Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 20, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fort Bragg DPW Vertical Construction

Closed
W91247-20-R-0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 5 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$2,273,756

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Bragg, NC, 28310, USA

Set-Aside

HZC

Award Issued Date

Documents

40

Attachment 2 - Pricing Schedule (Section B)

DOCX, High priority: read this first2 pages · specifications
High

Attachment 4 - MA IDIQ CAP Rates

XLSX, High priority: read this first2 pages · specifications
High

Building M-2505 Asbestos Survey Report - Fort Bragg

PDF, High priority: read this first15 pages · specifications
High

Building M-6205 Asbestos Survey Report - Fort Bragg, NC

PDF, High priority: read this first13 pages · specifications
High

FB-00007-21 & FB-00009-21 Notional Seed Project SOW

DOCX, High priority: read this first17 pages · sow
High

F.B.-00007-21 & F.B.-00009-21 Revitalize M-6205 & M-2505 Specifications

PDF, High priority: read this first186 pages · specifications
High

M2505 Utility Plan

PDF, High priority: read this first1 page · specifications
High

NC20210025 - Notional Seed Project Wage Determinations

PDF, High priority: read this first5 pages · wage-determination
High

W91247-20-R-0009 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

W91247-20-R-0009 Amendment 0003

PDF, High priority: read this first4 pages · amendment
High

W91247-20-R-0009 Amendment 0005

PDF, High priority: read this first2 pages · amendment
High

W91247-20-R-0009 Amendment 0006

PDF, High priority: read this first33 pages · amendment
High

W91247-20-R-0009 Amendment 0007

PDF, High priority: read this first21 pages · amendment
High

W91247-20-R-0009 Amendment 1

PDF, High priority: read this first30 pages · amendment
High

W91247-20-R-0009 Amendment P0004

PDF, High priority: read this first2 pages · amendment
High

W91247-20-R-0009 Fort Bragg DPW MATOC Vertical MAIDIQ RFI Answers

XLSX, High priority: read this first235 pages · q-and-a
High

W9124720R0009 Fort Bragg Vertical Construction Key Personnel

DOCX, High priority: read this first1 page · specifications
High

W91247-20-R-0009 - Fort Bragg Vertical MA IDIQ

PDF, High priority: read this first74 pages · rfp
High

W91247-20-R-0009 - Fort Bragg Vertical MA IDIQ

PDF, High priority: read this first74 pages · rfb
High

W91247-20-R-0009 - Fort Bragg Vertical MA IDIQ

PDF, High priority: read this first74 pages · rfp
High

W91247-20-R-0009 - Fort Bragg Vertical MA IDIQ

PDF, High priority: read this first74 pages · rfp
High

W91247-20-R-0009 MA IDIQ Vertical Infrastructure

PDF, High priority: read this first74 pages · rfp
High

W91247-20-R-0009 MA IDIQ Vertical Infrastructure

PDF, High priority: read this first74 pages · rfp
High

Attachment+11+-+M2505+-+M6205+Asbuilt.pdf

PDF

Attachment+12+-+M2505+-+M6205+Communications.pdf

PDF

Attachment+13+-+M2505+-+M6205+Pictures.pdf

PDF

Attachment+15+-+M-6205+fiber+tie+points.pdf

PDF

Attachment+1C+-+Notional+Project+DWGs+-+FB-00007-21-FB-00009-21.pdf

PDF8 pages

Attachment+3+-+Notional+Seed+Project+Site+Visit+Location.pdf

PDF1 page

Attachment+6+-+M6205__Utility+Plan.pdf

PDF1 page

July+1+Site+Visit+Sign+in+Sheet+1.jpg

JPG

July+1+Site+Visit+Sign+in+Sheet+2.jpg

JPG

July+1+Site+Visit+Sign+in+Sheet+3.jpg

JPG

July+1+Site+Visit+Sign+in+Sheet+4.jpg

JPG

July+1+Site+Visit+Sign+in+Sheet+5.jpg

JPG

July+1+Site+Visit+Sign+in+Sheets.jpg

JPG

Site+Visit+Sign+in+Sheet+Picture+1.jpg

JPG

Site+Visit+Sign+in+Sheet+Picture+2.jpg

JPG

W91247-20-R-0009+Amendment+P0008.pdf

PDF2 pages

W91247-20-R-0009+Solicitation+FINAL.pdf

PDF74 pages

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

12 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

Response deadline changed from May 13, 2021 to Jun 21, 2021. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 14, 2021 to Jul 26, 2021. The notice description changed.

Notice updated

Response deadline changed from Jul 26, 2021 to Aug 9, 2021. The notice description changed.

Notice updated

Response deadline changed from Aug 9, 2021 to Aug 13, 2021. The notice description changed.

Notice updated

Response deadline changed from Aug 13, 2021 to Aug 30, 2021. The notice description changed.

Notice updated

Response deadline changed from Aug 30, 2021 to Sep 24, 2021. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 24, 2021 to Oct 1, 2021. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc Fdo Ft Bragg
Contacts2 people available
OfficeFORT BRAGG, NC, 28310-0000, USA
Office AddressFORT BRAGG, NC, 28310-0000, USA

Full Description

Show more
DPW - FB's mission is to sustain, restore, and modernize Fort Bragg real property facilities for the installation. The Vertical Construction Services MA IDIQ contracts will allow DPW - FB to execute a broad range of maintenance, repair and minor construction projects on real property at Fort Bragg, North Carolina. During the contract period, the Government will identify construction tasks required to complete each specific project. These tasks will include new minor construction, Maintenance and Repair (M&R) related to variety of trades such: carpentry, roofing, painting, electrical, Heating Ventilation and Air Conditioning (HVAC), plumbing, masonry, demolition, roadwork, storm drainage, earthwork, welding, construction of new structures or facilities, energy conservation, environmental, logistical, operational type work and other general construction work. See FINAL Solicitation in the attachment link section. AMENDMENT 1: The purpose of Solicitation Amendment 1 is to 1) Extend the due date for Technical Questions from three calendar days to six calendar days after site visit date 1 July 2021, 2) Extend the closing date of Solicitation from 14 July 2021 to 26 July 2021 and 3) Revised the Ordering Period to 8 October 2021 through 7 October 2026. Please see Highlighted changes in Red on Solicitation Amendment 1. Sign in Sheets from Final Site Visit dated 1 July 2021 are also uploaded with this amendment. AMENDMENT 2: The purpose of Final Solicitation Amendment 2 is to 1) Extend proposal submission deadline date from 26 July 2021 to 9 August 2021 to allow the Government to incorporate revisions to the Solicitation documents and provide answers to all questions from the Request for Information (RFI) in the upcoming Solicitation Amendment. The Government's answers to the RFIs will be posted in the upcoming Solicitation Amendment. AMENDMENT 3: The purpose of Final Solicitation Amendment 3 is to 1) Extend proposal submission deadline date from 9 August 2021 to 13 August 2021 to allow the Government to incorporate revisions to the Solicitation documents and provide answers to all questions from the Request for Information (RFI) in the upcoming Solicitation Amendment. The Government's answers to the RFIs will be posted in the upcoming Solicitation Amendment. AMENDMENT 4: The purpose of Final Solicitation Amendment 4 is to 1) Extend proposal submission deadline date from 13 August 2021 to 30 August 2021 to allow the Government to incorporate revisions to the Solicitation documents and provide answers to all questions from the Request for Information (RFI) in the upcoming Solicitation Amendment. The Government's answers to the RFIs will be posted in the upcoming Solicitation Amendment. AMENDMENT 5: The purpose of Final Solicitation Amendment 5 is to 1) Extend proposal submission deadline date from 30 August 2021 to 24 September 2021 to allow the Government to incorporate revisions to the Solicitation documents and provide answers to all questions from the Request for Information (RFI) in the upcoming Solicitation Amendment. The Government's answers to the RFIs will be posted in the upcoming Solicitation Amendment. AMENDMENT 6: The purpose of Final Solicitation Amendment 6 is to 1) Incorporate revisions and additions to the Solicitation and Statement of Work (Section C) based on the questions and responses from the Government. 2) Attachment 1B - Notional Seed Project - Wage Determinations has been revised. 3) Attachment 2 - Pricing Schedule has been revised. 4) Attachment 4 - MA IDIQ CAP Rates has been revised. 5) Attachment 7 - Government Answers - VERTICAL MA IDIQ RFI Excel Spreadsheet has been added. 6) Attachment 8 - M-2505 Asbestos Report has been added. 7) Attachment 9 - M-6205 Asbestos Report has been added. 8) Attachment 10 - 7859, FB-00007-21 & FB-00009-21, RevitalizeM-6205&M- 2505_IDGSpecs_20210722aa has been added. 9) Attachment 11 - M2505 & M6205 Asbuilt has been added. 10) Attachment 12 - M2505 & M6205 Communications has been added. 11) Attachment 13 - M2505 & M6205 Pictures has been added. and 12) Excel Spreadsheet has been uploaded to post answers to the RFI from Industry. All changes to the Solicitation are highlighted in RED. AMENDMENT 7: The purpose of Solicitation Amendment 7 is to 1) Incorporate Attachment 14 - MICC_MATOC_Vertical_W9124720R0043_KeyPersonnel_20210913aa. 2) Attachment 4 - MA IDIQ CAP Rates has been revised. 3)Incorporate revisions and additions to the Key Personnel in the Statement of Work (Section C). 4) Remove Building Scientist from theKey Personnel, that role w ill be performed by the architect or mechanical engineer. and 5) Minor change to the structural engineer minimum qualification has been incorporated, see Attachment 14. Proposal submission remains unchanged. All changes to the Solicitation are highlighted in RED. AMENDMENT 8: The purpose of Solicitation Amendment 8 is to 1) Incorporate Attachment 15 - 6205 fiber tie points and 2) Extend the proposal submission due date from 24 September 2021 to 1 October 2021.

More opportunities from Department Of Defense → W6QM Micc Fdo Ft Bragg

Same awarding agency

NAICS: 481211
New
Federal
Airborne Special Operations Testing Directorate Wet Blade Hours IDIQ
Solicitation # W91247-27-Q-A004
The Mission and Installation Contracting Command at Fort Bragg is soliciting a non-personal services IDIQ contract for the Airborne and Special Operations Test Directorate to provide flight services for military Static Line and Military Free Fall parachute operations. This total small business set-aside, specifically designated for Economically Disadvantaged Women-Owned Small Businesses, requires the contractor to provide all necessary personnel, aircraft, equipment, and maintenance supervision. The contract spans a five-year ordering period from December 1, 2026, to November 30, 2031, with an estimated total of 150 flight hours, averaging 30 hours per year. The contract value is estimated between 500 and 500,000 USD. To be eligible, offerors must be DoD-approved commercial operators listed on the Air Mobility Command Commercial Airlift Review Board Paratroop Commercial Operator Listing or provide a passing inspection report per DoD Instruction 4500.53, alongside an active FAA Part 135 Air Carrier Certificate or approved FAA Part 91 status. A critical requirement is the submission of a maintenance support plan ensuring aircraft can be repaired or replaced within 24 hours of a mechanical failure. Award will be determined using the Lowest Price Technically Acceptable method, evaluating mission capability based on aircraft performance, staffing, and aviation compliance. Invoicing will be managed electronically through the Wide Area WorkFlow system.
Nonscheduled Chartered Passenger Air Transportation

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 562991
Federal
Camp Lejeune Shower Services
Solicitation # W9124727QA002U00001
This non-personal services, fixed-price contract is a total small business set-aside, including HUBZone and SDVOSB categories, to provide temporary shower trailer services for the 1st Battalion, 505th Parachute Infantry Regiment, 82nd Airborne Division. The services will support an off-post training exercise at Camp Lejeune, North Carolina, with a period of performance from November 16 to November 19, 2026. The contractor is responsible for the delivery, setup, and full operational readiness of the facilities no later than 1700 hours on November 15, 2026. The required configuration must be gender-segregated with at least sixteen shower heads and a self-sustaining potable water supply of at least 8,250 gallons per day, including the legal collection and disposal of greywater. The contractor must provide power generation, fuel supply with secondary containment, and perform cleaning and sanitization twice daily. Additionally, the contractor must provide 24-hour emergency maintenance with a maximum two-hour on-site response time. Award will be based on the most advantageous offer considering price, technical capability, and past performance within the last three years. Offerors must submit a Quality Control Plan with their quote by October 22, 2026. The contract incorporates various federal regulations, including specific requirements for insurance on government installations, cybersecurity safeguarding of defense information, and strict adherence to the Service Contract Labor Standards.
Septic Tank and Related Services

POSTED

7 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS