Forest Lawn Cathedral City Specific Plan Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Forest Lawn Cathedral City Specific Plan (PLAN-SP-25-0001) is a comprehensive development project by the Forest Lawn Memorial-Park Association to establish a long-term plan for a 10-acre property in Cathedral City, California. The project involves the redevelopment of a former self-storage facility and existing cemetery parcels to expand cemetery uses. This includes the construction of up to 12,000 square feet of new occupiable floor area and 275,000 square feet of new non-occupied floor area for wall crypts, columbaria, and burial gardens. The plan will add approximately 70,000 interment spaces, bringing the total site capacity to roughly 84,000 spaces, 30,000 square feet of occupied floor area, and 315,000 square feet of non-occupied floor area. To facilitate this, a General Plan Amendment (PLAN-GPA-25-0001) will change the land use from General Commercial to Neighborhood Commercial, and a Change of Zone (PLAN-PLCZ-25-0001) will transition the zoning from Planned Community Commercial to Neighborhood Business Park. The project has undergone extensive environmental review under the California Environmental Quality Act (CEQA), resulting in a Mitigated Negative Declaration. Technical assessments have addressed vehicle miles traveled, greenhouse gas emissions, air quality, and noise and vibration impacts, with most findings indicating less than significant impacts provided specific mitigation measures are implemented. A jurisdictional assessment was also conducted to evaluate water and wetland status on the site. The City of Cathedral City officially approved the project via a Notice of Determination on May 27, 2026. Construction is scheduled to begin on April 1, 2026, with the project becoming fully operational in 2028.

General Info

Forest Lawn expands Cathedral City cemetery, adding 70,000 spaces and new facility areas.

Agency

California → City of Cathedral City

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Ramon Road and De Vall Drive, Cathedral City, CA, 92234

Set-Aside

NONE

Documents

(12)

G - VMT Screening Evaluation for Forest Lawn - Cathedral City Specific Plan

PDFtechnical-memorandum

Forest Lawn - Cathedral City Construction Health Risk Assessment

PDFhealth-risk-assessment

E - Phase I ESA

PDF

Jurisdictional Assessment for Forest Lawn Cathedral City Project

PDFjurisdictional-assessment

Forest Lawn - Cathedral City Specific Plan Project Summary Form

PDFenvironmental-summary

Forest Lawn - Cathedral City Specific Plan Greenhouse Gas Analysis

PDFgreenhouse-gas-analysis

Forest Lawn Notice of Intent to Adopt Mitigated Negative Declaration

PDFspecial-notice

NOD - Forest Lawn Cathedral City Specific Plan Project

PDFnotice-of-determination

Forest Lawn - Cathedral City Specific Plan Noise and Vibration Analysis

PDFnoise-analysis

Forest Lawn - Cathedral City Specific Plan Project Notice of Completion

PDFnotice-of-completion

Forest Lawn Cathedral City Specific Plan Project IS/MND January 2026

PDFmitigated-negative-declaration

Forest Lawn - Cathedral City Specific Plan Air Quality Impact Analysis

PDFair-quality-analysis

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Cathedral City
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Cathedral City
Office AddressN/A
Contacts
Sandra MolinaCommunity and Economic Development, Deputy Director
Forest Lawn Memorial - Park AssociationApplicant

Interested Companies (1)

Show more
T&B Planning
Irvine, CA

Full Description

Show more
Proposed Forest Lawn – Cathedral City Specific Plan (PLAN-SP-25-0001) to provide a long-term plan for the entire 10-acre Cathedral City property (existing cemetery parcels and the redevelopment of the former self-storage facility with cemetery uses). The proposed Specific Plan would allow for the construction of up to 12,000 sf of occupiable floor area for new structures, up to 275,000 sf of new non-occupied floor area (for such uses as wall crypts, columbaria, and burial and cremation garden structures), and 70,000 interment spaces. The proposed Specific Plan would allow for a total of approximately 30,000 sf of occupied floor area, approximately 315,000 sf of non-occupied floor area, and approximately 84,000 interment spaces within the entire proposed Specific Plan area. The proposed General Plan Amendment (PLAN-GPA-25-0001) would change the land use designation for the Specific Plan area from General Commercial (CG) to Neighborhood Commercial (CN) and the proposed Change of Zone (PLAN-PLCZ-25-0001) would change the zoning designation from Planned Community Commercial (PCC) to Neighborhood Business Park (NBP).

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity sewer mainline, decommissioning existing pump stations in the Romaine Village area, and installing service laterals for properties currently using onsite septic. The scope may also include minor transportation improvements, such as ADA curb ramp and intersection designs, with the selected consultant serving as the Engineer of Record during construction. The project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The solicitation, numbered 27-3214, has a response deadline of September 29, 2026. Proposals will be evaluated based on project understanding and approach, team qualifications, and firm experience, with the City of Bend selecting the highest scoring proposer to negotiate a final scope and fee schedule. The goal is to have the project advertised for construction services in Fall or Winter 2027. Parametrix is specifically soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small and disadvantaged businesses.
Parametrix

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering and environmental design services for the College Park East Stormwater Infrastructure Project (CIP SD2601) to mitigate chronic flooding in the College Park East neighborhood. The primary objective is to advance the project to a shovel-ready condition through a comparative evaluation of two pump station siting alternatives, Ironwood and Aster Park, and the subsequent development of 60, 90, and 100 percent plans, specifications, and estimates. The scope of work includes the design of storm drain lines, culverts, catch basins, and detention basins, as well as providing supplemental field surveys, public outreach, and environmental permitting in compliance with CEQA and NEPA. This procurement is funded in part by a U.S. EPA Community Project Funding award and is subject to federal procurement standards under 2 CFR Part 200, including domestic-preference requirements and non-discrimination mandates. Selection is qualifications-based per the Brooks Act and California Government Code, with evaluation weighted toward scope understanding (40 percent), team qualifications (25 percent), and project approach (25 percent). The contract is structured as a professional services agreement on a time-and-materials basis with a not-to-exceed value of 1.3 million dollars. Key requirements include adherence to California prevailing wage laws, monthly invoicing, and the maintenance of detailed project records for three years following completion. Proposals are due by 2:00 PM on September 22, 2026.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-ready-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive and includes utility locating, potholing, geotechnical and geophysical investigations, LIDAR, and a wide array of engineering support covering civil, structural, mechanical, electrical, and instrumentation and controls. Additional requirements include cathodic protection system design, BIM/3D modeling, commissioning and startup planning, land surveying, CPM scheduling, and comprehensive environmental services such as hazardous materials surveys, permitting support, and compliance monitoring. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system. Responsive bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and OBE firms. Bidders must demonstrate the ability to maintain labor harmony, as Kiewit is a signatory to several collective bargaining agreements. The bid date is September 11, 2026, and the primary point of contact for the project is Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS