Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Fort Ross State Historic Park Kashia Loop Trail

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation is undertaking the construction of the Kashia Loop Trail at Fort Ross State Historic Park in Sonoma County, California, with authorization under the Fish and Game Code Section 1602 through Lake and Streambed Alteration Agreement EPIMS-SON-56439-R3. The project includes the installation of a 28-foot-long by 5-foot-wide wooden pedestrian bridge over an intermittent drainage and a separate 16-foot-long wooden bridge with two 14-foot puncheons crossing a wetland drainage complex, all with footings placed outside of the water bodies and above the top of bank to minimize environmental disruption. Construction access and staging are restricted to existing disturbed trails and roads, and no trees will be removed. The project will result in permanent impacts of 162 square feet to riparian habitat and 286 square feet to wetland habitat, with no temporary impacts anticipated. Compliance with the California Environmental Quality Act (CEQA) has been established through a Negative Declaration, and mitigation measures approved by the California Department of Fish and Wildlife are binding conditions for project execution. All work adheres to regulatory requirements under Title 14 of the California Code of Regulations and the approved Mitigation Monitoring Plan. The contract is a state-level environmental and infrastructure project; no federal acquisition regulations, procurement clauses, pricing data, payment details, invoicing systems, or offeror certifications are applicable or present. The project is managed by the California Department of Parks and Recreation with oversight from the California Department of Fish and Wildlife, with Brad Michalk serving as the primary agency contact and James Hansen acting as the environmental scientist. No formal contract value, delivery schedule, FOB terms, or solicitation number has been disclosed, and the document structure reflects regulatory permitting rather than traditional federal procurement documentation.

General Info

California constructs two wooden bridges at Fort Ross with minimal habitat impact, per state environmental regulations.

Agency

California Parks and Recreation, Department of

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-SON-56439-R3 Notice of Determination for Fort Ross State Historic Park Trail Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Brad MichalkLead Agency Contact
James HansenEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SON-56439-R3), pursuant to Fish and Game Code section 1602, to the project Applicant, California Department of Parks and Recreation. The project is limited to the construction of a new bridge and boardwalk as part of the construction of a public trail. A new 28-foot-long by 5-foot-wide wooden pedestrian bridge will be constructed over an intermittent drainage. The bridge will span the channel, with footings located outside of the channel and above the top of bank. The footings will be wood timber sills measuring 16 inches wide and 8 feet long, placed in a 10-inch-deep trench. The boardwalk construction will include a wooden bridge measuring 16 feet long by 5 feet wide and two 14-foot-long puncheons, all crossing a single wetland drainage complex, with footings located outside of the wetland drainage. The project will result in approximately 162 square feet of permanent impacts to riparian habitat and 286 square feet of permanent impacts to wetland habitat. No trees will be removed as part of this project. There will be no temporary impacts to riparian or wetland habitat as part of this project. All access and staging will occur along existing disturbed trails and roads.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details