Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Foss Bridge No. 07704 Replacement

Closed
BC38206MJ0000Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Foss Bridge No. 07704 Replacement contract encompasses a full range of civil construction activities centered on the demolition of the existing bridge and the construction of a new structure with rock socketed piled abutments and cast-in-place concrete rock pads. Scope of work includes comprehensive site preparation, mobilization and demobilization, installation and subsequent removal of a temporary detour structure, traffic management, survey layout, environmental and quality management, riprap slope protection, reconstruction of bridge approaches with associated paving, revegetation, and thorough site cleanup. All activities must be executed with strict adherence to environmental, safety, and quality standards, and must be coordinated to minimize disruption to surrounding areas. The project is solicited by the Government of Canada through its Northern Regional Office under NAICS code 237310, with bids due by June 30, 2026. All project-specific inquiries must be directed via email to Lisa Amminson at lisa.amminson@parsons.com, while general contracting matters should be referred to the Provincialcontracts@gov.bc.ca contact listed as the Contracting Authority.

General Info

Replace Foss Bridge 07704 with new structure; includes detour, site prep, paving, and environmental management.

Agency

Government of Canada → Northern Regional Office

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Northern Regional Office
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Northern Regional Office
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
Works include but not necessarily limited to: Site preparation including mobilization, preparation and installation of detour structure,of Survey layout, traffic management, qualitiy management, removaland detour structure, removal of existing Foss Bridge, installation of riprap slope protection, bridge installation including rock socketed piled abutment an cast inplace concrete rock pad, reconstruction of bridge approaches and associated paving, removalof detour bridge, revegetation a, demobolizations, demobilization and site cleanup pilled abutment and cast in place conceret rock pad, reconstruction of bridge approaches and associated paving, removal of detour structure, revegetation and demobilization. Work also includes traffic, quality, and environemental ,management. Please direct all project specific enquiries related to this RFx by email to the Project Contact identified below and on the “Opportunity Details” tab under Additional Information SCT3.Project Contact Name: Lisa AmminsonEmail Address: lisa.amminson@parsons.com