ford Design Services - Denver Standard Drawings: This document titled '18-064.14 Jackson to Ford Design Services - Denver Standard Drawings' contains detailed engineering drawings and specifications related to design services for a project in Denver. It includes various sectional views, plans, and detailed drawings of components such as inlets, grates, frames, and adjustable curb boxes. The drawings are not to scale and include approval and design information, indicating their use for construction or design reference. The document appears to be a technical specification package dated 2020, providing standard design details for infrastructure elements.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for 18-064.14 Jackson to Ford Design Services Level of Design Memo: This memorandum dated 11/10/2025 from Muller Engineering Company to the City of Golden outlines the level of design detail provided for the Jackson and Ford Design Services project. It specifies three design levels: aerial based design with approximate horizontal limits and no survey or SUE; survey based design with horizontal control only on the west side of Jackson Street, requiring contractor field fitting for elevations; and survey based design with full horizontal and vertical control including topographic survey and SUE. The memo clarifies contractor responsibilities and the need for approval of construction variances by the City and project engineer.
DOC
DOC, High priority: read this first1 page · bid-bond
HighAI Summary for Bid Bond Form for City of Golden, Colorado: This document is a Bid Bond form intended for use by bidders submitting proposals to the City of Golden, Colorado. It establishes a financial guarantee by the Principal and Surety to the Obligee (City of Golden) that the Principal will enter into a contract and provide required performance bonds if their bid is accepted. The bond amount is specified in dollars and ensures payment of the difference if the Principal fails to contract. The form includes spaces for signatures, dates, and titles of the Principal and Surety representatives. This document is critical for bid submission compliance and contract award assurance.
PDF
PDF, High priority: read this first30 pages · standard-drawings
HighAI Summary for CDOT Standard Drawings M-412-1 Concrete Pavement Joints: This document contains the Colorado Department of Transportation (CDOT) standard drawings for concrete pavement joints, identified as Standard Plan No. M-412-1. The drawings include detailed specifications for dowel bar details, typical curbed pavement joint layouts, multi-lane intersections with speed change lanes, and railroad crossing joint details. The document was originally created on 07/31/2019 and last revised on 01/31/2022. It provides technical details such as pavement thickness, dowel bar diameters, reinforcement requirements, and joint seal specifications. The drawings are intended for use in construction engineering services and include notes on railroad joints and cul-de-sac joint terminations.
DOCX
DOCX, High priority: read this first3 pages · bid-certification
HighAI Summary for City of Golden 2026-ITB-001 Bid Certification for Ford & Jackson Protected Bike Lanes: This Bid Certification document is for the City of Golden Project No. 2026-ITB-001, titled Ford & Jackson Protected Bike Lanes Project. It certifies that the Bidder has independently prepared the bid in compliance with the City's Invitation to Bid and Instructions to Bidders. The document outlines the Bidder's commitment to perform the work as specified, the bid validity period of 45 days, and the requirement to execute a Construction Agreement and furnish performance and payment bonds if awarded. It also includes certifications regarding non-collusion, qualifications, and readiness to comply with contract provisions. The document is signed by the Bidder and includes spaces for corporate and contact information.
PDF
PDF, High priority: read this first11 pages · contract-document
HighAI Summary for Construction Contract Template for City of Golden Project: This Construction Agreement template is for projects under the City of Golden, Colorado. It outlines the mutual covenants between the City and the Contractor, including the scope of work, contract price, payment terms, contractor representations, and contract documents. The agreement specifies the contractor's obligations to furnish labor, materials, and professional services, and to complete the work in a workmanlike manner. Payment provisions include progress payments with a 5% retention, final payment conditions, and funding appropriations subject to TABOR compliance. The contractor also agrees to remedy defects for one year after substantial completion. The document is effective upon mutual execution and references additional contract documents such as bid bonds and general conditions.
PDF
PDF, High priority: read this first79 pages · standard-general-conditions
HighAI Summary for EJCDC C-700 Standard General Conditions of the Construction Contract 2018: This document is the EJCDC C-700 Standard General Conditions of the Construction Contract, 2018 edition. It establishes the fundamental rights, responsibilities, risk allocations, and contractual relationships between the Owner and Contractor for construction projects. The document is intended to be used with related EJCDC agreements and supplementary conditions, providing a standardized framework for contract administration. It includes detailed articles covering definitions, preliminary matters, contract documents, commencement and progress of work, site conditions, bonds and insurance, and contractor responsibilities. The document is copyrighted by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, and is subject to a license agreement governing its use and modification.
PDF
PDF, High priority: read this first25 pages · supplementary-conditions
HighAI Summary for EJCDC Supplementary Conditions of the Construction Contract 2018: This document is the 2018 edition of the EJCDC Supplementary Conditions of the Construction Contract, prepared by the American Council of Engineering Companies and endorsed by related professional organizations. It amends and supplements the EJCDC C-700 Standard General Conditions of the Construction Contract. The document includes definitions, preliminary matters, contract document requirements, contractor and owner responsibilities, changes to the contract, claims, payments, and dispute resolution. It also addresses electronic document protocols and delivery of bonds and insurance. The document is intended for use in construction contracts and should be adapted to specific project circumstances and governing laws.
PDF
PDF, High priority: read this first43 pages · specifications
HighAI Summary for Ford & Jackson PBL Construction Specifications - City of Golden: This document contains the construction specifications for the Ford & Jackson PBL project managed by the City of Golden Public Works Department, Muller Project Number 18-064.14. It includes the General Contract Conditions based on City of Golden standards, the 2023 Colorado Department of Transportation Standard Specifications for Road and Bridge Construction with project-specific amendments, and detailed construction specifications. The document also outlines standard construction details referencing multiple regional standards. Key content includes project special provisions dated January 20, 2026, standard special provisions, notice to bidders, commencement and completion schedules, work restrictions including holidays and school year considerations, and testing and inspection requirements.
PDF
PDF, High priority: read this first16 pages · ifb
HighAI Summary for Ford & Jackson Protected Bike Lanes Project Construction IFB: This Invitation for Bid (IFB) document from the City of Golden, Colorado, dated February 3, 2026, solicits electronic bids for the Ford & Jackson Protected Bike Lanes Project Construction. The project involves constructing protected bike lanes and intersection reconstructions at specified locations. Key details include a mandatory pre-bid conference on February 19, 2026, bid submission deadline on March 3, 2026, bid security requirements, and qualifications criteria for bidders. The document outlines instructions to bidders, bid preparation, and submission procedures, emphasizing compliance with the City's conditions and the requirement for licensed contractors in Colorado.
DOCX
DOCX, High priority: read this firstaward
HighAI Summary for Notice of Award for City of Golden Project: This Notice of Award document dated 9.16.21 notifies the contractor that their bid for the City of Golden, Colorado project has been accepted. It references the Invitation to Bid and requires the contractor to execute the Construction Agreement, furnish Performance and Payment Bonds, and provide insurance documentation by a specified date. Failure to comply may result in forfeiture of the bid bond and other legal remedies. The document includes an acknowledgment section for the contractor to confirm receipt and availability for a preconstruction conference as per the contract's General Conditions.
DOCX
DOCX, High priority: read this first1 page · notice-to-proceed
HighAI Summary for Notice to Proceed for Project under IFB: This Notice to Proceed document, dated as indicated, notifies the contractor to commence work on the specified project under the referenced IFB number. It establishes the contract start date and the deadline for substantial completion as per the contract's general conditions. The contractor must provide required insurance certificates before starting work and acknowledge receipt of this notice within three business days. The document includes signature lines for both the City of Golden and the contractor to confirm acknowledgment.
PDF
PDF, High priority: read this first159 pages · construction-plans
HighAI Summary for Project 18-064.14 Ford & Jackson Construction Plans: This document contains the 100% complete construction plans for Project No. 18-064.14, covering Ford and Jackson streets in the City of Golden. Prepared by Jackson and Ford Design Services under the supervision of the Department of Planning and Public Works, the plans include detailed sheets such as title sheets, general notes, typical sections, drainage, erosion control, landscaping, traffic signing and striping, structures, and survey control diagrams. The plans are dated between July 24, 2025, and October 31, 2025, and include standard details conforming to CDOT and Denver standards. Key content includes roadway typical sections, curb and gutter details, parking and bike lane layouts, and patching details for asphalt and concrete pavements.
PDF
PDF, Low priority1 page · other
LowAI Summary for City of Golden Tax Exempt Certificate 2025: This document is the City of Golden tax-exempt certificate for the year 2025. It certifies that the designated organization is exempt from Colorado Sales Tax and State Collected Local Sales Tax on purchases made from their own funds for exclusive use. The certificate may be revoked by the Department of Revenue for improper usage. Contact information for Matthew Poston, Director of Finance, is provided.
PDF
PDF, Low priority71 pages · swmp-report
LowAI Summary for Ford & Jackson PBL SWMP Report January 2026: This document is the Stormwater Management Plan (SWMP) Narrative prepared in January 2026 for the City of Golden Public Works Department by Muller Engineering Company. It details project representatives, site description, stormwater management practices, best management practices, biological impacts, dewatering, and includes engineer certification. The project involves intersection improvements along the Ford and Jackson Street corridor in Golden, CO, with a focus on managing stormwater during construction activities.
As part of the 2023 Golden Pedestrian and Bicycle Plan, Muller has spent the last year designing protected bike lanes on Ford and Jackson Streets between 14th and 24th Streets, a raised four-way intersection at Jackson and 24th to address pedestrian/vehicle collisions near Golden High School, and intersection improvements at Ford Street and 14th Street. This project is identified as a Tier 1 priority that will create a dedicated space for cyclists that provides safety and separation from vehicles. The project also includes reconstruction of curb ramps at nearly all intersection to bring them into compliance with PROWAG (Public Rights-of-Way Accessibility Guidelines). Additional information that has been provided to the public can be found here: https://www.guidinggolden.com/central-bike-ped
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.