Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Foreign Direct Investment Attraction Strategy

Closed
BT-2026CDE-CS-ED-01-PCanada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541613
New
SLED
Call 001 612004-133792The Massachusetts Department of Transportation is seeking a Design-Build contractor for the Mystic River Bicycle and Pedestrian Bridge project in Everett and Somerville, Massachusetts, under solicitation number 612004-133792, with proposals due by June 26, 2026. The project involves constructing a 1,270-foot bridge connecting Draw Seven Park and Assembly Square in Somerville to the Encore Resort in Everett, forming a critical link in the Mystic Greenways trail system. The bridge will feature a steel tied arch over the navigation channel, steel through girders, and steel plate girders for approach spans, along with shared-use paths, retaining walls, landscaping, security cameras, call boxes, and comprehensive site and bridge lighting. All work must comply with MassDOT Standard Specifications, AASHTO LRFD Bridge Design Specifications, NEMA 4X and 3R electrical standards, ADAAG, and Massachusetts Architectural Access Board Regulations. The project requires adherence to federal and state environmental regulations including NEPA, Section 106 of the National Historic Preservation Act, MEPA, and the Clean Water Act, with extensive documentation including stormwater pollution prevention plans, wetland permits, and coordination with the MBTA through safety directives and operational protocols. A comprehensive construction monitoring plan must track vibration, settlement, and structural movement, and final acceptance requires approved operations and maintenance manuals for all installed systems. The solicitation follows a Best Value Design-Build selection process using a Lowest Cost Per Quality Point methodology, with project management and coordination accounting for 33% of the evaluation weight. Proposals must include both technical and price components, and successful proposers will be awarded a contract estimated at $53 million. Unsuccessful proposers who submit timely, responsive proposals are eligible for a $112,000 stipend payable within 90 days after contract execution or termination. The project includes strict confidentiality requirements under the ATC process and Attachment E, prohibits copyrighting of any work product, and declares all deliverables as works for hire belonging entirely to MassDOT. Submittals must be delivered via Dropbox with mandatory acknowledgment of all addenda, and hard copies of full-size and half-size plans are required. Key milestones include a Notice to Proceed anticipated for October 7, 2026, with Contractor Field Completion at 1,029 calendar days from NTP, Substantial Completion at 989 days, and Full Beneficial Use at
Massachusetts Department of Transportation

POSTED

in 8 days

DEADLINE

in 8 days
NAICS: 541613
New
SLED
Call 023 CN264037The Tennessee Department of Transportation is soliciting bids for Call 023 CN264037, a construction contract targeting the installation of profiled thermoplastic pavement markings and trenchless pipe installation in Lake, Tennessee. The work involves applying 4-inch and 6-inch audible pavement markings, requiring surface preparation, application, curing, traffic protection, and all necessary equipment and materials, with compensation provided at unit prices regardless of final quantities. Trenchless pipe installation methods such as horizontal directional drilling, jack and boring, and tunneling are also included, requiring engineering design validation and strict adherence to approved procedures. All work must comply with the Tennessee Department of Transportation Standard Specifications for Road and Bridge Construction, April 1, 2026 Edition, along with Supplemental Specifications, Special Provisions, and Contract Plans, which take precedence in order of hierarchy. The contract mandates a Performance Bond, Payment Bond, and Proposal Bond, and bidders must carry general liability insurance of at least one million dollars. All prime contractors, except those bidding solely for mowing or litter removal, must be licensed by the Tennessee Department of Commerce and Insurance in applicable classifications including Heavy Construction, Highway, Railroad, Airport Construction, Specialty, Municipal and Utility Construction, or Electrical Contracting, and must also be in good standing with the Tennessee Secretary of State. Prequalification is mandatory and must be completed at least fourteen days before bid opening, with a $25 fee required per authorized bid. Proposals must be submitted electronically via TDOT’s Bid Express website, and failure to include a unit price for every line item will result in rejection as irregular. Payroll documentation must be submitted weekly, certified as accurate and complete, with full employee details required on initial submissions and only address updates thereafter; wage rates must meet or exceed the Commissioner of Labor’s determinations, and employment records are subject to audit by both the contracting agency and the Department of Labor. Final payment is withheld until all deficiencies are corrected, and the contract is subject to the Tennessee Prevailing Wage Act. Contractors must also certify compliance with the Byrd Anti-Lobbying Amendment and demonstrate efforts to utilize Minority/Women-Owned Business Enterprises where subcontracting is involved. Bidders must be free of recent felony convictions, debarments, defaults on prior public contracts, and unpaid federal tax liabilities. Work cannot begin until after a preconstruction conference and is governed by the contract effective date or commencement date, whichever comes first. Although total bids will be posted, award evaluation is based solely on meeting mandatory prequalification
Tennessee Department of Transportation

POSTED

in 8 days

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Sault Ste. Marie is requesting proposals from qualified engineering and consulting firms to develop and support the implementation of a Foreign Direct Investment Attraction Strategy aimed at driving economic growth and competitiveness. The solicitation, identified as BT-2026CDE-CS-ED-01-P, was posted on June 8, 2026, with a strict response deadline of June 9, 2026, at 1:00 AM, leaving only one day for submissions. Although the notice lists the agency as the City of Sault Ste. Marie, it is categorized under Federal organization type and associated with the Government of Canada, indicating potential alignment with broader national economic development priorities. The contract requires technical expertise in investment strategy formulation, regional economic analysis, and stakeholder engagement to identify actionable pathways for attracting international capital. Proposals must demonstrate relevant experience, methodological rigor, and a clear understanding of local economic conditions. All submissions must be directed to Karen Marlow, the Contracting Authority, via the provided email or phone number, and further information can be accessed through the official Canada Buys tender portal.

General Info

City of Sault Ste. Marie seeks rapid proposal for foreign investment strategy by June 9, 2026, aligning with federal economic goals.

Agency

Government of Canada → City Of Sault Ste. MarieView Agency

NAICS

541613 - Marketing Consulting Services View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City Of Sault Ste. Marie
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → City Of Sault Ste. Marie
View Agency Profile
Office AddressN/A
Contacts
Karen MarlowContracting Authority

Full Description

Show more
The City of Sault Ste. Marie is seeking proposals from qualified engineering and consulting firms to support the implementation of a Foreign Direct Investment Attraction Strategy.