Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on July 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FORT VALLEY WASTEWATER TREATMENT PLANT EFFLUENT PIPE CONSTRUCTION

Closed
PE-33552-NONST-2026-000000020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Fort Valley Utility Commission is soliciting proposals for the design and construction of approximately 4,000 linear feet of 20-inch fusible PVC effluent pipe associated with a new wastewater treatment plant. The installation will involve both open cut and jack & bore methods, with the pipe to be placed roughly 6 feet below grade. A critical part of the project includes boring 185 feet of pipe beneath a Norfolk Southern railroad track, where the pipe will be encased in a 30-inch steel casing positioned about 6 feet below normal grade and 24 feet below the rail base. To facilitate this, excavation of a 40-foot launching pit and a 15-foot receiving pit will be required. The project scope also incorporates erosion control measures and all other necessary components to provide a complete effluent pipe installation. Interested companies must request the proposal package via email addressed to Tara Giles at [email hidden] and will be added to the official List of Proposers, as submissions from entities not on this list will not be accepted. The full proposal package includes the Request for Proposals, Proposal Requirements, and Proposal Information Sheet, and all proposals must adhere strictly to the provided guidelines. Proposals must be submitted by July 3 at 2:00 PM EST either by mail or hand-delivered to the Fort Valley Utility Commission office at 500 Anthoine Street, Fort Valley, GA. The sealed envelope should be clearly marked for the Fort Valley Wastewater Treatment Plant Effluent Pipe Construction project. Selection will be based on a combination of quantitative factors as outlined in the solicitation.

General Info

Design and construct 4,000 feet 20-inch effluent pipe under railroad, submit proposals by July 3.

Documents

4

Addendum 1 - Effluent Pipe Design-Build Proposal Due Date Change

PDF, High priority: read this firstamendment
High

Addendum No. 1 to RFP for Fort Valley Wastewater Treatment Plant Effluent Pipe Construction

PDF, High priority: read this firstamendment
High

RFP for Fort Valley Wastewater Treatment Plant Effluent Pipe Construction

PDF, High priority: read this firstrfp
High

VOL 3 Price Proposal Forms - Effluent Pipe Design-Build Project

PDF, High priority: read this firstprice-proposal
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jul 3, 2026 to Jul 24, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Fort Valley Utility Commission
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Fort Valley Utility Commission is seeking a highly qualified company to design and build approximately 4,000 LF of 20¿ fusible PVC effluent pipe discharging from a new wastewater treatment plant using open cut and jack & bore methods and manholes. The effluent pipe will be installed approximately 6' below grade. Approximately 185 LF of the new pipe will be jack & bored under a railroad owned by Norfolk Southern. The bored pipe will be encased within a 30" steel casing pipe and will be bored approximately 6' below normal grade and 24' below the base of the rail. A 40' launching pit and a 15' receiving pit will be dug to perform the jack & bore. The project will also include erosion control and all other ancillary items for a complete effluent pipe installation.Proposal packages may be requested via email and should be directed to Tara Giles at contact@example.gov. Upon request of a proposal package, the submitting firm will be added to the ¿List of Proposers¿. Proposals will not be accepted from entities not listed on the ¿List of Proposers¿ prior to the due date. The complete proposal package includes the Request for Proposals, Proposal Requirements and Proposal Information Sheet. Submitted proposals shall follow the guidelines outlined in the proposal package. Proposals will be received at Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030 until July 3 @ 2:00 PM EST. No proposals will be accepted after this timeProposals should be mailed to: Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030 OR Hand Delivered (Prior to due date/time) to: Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030. Proposal Envelope should be sealed and marked: RFP for Fort Valley Wastewater Treatment Plant Effluent Pipe ConstructionFactors to be considered in making this award, if awarded, include consideration of both quantitative

More opportunities from Georgia → Fort Valley Utility Commission

Same awarding agency

NAICS: 237130
SLED
BLUE BIRD EXPANSION
Solicitation # PE-33552-NONST-2027-000000021
The Fort Valley Utility Commission is soliciting sealed bids from experienced and licensed contractors for a labor-only contract to construct the electric primary feeder system for the Blue Bird Expansion Project in Fort Valley, Georgia. The scope of work involves the installation of a 7.2 kV phase-to-ground and 12.47 kV phase-to-phase three-phase underground electric distribution system. Key components include the installation of underground primary cable and conduit systems, pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, pads, grounding, and the subsequent testing and commissioning of the system. The project supports a significant site expansion featuring a 918,390 square foot building and a 39,474 square foot building. Under this labor-only agreement, the Fort Valley Utility Commission will provide all major electrical materials, while the contractor is responsible for providing all supervision, qualified personnel, construction equipment, tools, transportation, and safety equipment necessary for completion. All work must adhere to ECG Construction Assembly Specifications, FVUC standards, NESC, OSHA, Georgia 811, and all applicable federal, state, and local regulations. A mandatory pre-bid meeting is scheduled for November 2, 2026, at 10:00 AM at 500 Anthoine Street, Fort Valley, Georgia, with a final response deadline for bids on November 10, 2026. The final completion date will be determined by Parrish Construction and Blue Bird.
Power and Communication Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS