This Government Contract opportunity from Department Of Agriculture was posted on May 11, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Amendment 2 to Solicitation AG-05G1-S-09-0010 (IDIQ Road Work): Amendment No. 2 dated April 2, 2009, for solicitation AG-05G1-S-09-0010 regarding IDIQ Road Work for the USDA Forest Service, Colville National Forest. This amendment incorporates 'Project A', a construction project, into the solicitation and specifies that pricing, technical approach, blasting methods, and schedules are to be included in the business and technical proposals.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 3 - Solicitation AG-05G1-S-09-0010 (IDIQ Road Work): Amendment No. 3 dated 4/4/2009 for solicitation AG-05G1-S-09-0010 regarding IDIQ Road Work for the Colville National Forest. This amendment incorporates 'Project B, Vulcan Road Reconstruction' into the solicitation, requiring a 20% bid guarantee and specifying that pricing, technical approach, and schedules for this project are part of the proposal submission.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 4 - Solicitation AG-05G1-S-09-0010 (IDIQ Road Work): Amendment 4 to solicitation AG-05G1-S-09-0010 for IDIQ Road Work, issued by the USDA Forest Service Colville National Forest on April 4, 2009. This amendment incorporates additional paragraphs in Sections B and C, adds Wage Determination No. 1977-0209, includes Example Project C for evaluation, revises Section L (Instruction for the Preparation of Technical and Business Proposals), and replaces Section M in its entirety.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 5 - Solicitation AG-05G1-S-09-0010 IDIQ Road Work: Amendment 5 to solicitation AG-05G1-S-09-0010 for IDIQ Road Work at Colville National Forest, dated April 14, 2009. This amendment extends the proposal and past performance survey due date to April 27, 2009. It incorporates preproposal meeting notes, a revised wage determination (WA 1), technical changes to Project A (Growden Energy Dissipater), site photos for Project B (Vulcan Road Reconstruction), and specifications for Project C regarding drainage, surfacing, decommissioning, and mobilization.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 6 - Solicitation AG-05G1-S-09-0010 IDIQ Road Work: Amendment 6 to solicitation AG-05G1-S-09-0010 for IDIQ Road Work at Colville National Forest, dated April 20, 2009. This modification corrects road numbers on the schedule of items for Vulcan Road - Project B and adds a tie-breaking procedure (drawing of lots) to the evaluation criteria in Section M. Proposals remain due April 27, 2009.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 7 - AG-05G1-S-09-0010 IDIQ Road Work: Amendment 7 to solicitation AG-05G1-S-09-0010 for IDIQ Road Work, issued by the USDA Forest Service Colville National Forest on April 23, 2009. This modification replaces map #2 for the Vulcan Road Reconstruction Project to include a water source and extends the proposal due date from April 27, 2009, to May 1, 2009, at 3:00 p.m.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 8 - Solicitation AG-05G1-S-09-0010 (IDIQ Road Work): Amendment 08 to solicitation AG-05G1-S-09-0010 for IDIQ Road Work, issued by the USDA Forest Service (Colville National Forest) on 4/29/2009. This modification replaces Section M (Evaluation Factors for Award) and clarifies the use of the color rating system for evaluating past performance and technical proposal factors. Proposals remain due on May 1, 2009.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment A - Solicitation AG-05G1-S-09-0010 (IDIQ Road Work): Amendment A to solicitation AG-05G1-S-09-0010 for IDIQ Road Work, issued by the USDA Forest Service Colville National Forest on March 26, 2009. This amendment incorporates a vicinity map and Bid Bond Form SF-24 into Section J and deletes 'The Example Project 1'. It notifies bidders that the sample project will be replaced by two actual task orders via future amendments.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Colville National Forest RFP AG-05G1-S-09-0010 Amendment 4: Amendment 4 to RFP AG-05G1-S-09-0010 for Road, Bridge and Structure Work at Colville National Forest. Key changes include new contract termination terms, the addition of Curlew Civilian Conservation Center to the scope of work, expanded road maintenance tasks, and the incorporation of Example Project C and Wage Determination 1977-0209. It also provides revised instructions for the preparation of technical and business proposals, including specific requirements for past performance and technical capabilities.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Colville National Forest RFP AG-05G1-S-09-0010 Amendment 8: Amendment 8 to RFP AG-05G1-S-09-0010 for Road, Bridge and Structure Work at Colville National Forest. This document replaces Section M (Evaluation Factors for Award), detailing the HUBZone set-aside status, the basis for award (best value trade-off), and the color-coded rating system (Blue, Green, Yellow, Red) for evaluating technical proposals and past performance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Culvert Details Model 7: Technical specifications and detail diagrams for culvert types, including catch basin details, inlet/outlet protection, leadout ditches, ripple block types, and sub-eave sliding armrings for RCP.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Culvert Listing and Installation Details: A technical specification document detailing culvert diameters, lengths, and installation requirements, including material gauges (aluminum/steel) and staking/stacking methods.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drainage Details Model 8: Technical drawing specifications for outside drain details and drain dips, including pipe sizing (30 inch), depth (6 inch), and compaction requirements. The document provides plan and profile views for drainage installation and references sections 0-10-7.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Earth Mound Typical Drawing: Technical drawing and specifications for road closure using earth mounted typicals, including dimensions for ditches and small earth mounds. Dated 6-15-05.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Estimate of Quantities - Road Projects: This document provides an Estimate of Quantities for various road projects (Project Road Numbers 21130104R through 21130116R). It includes a detailed list of item numbers, descriptions, and units of measure for work such as mobilization, clearing limits, excavation, and riprap placement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Example Barrier Rock Model: Technical drawing or specification document from Sherwin Co. detailing the approximate locations and dimensions of barrier rocks.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Example Camp Host Spur PP-Multi01 Model: Technical specification document detailing road dimensions and infrastructure markers for Road #405, including lane widths and specific section measurements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Example Culvert Detail Model: Technical detail document providing specific labeling and measurement standards for culvert models, specifically regarding diameter notations for pipes and components.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Example Vicinity Model - Commercial (Lakeshore): This document is a technical reference or site map for a project located at 740 N R36 E. It includes a legend for water sources, construction, rods, and utilities, along with a 1:2 scale and specific location annotations for Lake of the Woods, Section 15.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Gate Detail Type II Model 10: Technical specifications and detail notes for Gate Detail Type II, dated 10/15/2007. The document includes wall exposure notes, dimensional specifications for concrete foundation materials, tubing requirements for dust and dirt protection, and cross-sectional views of vertical connectors.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for General Decision Number WA 080001 - Washington Heavy and Highway Construction: Wage determination for Heavy, Highway, and Dredging construction projects in Washington State, dated 03/06/2009 (General Decision Number WA 080001). The document specifies hourly rates and fringe benefits for various carpenter and diver classifications across different regions, including the Columbia River Area, Spokane Area, and Southwest Washington. It includes detailed pay scales for diving depths, hazmat premiums, zone differentials, and dispatch points.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Map Vulcan Water Source: Technical drawing/map legend for the Vulcan Water Source project, detailing spatial dimensions, boundaries (forest, creek, border), and infrastructure markers such as gate installations and water surfaces.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Model 6 Road Structure Details: Technical specification document detailing road structure requirements, including roadway sections, gradients, and clearing limits. It includes mandatory and optional fields for road numbering and stationing, and mandates compliance with NFPA and NSPA codes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Pierre L. Dropcountain Road Construction Project - Plans and Specifications: Technical engineering drawings and specifications for the Pierre L. Dropcountain Road construction and reconstruction project, including project coordination details and design vehicle plans.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Pre-Proposal Meeting Notes - RFP AG-05G1-S-09-0010: Notes from the April 6, 2009, pre-proposal meeting for the Colville National Forest IDIQ Road, Bridges and Other Structures contract (RFP AG-05G1-S-09-0010). The document includes an attendance list, an overview of the IDIQ structure (minimum guarantee of $2,000, ceiling of $1,000,000), and a summary of amendments 1 through 5. It outlines the task order process, potential future projects, and specifies that Amendment 5 will update the proposal due date to April 27, 2009, and update the Davis-Bacon Wage Determination.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project C Spec 833 - Drainage Structure Installation or Removal: Technical specifications for drainage structure installation and removal (Spec 833) under RFP AG-05G1-S-09-0010 for IDIQ Road Work for the Colville National Forest. The document defines service requirements, performance standards, measurement methods, pay items, and acceptable quality levels for culverts, water-bars, cross ditches, and drivable drain dips.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project C Spec 836 - Road Decommissioning (RFP AG-05G1-S-09-0010): Technical specifications for road decommissioning and closure on the Colville National Forest under IDIQ RFP AG-05G1-S-09-0010. The document details the scope of work, including clearing, road closure berms, recontouring, ripping, outsloping, embankment pullback, seeding, and mulching. It includes specific technical requirements for ripping depth and seed rates, as well as measurement and payment guidelines for various pay items.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project C Spec 881 - Mobilization/Equipment Moving: Technical specification section 881 for RFP AG-05G1-S-09-0010 regarding IDIQ Road Work for the Colville NF. It defines the service requirements, performance standards, measurement, and payment terms for mobilization and equipment moving.
PDF
PDF, High priority: read this firstbid-schedule
HighAI Summary for Project C - Various Road Work for the Colville National Forest Schedule: A pricing schedule for road work projects within the Colville National Forest. The document requires unit prices for various items including spot surfacing, culvert removal, ripping, seeding, mulching, and mobilization, referencing both Service Contract Act and Davis Bacon wage determinations.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ AG-05G1-S-09-0010 Growden Energy Dissipater: Request for Quotation (RFQ) issued on April 9, 2009, for the Growden Energy Dissipater construction project at the Three Rivers Ranger District, Colville National Forest, Washington. The project involves developing the Lane Creek Riprap Pit and constructing an energy dissipater, including diversion culverts and riprap placement. This is a HUBZone small business set-aside with a government estimate between $25,000 and $100,000. The document includes a detailed bid schedule (CLINs) for mobilization, energy dissipater construction, diversion culverts, and riprap production.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Road 2114500R and 2114510R Work Summary Sheet: A work summary sheet detailing specific construction tasks for Road 2114500R (Segment 3) and Road 2114510R. It includes stationing and milepost data for clearing and grubbing, roadbed construction, ditching, and the installation of culverts (OSD/DD) and gates.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Road, Bridges and Structure Work RFP AG-05G1-S-09-0010: Request for Proposal (RFP) for an Indefinite Delivery Indefinite Quantity (IDIQ) contract for road, bridge, and structure work within the Colville National Forest. The government intends to make multiple awards (3-5) for construction and service projects, including road decommissioning, culverts, and maintenance. The contract is firm-fixed-price with a performance period through May 30, 2012, and a total aggregate value not to exceed $1,000,000.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Typical Roadway Section - Road Storage Deals: Technical specifications and notes for a typical roadway section regarding road storage, including clearance limits, installation procedures, and structural requirements. The document includes a list of abbreviations and specific notes for operators and planning departments.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010: Request for Quotation (RFQ) AG-05G1-S-09-0010 for the Vulcan Road Reconstruction Project B within the Republic Rivers Ranger District, Colville National Forest, Ferry County, Washington. The document contains a detailed Schedule of Items (Section B) providing estimated quantities, units of measure, and price fields for various road reconstruction tasks across multiple road segments (e.g., Road 2113010R, 2113200R), including mobilization, excavation, drainage, and seeding.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Amendment 6: Amendment 6 to RFQ AG-05G1-S-09-0010 for the Vulcan Road Reconstruction Project B in the Republic Rivers Ranger District, Colville National Forest. The document provides a detailed Schedule of Items (Section B) including quantities and descriptions for road work across multiple road segments (e.g., 2113010R, 2113200R), covering mobilization, excavation, seeding, and drainage installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Vulcan Road Reconstruction, Project B Supplemental Specifications: Forest Service Supplemental Specifications for the Vulcan Road Reconstruction, Project B (AG-05G1-S-09-0010) under the Colville National Forest IDIQ Road Work. The document details technical requirements for clearing and grubbing, excavation, embankment, culverts, drains, and turf establishment, along with quality control and measurement standards.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Vulcan Worklist - Road 2114400R and 2114500R Seg 1: A detailed work summary sheet outlining specific road construction tasks for Road 2114400R and Road 2114500R Segment 1. The document lists milepost (MP) locations for clearing and grubbing, roadbed construction, T-intersection work, borrow material placement, and the construction of drainage ditches (DD) and oversized ditches (OSD).
PDF
PDF, High priority: read this firstsow
HighAI Summary for Vulcan Work Summary Sheet: A technical work summary sheet detailing road construction activities across multiple segments (Roads 2113010R, 2113015R, 2113040R, 2113045R, and 2113200R). It specifies stationing and mileposts for tasks including clearing and grubbing, aggregate placement, roadbed shaping, and the construction of drainage ditches (DD) and oversized drains (OSD).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Vulcan Work Summary Sheet - Road 2113300R, 2113400R, 2113360R: A technical work summary sheet detailing specific construction tasks, mileposts (MP), and stationing (STA) for road segments 2113300R, 2113400R, and 2113360R. It includes detailed instructions for aggregate placement, ditch construction, roadbed shaping, and the installation of gates and CMPs.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Vulcan Work Summary Sheet - Roads 2113200R, 2113250R, 2113253R: A technical work summary sheet detailing road construction activities for Roads 2113200R, 2113250R, and 2113253R. It includes specific stationing (STA) and mileposts (MP) for work items such as roadbed construction, aggregate placement, ditching, culvert installation (CMP), and clearing and grubbing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Vulcan Work Summary Sheet - Road Segments 2113400R, 2114033R, 2114000R, 2114080R, 2114025R: A technical work summary sheet detailing specific road construction tasks across multiple road segments. It includes milepost (MP) and station (STA) markers for activities such as clearing and grubbing, blading and shaping roadbeds, installing gates, and constructing drainage ditches (DD) and oversized drainage (OSD).
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for WA 080001 - Heavy and Highway Construction Wage Decision: General Decision Number WA 080001, dated 03/20/2009, specifies prevailing wage rates and fringe benefits for Heavy, Highway, and Dredging construction projects statewide in Washington. The document details specific pay scales for various carpenter and diver classifications across different regional groups and zones, including depth pay for divers, hazmat premiums, and dispatch point instructions.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination 1977-0209, Revision 37 (Washington Statewide): U.S. Department of Labor Wage Determination 1977-0209, Revision 37, dated May 29, 2008, for the Forestry Industry in Washington Statewide. It specifies minimum wage rates for various forestry occupations (e.g., Faller/Bucker, Forestry Technician), required health and welfare benefits, vacation, and holiday pay. The document also outlines uniform allowance standards and the conformance process for requesting additional classifications via SF 1444.
PDF
PDF, Low priorityother
LowAI Summary for AT7&8: The document content is insufficient to determine the procurement purpose, containing only a generic instruction regarding factual data. No specific solicitation or contract details are present.
PDF
PDF, Low prioritypast-performance
LowAI Summary for Colville National Forest Past Performance Survey (RFP AG-05G1-S-09-0010): A past performance survey form associated with RFP AG-05G1-S-09-0010 for Road, Bridges and Structure Work at Colville National Forest. This document, part of Amendment 5, is designed for previous clients to evaluate a contractor's quality of work, customer satisfaction, cost control, business relations, and timeliness. It includes a rating scale from 'Unsatisfactory' to 'Outstanding' and requires submission by April 27, 2009.
PDF
PDF, Low priorityother
LowAI Summary for EstQty+4: A brief document stating that all information in a table is true and accurate as of 4/15/2023.
PDF
PDF, Low priorityother
LowAI Summary for Est+Qty+5.pdf: The document contains a brief statement asserting the accuracy of information in a table, but provides no substantive procurement data or context.
PDF
PDF, Low priorityother
LowAI Summary for Example CMP List Model: The document contains a brief reference statement indicating that the provided details serve as a reference for a diagram.
PDF
PDF, Low priorityother
LowAI Summary for Example EstQty: The document contains a brief instructional statement regarding factual data presentation in a table, but lacks substantive procurement content or specific solicitation details.
PDF
PDF, Low priorityspecifications
LowAI Summary for Vicinity Map: A technical drawing or map document containing labels, dimensions, and legends to be interpreted literally for project location or site identification.
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
10 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Mar 27, 2009 to Apr 20, 2009. The notice description changed.
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Response deadline changed from Apr 20, 2009 to Apr 27, 2009. The notice description changed.
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → Colville National Forest
Colville National Forest, Various Road Work. The Colville National Forest located in North Eastern Washington State has a requirement for various road work. The project will be located in Ferry, Stevens and Pend Oreille Counties, Washington State. The Contractors shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman's compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract. The project consists of but not limited to culvert installation, constructing drivable drain dips, road obliteration, aggregate surfacing, paving, installing fish structures, stream bank protection, ditch and drainage cleaning, dust abatement and road side logging out throughout the Colville National Forest. The Government intends to issue a three year Indefinite Delivery Indefinite Quantity contracts. Multiple awards are anticipated. The Government will issue task orders to perform the individual projects as they become funded. The project specifications and project location will be defined in the task order. All Contractors awarded this contract will have a fair opportunity to complete for the task order. The task order may be considered a service or a construction task order. All construction task orders over $30,000 will require a payment bond and all construction task orders over $100,000 will require both payment and performance bonds. The minimum guarantee for each award will be $2,000.00. The maximum aggregate total for all contracts awarded under this solicitation will not exceed $999,000.00. Contractor will be paid for actual work performed and ordered and also on quality. This project will be advertised as a written request for proposals. Estimated issue date of the solicitation is on or about February 25, 2009. Proposals are estimated to be due March 27, 2009. The actual due date will be listed in the solicitation. This acquisition is 100% set-aside for HubZone small business concerns. NAICS code is 237990, size standard is $31 million.