This Solicitation opportunity from Texas was posted on April 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Texas Workforce Commission (TWC) is seeking proposals for renovations of the first-floor restrooms and breakroom at the Fort Worth North Texas Tele-Center building, located at 301 W. 13th Street, Fort Worth, Texas. This project, titled "Fort Worth 1st Floor Restroom Renovation," aims to improve the facilities within the specified building. The solicitation was posted on January 9, 2026, with a response deadline set for February 24, 2026, at 4:00 PM.
The contract opportunity is overseen by the Texas Workforce Commission, classified under the government agency type SLED (State, Local, Education, and other government). While there is no specific set-aside designation or NAICS code provided for this solicitation, interested parties can contact Rachel Dean, the primary point of contact, via email or phone for further information. Proposals must be submitted through the designated portal on txsmartbuy.gov by the stated deadline to be considered.
General Info
Texas Workforce Commission seeks proposals for Fort Worth restroom and breakroom renovations, deadline February 24, 2026.
DOC, High priority: read this first1 page · amendment
HighAI Summary for Addendum 1 Notice for RFP 3202600095 Ft. Worth 1st Floor Rest Room Renovation: This document is Addendum #1 for the Request for Proposals (RFP) No. 3202600095 issued by the Texas Workforce Commission for the Ft. Worth 1st Floor Rest Room Renovation project. Dated January 13, 2026, the addendum updates the Pre-Proposal conference time to January 14, 2026, at 1:30 pm Central Time. Attendance at the conference is optional. The addendum serves to notify all interested parties of this schedule change.
DOC
DOC, High priority: read this first1 page · amendment
HighAI Summary for Addendum 2 for RFP 3202600095 Ft. Worth 1st Floor Restroom Renovations: This document is Addendum #2 issued on 1/15/25 for the Request for Proposals (RFP) No. 3202600095 concerning the Ft. Worth 1st Floor Restroom Renovations project by the Texas Workforce Commission. It includes updates such as the posting of Pre-Proposal HUB slides and Sign-in sheet, and an updated Form 7 - HUB Subcontracting Plan Form with a revised subcontracting goal.
PDF
PDF, High priority: read this first61 pages · terms-and-conditions
HighAI Summary for Attachment 1 - TWC Terms & Conditions Architect & Engineer Version 12-18-2025: This document is Attachment 1 containing the Texas Workforce Commission (TWC) Terms & Conditions for Architect & Engineer services, version dated December 18, 2025. It outlines the contractual terms that vendors agree to by responding to the solicitation or fulfilling the purchase order. Key content includes solicitation response requirements such as firm pricing, bid alteration, rejection criteria, and tax exemptions. It also covers general conditions including liability claims, damage responsibility, disclosure of information, and compliance with the Texas Public Information Act. The terms apply to all TWC purchases and supersede conflicting solicitation specifications.
DOC
DOC, High priority: read this first2 pages · evaluation-scoring-matrix
HighAI Summary for Attachment 3-Evaluation Scoring Matrix: This document is Attachment 3, titled Evaluation Scoring Matrix, used for assessing proposals. It outlines criteria and corresponding points for evaluation including Cost (40 points), Pre-Proposal Conference Attendance (15 points), Past Project Performance (up to 30 points), Project Milestone Schedule (10 points), Safety Plan (5 points), and several pass/fail factors such as Financial Questionnaire, HUB Subcontracting Plan, Execution of Response, Written Narrative of Qualifications, and Letter of Bonding Capacity. The total possible score is 100 points. This matrix is critical for proposal evaluation and selection.
DOC
DOC, High priority: read this first1 page · supplementary-general-conditions
HighAI Summary for Attachment 5 - Supplementary General Conditions: This document, titled Attachment 5 - Supplementary General Conditions, outlines additional contractual requirements. It specifies that the contractor must maintain umbrella liability insurance equal to 100% of the contract sum, providing coverage that follows the form of primary liability insurance and includes drop down coverage. It also establishes liquidated damages at $1000.00 per day. These conditions supplement the main contract terms to ensure adequate insurance coverage and define penalties for contract breaches.
PDF
PDF, High priority: read this first8 pages · preproposal-conference-presentation
HighAI Summary for Attachment B - Preproposal Conference Presentation on HUB Subcontracting Plan: This document is a pre-bid conference presentation focused on the HUB Subcontracting Plan (HSP) for a Texas Workforce Commission solicitation. It outlines key deadlines, the subcontracting goal of 8.23%, and the requirement that all proposers submit an HSP as a pass/fail element. The presentation details two methods (A and B) for completing the HSP, including the use of Texas VetHUB certified vendors and notification requirements. It also covers self-performing justifications, monthly compliance reporting (Progress Assessment Report), and the necessity of agency approval for any HSP modifications after award. The document is intended to guide proposers in meeting HUB subcontracting requirements and ensuring compliance with state contracting rules.
DOC
DOC, High priority: read this first2 pages · financial-questionnaire
HighAI Summary for Financial Questionnaire for Ft. Worth 1st Floor Restroom Renovation: This document is a Financial Questionnaire related to the Ft. Worth 1st Floor Restroom Renovation project (ID: 3202600095). It requires the respondent to provide detailed financial information including bankruptcy history, loan defaults, company sale or acquisition status, project completion history, and contract termination records within the past five years. The questionnaire is designed to assess the financial stability and reliability of the respondent company for the project.
DOC
DOC, High priority: read this first2 pages · form-execution-of-response
HighAI Summary for Form 1 - Execution of Response for RFP: This document is Form 1 - Execution of Response for a Request for Proposal (RFP) issued by the Texas Workforce Commission (TWC). It requires the respondent to acknowledge receipt of all RFP terms and conditions, agree to provide the described items/services, and abide by all TWC terms. The form includes sections for noting any exceptions to the terms, respondent's signature, and detailed respondent information including identification numbers. It also provides checkboxes for claiming various Texas procurement preferences. The form is essential for formalizing the respondent's commitment to the RFP and contract terms.
PDF
PDF, High priority: read this first2 pages · past-performance
HighAI Summary for Form 3 - Past Project Performance Reference Sheet: This document is Form 3, a Past Project Performance Reference Sheet from the Texas Workforce Commission, Construction & Facilities Management, revision April 2021. It is used to record detailed information about past construction projects including project description, address, customer and contact details, architect or engineer contacts, contract amounts, start and completion dates, and explanations for any differences in amounts or dates. It also includes sections for warranty callbacks and miscellaneous comments, serving as a reference for evaluating past project performance.
DOC
DOC, High priority: read this first1 page · cost-proposal
HighAI Summary for Ft Worth 1st Floor Restroom Renovations Cost Proposal Form: This document is the Cost Proposal Form (Form 2) for the Ft Worth 1st Floor Restroom Renovations project #3202600095. It is intended for vendors to propose their best cost for various deliverables including bonding & insurance, mobilization, materials, labor, other itemized costs, and an owner's allowance of $77,000.00. The form is used to submit pricing information as part of the procurement process.
XLS
XLS, High priority: read this first2 pages · progress-assessment-report
HighAI Summary for HUB Subcontracting Plan Progress Assessment Report: This document is a HUB Subcontracting Plan (HSP) Progress Assessment Report, revision dated 10/16. It is used by prime contractors to document monthly compliance with their HSP by reporting subcontractor information, including Texas certified HUB status, contract amounts, and payments made during the reporting period. The report includes fields for contract and requisition numbers, contracting agency, contractor details, and payment totals. It is intended for submission to the contracting agency each month to ensure adherence to HUB subcontracting requirements.
PDF
PDF, High priority: read this first90 pages · asbestos-survey
HighAI Summary for Limited Asbestos Survey for Texas Workforce Commission 1st Floor Restroom Renovations: This document is a Limited Asbestos Survey conducted for the Texas Workforce Commission's 1st Floor Restroom Renovations at the Fort Worth Tele-Center. Prepared by Halff Associates Inc. in November 2025, the survey involved sampling and analyzing suspect building materials for asbestos content. Fifty-one bulk samples were collected and analyzed by a qualified laboratory. The survey found chrysotile asbestos in mortar beneath ceramic tile floors at levels below 1%, which is not considered asbestos-containing building material under Texas regulations. Recommendations include monitoring identified materials and following proper abatement procedures if asbestos-containing materials are encountered during renovation. The report includes detailed tables, sample locations, laboratory results, and certifications.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for Overview of PAR - HUB Subcontracting Plan Progress Assessment Report: This document provides an overview of the Progress Assessment Report (PAR) form required under the Texas Administrative Code for the HUB Subcontracting Plan (HSP). It outlines the monthly submission requirements, including reporting subcontractor payments, HUB status verification, and necessary form completion steps. The report must be submitted by the 5th of each month to the Texas Workforce Commission HUB Office, including all invoices and supplemental information. The document details how to fill out the PAR form, list subcontractors, and submit the report to ensure compliance with the HSP throughout the contract's life.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Prevailing Wage Scale for Tarrant County, TX - General Decision TX20250270: This document is the prevailing wage scale for building construction projects in Tarrant County, Texas, under General Decision Number TX20250270 dated 07/18/2025. It supersedes the previous decision TX20240270 and applies to contracts subject to the Davis-Bacon Act. The wage rates reflect compliance with Executive Orders 14026 and 13658, specifying minimum hourly wages for covered workers in 2025. The document includes detailed wage rates and fringe benefits for various construction trades such as asbestos workers, boilermakers, millwrights, elevator mechanics, ironworkers, painters, pipefitters, and others. It also notes the applicability of paid sick leave under EO 13706 for federal contractors. The wage determination is critical for ensuring contractors meet federal labor standards on covered projects.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 3202600095 Addendum #3 - Fort Worth 1st Floor Restroom Renovation: Addendum #3 issued on 2/6/26 for RFP No. 3202600095 regarding the Fort Worth 1st Floor Restroom Renovation for the Texas Workforce Commission. This notice informs vendors that Attachment D-Questions and Answers have been posted and requires a signed acknowledgement for submission.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 3202600095 Addendum #4 - Fort Worth 1st Floor Restroom Renovation: Addendum #4 issued on 2/9/26 for RFP No. 3202600095 regarding the Fort Worth 1st Floor Restroom Renovation for the Texas Workforce Commission. This document corrects Question 6 in the Q&A, clarifying that there is no room for roll-off dumpsters or Conex containers and requiring contractors to use pull-behind trailers for daily trash removal.
PDF
PDF, High priority: read this first45 pages · rfp
HighAI Summary for RFP-3202600095 Fort Worth 1st Floor Restroom Renovations: This document is a Request for Proposals (RFP) for the Fort Worth 1st Floor Restroom Renovations, Solicitation No. 3202600095, released on January 9, 2026. It outlines the purpose, authority, schedule of events, scope of work including detailed construction and renovation services, general contract terms and conditions, proposal process instructions, evaluation criteria, and required proposal information. The RFP includes specifications for tile, doors, casework, building construction, acoustical ceilings, electrical, HVAC, painting, and related services. It also provides contact information for the sole point of contact and details on submission deadlines and evaluation procedures.
PDF
PDF, High priority: read this first1 page · rfp
HighAI Summary for RFP 3202600095 Ft. Worth 1st Floor Restroom Renovation Title Page: This document is the title page (Form 5) of a proposal submitted in response to the Texas Workforce Commission's Request for Proposal No. 3202600095. The solicitation concerns the renovation of the Ft. Worth 1st Floor Restroom. The document identifies the proposal submission and the solicitation number, serving as the cover page for the proposal package.
PDF
PDF, High priority: read this first247 pages · project-manual
HighAI Summary for RFP 3202600095 Texas Workforce Commission Fort Worth 1st Floor Restrooms Project Manual: This Project Manual dated January 5, 2026, supports RFP 3202600095 for the Texas Workforce Commission Fort Worth 1st Floor Restrooms renovation project. It includes procurement and contracting requirements, detailed specifications across multiple divisions such as general requirements, existing conditions, wood/plastics, openings, finishes, specialties, furnishings, plumbing, HVAC, electrical, and communications. The manual outlines the project scope, contract type, compliance with accessibility standards, owner occupancy, contractor use of site, work sequence, and payment procedures. The document is intended to guide contractors in preparing bids and executing the renovation work in compliance with state and federal standards.
DOC
DOC, High priority: read this first1 page · instructions-to-respondents
HighAI Summary for Solicitation 3202600095 Ft. Worth 1st Floor Restroom Renovation - TWC Procurement Portal Instructions: This document provides instructions for respondents to the solicitation number 3202600095, titled 'Ft. Worth 1st Floor Restroom Renovation.' It details how to register and submit responses through the TWC Procurement Portal, including links to step-by-step guides, a registration and submission video, and general support resources. The document also provides contact information for the purchaser, Rachel Dean, including her email address. The purpose is to guide potential contractors in properly responding to the solicitation via the TWC Procurement Portal.
PDF
PDF, High priority: read this first9 pages · hub-subcontracting-plan
HighAI Summary for Texas HUB Subcontracting Plan Form 7: This document is the Texas Historically Underutilized Business (HUB) Subcontracting Plan (HSP) form, required under Texas Gov't Code §2161.252 for contracts with probable subcontracting opportunities. It includes instructions and checklists for prime contractors to demonstrate good faith efforts to subcontract with Texas certified HUB vendors, including methods to meet or exceed statewide HUB goals. The form outlines sections for respondent information, subcontracting intentions, affirmations, and justifications, emphasizing compliance with Texas Administrative Code and the 2009 Texas Disparity Study goals. Submission of a completed HSP is mandatory for bid responses to avoid rejection.
PDF
PDF, High priority: read this first11 pages · hsp
HighAI Summary for Texas HUB Subcontracting Plan (HSP) Form - Rev. 12/25: This document is the Texas Historically Underutilized Business (HUB) Subcontracting Plan (HSP) form, revision dated 12/25. It is required by Texas Gov't Code §2161.252 for contracts where subcontracting opportunities are probable. The form guides respondents on how to complete the subcontracting plan, including sections for respondent information, subcontracting intentions, and affirmations. It details instructions for subcontracting exclusively to Texas certified HUB vendors, a mix of HUB and non-HUB vendors, or self-performing without subcontracting. The form includes checklists and sections to specify subcontracting percentages, good faith effort methods, and justifications. This plan promotes equal business opportunities for economically disadvantaged businesses contracting with the State of Texas and is mandatory for bid responsiveness when subcontracting is anticipated.
PDF
PDF, High priority: read this first20 pages · construction-drawings
HighAI Summary for Texas Workforce Commission Fort Worth First Floor Restrooms Renovations Project Drawings: This document contains construction drawings for the Texas Workforce Commission Fort Worth First Floor Restrooms Renovations project located at 301 W. 13th St., Fort Worth, Texas. The drawings are dated January 5, 2026, and pertain to project number 23-1034.00. The document includes architectural, mechanical, plumbing, and electrical demolition plans, floor plans, and detailed notes by symbol. It is prepared by Elements of Architecture, Inc. and Baird, Hampton & Brown, Inc. The drawings are confidential and proprietary, intended for use under contract, and include instructions for demolition, installation, and electrical power plans relevant to the renovation work.
PDF
PDF, High priority: read this first10 pages · hsp
HighAI Summary for Texas Workforce Commission HUB Subcontracting Plan Guide: This document is a guide for completing the Historically Underutilized Business (HUB) Subcontracting Plan (HSP) required for responses to a Texas Workforce Commission RFP. It outlines the mandatory submission of an HSP as a pass/fail element, with no evaluation points awarded. The guide details notification requirements to certified HUB vendors and trade organizations, instructions for identifying subcontractors, and justifications for non-HUB vendors. It includes a quick checklist for different subcontracting scenarios and references Texas Gov't Code §2161.252 and 34 TAC §20.13 for HUB goals and compliance. The document emphasizes the importance of good faith efforts to meet HUB goals and provides contact information for HUB assistance. The version is indicated by the IFB number 3202xxxxx.
PDF
PDF, High priority: read this first83 pages · uniform-general-conditions
HighAI Summary for Texas Workforce Commission Uniform General Conditions v12-3-2024: This document is the Texas Workforce Commission Uniform General Conditions, version dated 12/3/2024. It provides comprehensive terms and conditions governing construction contracts with TWC, including definitions, laws governing construction, contract documents and bonds, contract administration, responsibilities of TWC and contractors, contract changes, payments, construction schedules, project completion, warranties, dispute resolution, and miscellaneous provisions. It serves as a foundational contractual framework for construction projects under TWC, detailing compliance requirements, change order processes, payment schedules, and dispute resolution mechanisms.
PDF
PDF, Low priorityq-and-a
LowAI Summary for 3202600095 Fort Worth 1st Floor Restroom Renovation - Q&A: A Questions and Answers document for solicitation 3202600095 regarding the Fort Worth 1st Floor Restroom Renovation. It contains 10 responses to vendor inquiries covering budget disclosure, pre-bid walkthroughs, fire alarm coordination, material specifications (natural birch), permit requirements, and the requirement for fully welded door frames.
LowAI Summary for Attachment 4 - Proposal Submission Checklist: This document is Attachment 4 titled Proposal Submission Checklist, designed to assist respondents in preparing a responsive proposal. It lists various forms and documents that should be included in a complete proposal submission, such as execution of response, narrative of qualifications, cost proposal, past project performance sheets, financial questionnaire, project milestone schedule, and other relevant materials. The checklist itself is not a mandatory attachment but serves as a guide to ensure all solicitation requirements are met.
PDF
PDF, Low prioritypre-bid-sign-in-sheet
LowAI Summary for Pre-Bid Conference Sign In Sheet for Ft Worth 1st Floor Restroom Renovations #3202600095: This document is a Pre-Bid Conference Sign In Sheet for the Ft Worth 1st Floor Restroom Renovations project, identified by project number 3202600095. The conference took place on January 14, 2026, at 301 W. 13th St., Ft Worth, Texas. The sheet lists attendees' names, agencies, phone numbers, and email addresses, indicating participation in the pre-bid meeting for this construction management project.
PDF
PDF, Low priority1 page · instructions
LowAI Summary for Texas Workforce Commission Substitute W-9 and Direct Deposit Form Instructions: This document provides detailed instructions for completing the Texas Workforce Commission Substitute W-9 and Direct Deposit Form. It explains the information required in each box of the form, including legal name, DBA, tax information mailing address, payment address, taxpayer identification number, federal tax classification, profit status, corporation information, sole ownership info, general partnership info, exemption from backup withholding, new and existing account information for direct deposit, international payments verification, and certification instructions. The instructions reference IRS guidelines and emphasize the importance of accurate and complete information for tax and payment processing purposes.
DOC
DOC, Low priority2 pages · tax-form
LowAI Summary for TWC Substitute W-9 and Direct Deposit Form: This document is the Texas Workforce Commission (TWC) Substitute W-9 and Direct Deposit Form. It collects taxpayer identification information, including legal and business names, tax addresses, and taxpayer identification numbers (SSN or EIN). The form also captures federal tax classification, profit status, corporation and partnership details, and backup withholding status. Additionally, it includes sections for direct deposit setup, changes, or cancellation, authorizing electronic payments from the State of Texas to the specified financial institution. The form requires certification under penalties of perjury and an authorized signature. This form is used for tax and payment processing purposes by the Texas Comptroller of Public Accounts.
The Texas Workforce Commission (TWC) is accepting proposals for the 1st Floor Restroom and Breakroom Renovations project at the TWC Fort Worth North Texas Tele-Center building located at 301 W. 13th Street, Fort Worth, TX 76102.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.