Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Forestry and Parks - Invitation to Bid - Kananaskis Region Vault Toilet Replacement

Closed
AB-2025-07259International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
Solicitation 872281, managed by the Bristol Alliance of Companies for U.S. Immigration and Customs Enforcement, covers a comprehensive series of infrastructure repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The project scope encompasses multiple critical systems, including the replacement of boilers across several buildings, the installation of a new fire alarm system in the dining facility, and extensive painting and surface repairs for 11 buildings. Additionally, the contract includes plumbing repairs for Multipurpose Building 3 and significant upgrades to the wastewater treatment plant infrastructure, specifically focusing on replacing worn valves, installing sewage grinders on the influent trough, and utilizing coastal weather resistant materials to ensure long term durability. The project is estimated to have a magnitude between 1.5 million and 2 million dollars and is issued as a task order to 8a MACC IDIQ offerors. Contractors are required to adhere to the TX20260236 wage determination for Cameron County and must comply with strict quality control, safety, and security requirements. The procurement process includes a mandatory site survey and a detailed pricing template broken down by CSI division. Key deadlines include a response deadline of September 10, 2026, with final proposals due by September 24, 2026.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is soliciting quotes from subcontractors and suppliers for various trade scopes, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel pipes. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT. The project is open to various set-aside categories, including Small Business, Women-Owned Small Business, and HUBZone certified entities.
Garney Pacific, Inc.

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids from MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the improvement of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the treatment of approximately 1.7 acres of impervious surface within a 3.3-acre drainage area. Additional requirements include necessary drainage, underdrain, inlet, pipe, and downspout work, as well as limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements specify the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This opportunity is open to various small business designations, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, who are encouraged to form consortiums if individual bid items are too large for a single entity to manage. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties must provide their company name and contact information along with a clear indication of their intent to bid. The primary point of contact for this solicitation is Jennifer Wilson, with administrative coordination handled by Jonah Leith.
Harbel, Inc.

POSTED

about 11 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as 54 and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation is open to small businesses, including certified SDVOSB, MBE, and WBE firms, with a bid submission deadline of September 29, 2026. James W. Fowler Co. is providing support to M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and encourages the use of apprentices for the project.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

This contract involves the removal and disposal of existing wood vault toilets and the supply and construction of new pre-cast concrete vault toilets and septic tanks at several provincial park locations in Alberta. Specifically, the project covers six sites: Bragg Creek Day Use Area, Sheep River Provincial Park (including Head Office Parking Area, Sandy McNabb Trailhead Parking Area, and Junction Creek Day Use Area), Cat Creek Provincial Recreation Area, and Fitzsimmons Creek Provincial Recreation Area. The work required includes demolition of the old vault toilets, removal of buried septic tanks, and installation of new four-stall concrete vault toilet buildings with associated septic tanks, roofs, building accessories, and landscaping finishings as identified in the contract. The contract details the removal of various numbers of existing wood vault toilets—ranging from one to three at each site—and their replacement with new four-stall precast concrete vault toilets, including a provisional item at Fitzsimmons Creek. Key tasks encompass site preparation, proper disposal of existing structures and tanks, erection and priming of new concrete buildings and tanks, and final landscaping. Locations are precisely identified by coordinates. The contract was issued by Forestry and Parks, Government of Canada, with a solicitation number AB-2025-07259 and a submission deadline in January 2026. The work is intended to improve the sanitation infrastructure across multiple recreational and day use areas within the Kananaskis region.

General Info

Removal of wood vault toilets and installation of new concrete vault toilets and septic tanks.

Agency

Government of Canada → Forestry and ParksView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Forestry and Parks
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Forestry and Parks
View Agency Profile
Office AddressN/A
Contacts
Kenan TuzlakContracting Authority

Full Description

Show more
.1 Work of this Contract comprises the following: Remove and dispose of existing vault toilets: - Bragg Creek Day Use Area: Remove one (1) existing wood vault toilets, (2 stall) and two (2) existing wood vault toilets, (4 stall). - Sheep River PP - Head Office Parking Area: Remove one (1) existing wood vault toilets, (2 stall). - Sandy McNabb Trailhead Parking Area: Remove one (1) existing wood vault toilets, (2 stall). - Junction Creek Day Use Area: Remove two (2) existing wood vault toilets, (2 stall). - Cat Creek Day Use Area: Remove three (3) existing wood vault toilet (2 stall). - Provisional item – Fitzsimmons Creek Day Use: Remove one (1) existing wood vault toilets, (2 stall). Supply and construction of new concrete vault toilets and tanks at the existing toilet locations: - Bragg Creek Day Use Area: (1) one 4 stall-concrete vault toilet. - Sheep River PP - Head Office Parking Area: (1) one 4 stall concrete vault toilet. - Sandy McNabb Trailhead Parking Area: (1) one 4 stall-concrete vault toilet. - Junction Creek Day Use Area: (2) two 4 stall-concrete vault toilet. - Cat Creek Day Use Area: (1) one 4 stall-concrete vault toilet. - Provisional item – Fitzsimmons Creek Day Use: (1) one 4 stall concrete vault toilet. .2 Location: - Bragg Creek Provincial Park: Bragg Creek Day Use Area; - Sheep River Provincial Park: Head Office Parking Area, Sandy McNabb Trailhead Parking Area and Junction Creek Day Use Area; - Cat Creek Provincial Recreation Area: Cat Creek Day Use Area; -Fitzsimmons Creek Provincial Recreation Area: Fitzsimmons Day Use Area; .3 The work includes: Demolition, removal and disposal of existing vault toilet buildings; Cleaning, removal and disposal of existing buried septic holding tanks; Supply and construction of new pre-cast concrete vault toilet buildings Including the supply and construction of four (4) prefabricated concrete 4 ‐ stall vault washroom buildings: I. Supply, installation and priming of concrete septic tanks; II. Supply and installation of precast concrete toilet building structures; III. Supply and installation of the precast concrete roof; IV. Supply and installation of all building accessories identified on the drawings; and V. Landscaping finishing work. .2 Legal Description: - Bragg Creek Parking Area: 50.94129, -114.59335 - Sheep River PP - Head Office Parking Area: 50.63894, -114.50360 - Sandy McNabb Trailhead: 50.64129, -114.52318 - Junction Creek Day Use Area: 50.604982, -114.73463 - Cat Creek Day Use Area: 50.79433, -114.85332 - Fitzsimmons Creek Day Use: 50.39173, -114.68517

More opportunities from Government of Canada → Forestry and Parks

Same awarding agency

NAICS: 115310
International
Forestry and Parks - Pre-qualification Request - Surge Sustained Action Firetack Crews
Solicitation # AB-2026-02198
The Government of Alberta through its Forestry and Parks division is seeking qualified vendors to pre-qualify as potential providers of Surge Sustained Action Crews to support fire suppression efforts and related field operations when existing Firetack Crew contracts cannot meet demand. This initiative is triggered only when additional resources are needed beyond what is available through standard contractual agreements, and no guarantee of work is provided upon pre-qualification. Successful proponent(s) will be activated through a formal Statement of Work process, under which crews will perform tasks such as fire suppression, brush clearing, firebreak preparation, and other manual labor as directed by provincial authorities. Operations will be conducted entirely within Alberta under the direction of provincial personnel, and all work must align with the specifications and requirements outlined in the issued Statement of Work. The solicitation, numbered AB-2026-02198, was posted on March 16, 2026, with responses due by December 31, 2027. The contracting authority is Wade Klein, who serves as the primary point of contact for inquiries, and all activity is managed under the oversight of the Government of Alberta. Although the solicitation is listed under a federal portal, it is specifically a provincial initiative focused solely on addressing wildfire response needs within Alberta. Pre-qualification does not obligate the province to issue work, and activation will occur strictly based on operational necessity, with priority given to vendors who meet all qualification criteria and are capable of responding promptly to urgent resource requests.
Support Activities for Forestry

POSTED

6 months ago

DEADLINE

in over 1 year
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS