Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Fourier Transform Infrared Spectrophotometer (FTIR)

Active
75F40126Q00406Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The FDA San Juan Medical Products Laboratory is seeking a firm-fixed price contract for the procurement and installation of a modern Fourier Transform Infrared Spectrometer (FTIR) system to replace a non-functional 17-year-old unit. The new system must be newly manufactured and comply with rigorous quality and regulatory standards, including ISO/IEC 17025-2017, ISO 9001:2008, 21 CFR Part 11, and USP cGMP/cGLP. Key technical requirements include a spectral range of 8,000-350 cm-1, a signal-to-noise ratio of 40,000:1, and an ATR with an XR Diamond Crystal Plate. The system must include a Windows 10 controller with integrated touchscreen and Ethernet connectivity, as well as necessary purge and desiccant replacement kits. The contractor is responsible for the inside delivery, onsite installation, and operational qualification (IQ/OQ) of the equipment in San Juan, Puerto Rico, with all deliverables due within 6 to 8 weeks of the award date. This includes providing user manuals and familiarization training for 3 to 5 users. Warranty requirements are extensive, featuring a minimum one-year limited warranty for the entire system, a five-year warranty for the Diamond ATR, and a ten-year warranty for the source, laser, and interferometer. Award will be based on technical acceptability and the lowest price, with the period of performance extending for at least one year from the date of formal government acceptance.

General Info

FDA seeks firm-fixed price contract for FTIR spectrometer procurement and installation in San Juan.

Agency

Department Of Health And Human Services → FDA Office Of Acq Grant SvcsView Agency

NAICS

334516 - Analytical Laboratory Instrument ManufacturingView NAICS

Place of Performance

San Juan, PR, 00901, USA

Set-Aside

NONE

Documents

(1)

75F40126Q00406 - Fourier Transform Infrared Spectrophotometer (FTIR)

DOCX17 pagesrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Health And Human Services → FDA Office Of Acq Grant Svcs
Contacts2 people available
OfficeRockville, MD, 20852, USA
Organization / Agency
Department Of Health And Human Services → FDA Office Of Acq Grant Svcs
View Agency Profile
Office AddressRockville, MD, 20852, USA

Full Description

Show more

Statement of Work (SOW)


Fourier Transform Infrared Spectrometer (FTIR) for the San Juan Medical Products Laboratory


Background


The Food and Drug Administration (FDA), San Juan Medical Products Laboratory (SJNLMP) needs to replace an existing Fourier Transform Infrared Spectrometer (FTIR) system used for routine sample identification analysis with a new Fourier Transform Infrared Spectrometer (FTIR System. The system in use needs to maintain cGMP/cGLP, ISO/IEC 17025-2017, ISO 9001:2008, and 21 CFR 11 standards for use as analytical equipment under the current accreditation. The system is used to analyze medical product samples using specific protocols and methods established by USP, internal FDA, DOD SLEP, and the FCC program.


As a Medical Product Specialty Laboratory, the laboratory uses FTIR technology to analyze and provide specific identification to a variety of drug samples. The San Juan Laboratory needs to update the existing 17-year-old FTIR to a new system with modern capabilities, software, and instrument components. The older FTIR system is no longer supported by the manufacturer, is out of service and in need of repairs, and is no longer functioning as intended. In addition, the hardware shows internal system rust and lens fogging, increasing maintenance cost, posing analytical failures and instrument malfunction. The newer Fourier Transform Infrared Spectrometer (FTIR) includes part warranties for up to 10 years and comes with newer software and instrument controller.


Objectives


To obtain a fully functional modern Fourier Transform Infrared Spectrometer (FTIR) with improved analytical capabilities to replace a 17-year-old FTIR system.


Scope


The Contractor shall provide all resources necessary to accomplish the tasks and deliverables described in this Statement of Work (SOW). One FTIR system to replace an older FTIR system.


Requirements


All the following system requirements are minimum requirements:


•   The Fourier Transform Infrared Spectrometer (FTIR) shall comply with the following quality requirements:


  • ISO/IEC 17025-2017 https://www.iso.org/standard/39883.html, https://www.iso.org/standard/66912.html
  • ISO 9001:2008 https://www.iso.org/standard/46486.html
  • 21 CFR Part 11 Compliance https://www.accessdata.fda.gov/scripts/cdrh/cfdocs/cfcfr/cfrsearch.cfm

  • USP, cGMP/cGLP

https://login.usp.org/cas/login?service=http%3A%2F%2Fonline.uspnf.com%2Fcas%2Flogin


  • Instrument controller firmware, drivers, and updates must be compatible with the current laboratory domain system.

•           The FTIR system shall include the following salient requirements:


  • Optical System shall include the following specifications:

  • Spectral range: 8,000-350 cm-1
  • Spectral resolution: Better than 0.45 cm-1.
  • Signal-to-Noise Ratio: 40,000:1.
  • Wavenumber Precision: 0.001 cm⁻¹ at 2,000 cm⁻¹.
  • Sealed and desiccated optical unit.
  • Detector: Thermoelectrically cooled (TEC) DTGS.
  • Interferometer with KBr/Ge mid-infrared beamsplitter.
  • Source: Single-point source with 10-year warranty.

  • ATR with XR Diamond Crystal Plate shall include the following specifications:

  • Spectral Range 7800 – 350 cm-1
  • Traceable polystyrene ATR standard

  • The system shall include a Desiccant Replacement Kit.
  • The system shall include Purge Kit.

•           Hardware and Connectivity shall include the following salient requirements:


  • Integrated touchscreen
  • Integrated LightBar status.
  • Ethernet connection
  • Monitor 22”
  • Wireless Keyboard and Mouse
  • Windows 10
  • The system shall include the current Instrument Controller Software with:
    • Data Acquisition & Analysis
    • Spectral Processing
    • Library
    • Instrument License
    • Current Instrument Firmware

•           Warranty:


  • The entire system shall be warrantied for parts and labor for a minimum of 1-year limited warranty from date of formal government acceptance.
  • The Diamond ATR shall be warrantied for 5 years.

  • The source, laser, and interferometer shall be warrantied for 10-years.

•           Delivery, Installation and Service


  • Onsite installation of the entire system shall be included and inclusive of labor, delivery, and travel costs.
  • Inside delivery, set up, installation, and clean-up of the area at the place of performance is required.
  • The systems shall be delivered with all necessary supplies and accessories required for installation and start-up.
  • Standard kits for operational qualification and performance verification (OQ/PV) shall be included.
  • Installation of hardware & software shall be conducted by factory-certified service personnel.
  • The vendor shall demonstrate upon installation that the system meets or exceeds all performance specifications which have been included in the vendor’s response and/or used as evaluation criteria for award. The following shall be demonstrated at the time of installation:

  • The contractor shall demonstrate that all modules start up properly, are correctly installed and connected.

  • Shall include Hardware IQ/OQ with Performance Verification.
  • Shall include Software IQ/OQ and testing of basic functional specifications and Chapter 21 CFR part 11.
  • The vendor shall provide IQ/OQ electronic documentation of Software and Hardware.
  • The vendor shall include a minimum of one preventative maintenance visit for the KFT to ensure the instruments are functioning at peak performance.
  • The vendor shall include shipping to Puerto Rico.

•           Training:


  • Onsite familiarization training for 3-5 users shall include basic system operation and routine maintenance.

Trade and Service Specs


•        Equipment shall be newly manufactured, not used, refurbished, or previously used for demonstration.


•        The Contractor shall provide a minimum of a one-year manufacturing warranty for all manufactured equipment and parts. Ten-year warranty on source, laser, and interferometer. The warranty shall be included with the equipment and not separately priced. The warranty shall include at a minimum: coverage on all non-consumable items and parts supplied including base instrument, factory-certified replacement parts, engineer labor and travel costs. Any equipment repair and maintenance work shall be performed by an OEM-trained engineer. This factory-trained engineer shall have (verified by the OEM) the following: 1) access to OEM factory telephone support; 2) access to the most current OEM factory training for both hardware and software components; and 3) access to all current OEM factory parts, not build-to-order parts. The OEM-trained service engineer shall not use salvaged parts from other instruments for performing maintenance and repairs. All parts used in PM and repairs must be guaranteed, factory-tested, OEM quality parts.


•        Instrument operators shall have access to a technical representative call center at no additional charge, for technical assistance and troubleshooting, which is staffed by senior engineers to provide a high level of expertise for troubleshooting the instrument.


•        The supplier shall provide training and validation of the equipment and software on site at the time of installation. Sufficient familiarization training for 3-5 users per delivery onsite location will be provided, such that operators may independently operate the instrument and with increased familiarity and proficiency. The training shall include manuals and any consumables to be used during training.


•        The Contractor shall provide installation qualification with an employee who can provide proof of installation qualification/operation qualification (IQ/OQ) certification. The qualification and verification report shall include the standard operating procedures and the allowed manufacturer limits for the instrument. A copy of the calibration report and the qualification and verification report(s) shall be reviewed and approved by an FDA representative before installation of the equipment and execution of protocols.


•        Inside delivery, disposing pallets, boxes, and any associated garbage, and unpacking the equipment and inventory of parts with a lab representative.


Deliverables or Delivery Schedule


Deliverable


Quantity


Due Date


FTIR (Fourier Transform Infrared Spectrometer) with Controller Software - 1


Within 6-8 weeks after date of award


Installation and Operation Qualification documentation - 1


Within 6-8 weeks after date of award


Familiarization Training - 3-5 users


Within 6-8 weeks after date of award


Instrument and Software User Manuals - 1


Within 6-8 weeks after date of award



Place of Performance


Food and Drug Administration


San Juan Medical Products Laboratory


466 Fernandez Juncos Ave,


San Juan, PR 00901-3223


POCs: To be identified at time of award.


Vendor must call the Government POC at least 48 hours prior to delivery. Unless otherwise specified, deliveries shall be made to the Delivery Point specified above, Monday through Friday (excluding Federal Holidays see below between the hours of 8:00 a.m. and 4:00 p.m. in accordance with the delivery location time zone (Eastern Time, Central Time, or Pacific Time). Supplies or services scheduled for delivery on a Federal holiday shall be made on the next business day. Delivery must be inside the facility.


Period of Performance


The Period of Performance begins the date of contract award execution and continues for one year (or longer depending on how long the OEM offered warranty period is) from the date of formal government acceptance. Instrument to be delivered no later than 6-8 weeks after date of award.


Hours of Operation


The contractor is responsible for conducting business, between the hours of 8:00 AM – 4:00 PM Monday through Friday except Federal Holidays or when the Government facility is closed due to local or nation emergencies, administrative closings, increment weather, or similar Government directed facility closings. The contractor will not be expected to provide services on the following days:


New Year’s Day                                                                      Labor Day


Martin Luther King Jr’s Birthday (Observance Day)            Columbus Day


President’s Day                                                                       Veteran’s Day


Memorial Day                                                                         Thanksgiving Day


Juneteenth                                                                               Christmas Day


Independence Day                             

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Health And Human Services → FDA Office Of Acq Grant Svcs

Same awarding agency

NAICS: 541618
New
Federal
Rapid Nicotine Pouch Data Analysis Services
Solicitation # 75F40126Q00407
The FDA's Center for Tobacco Products is seeking a contractor to provide sentinel surveillance reports on electronic nicotine delivery systems and nicotine pouches to monitor use patterns and emerging brands among youth and young adults. This firm-fixed-price contract, falling under NAICS 541618, spans a total of 60 months, consisting of a 12-month base period and four subsequent 12-month option years. The contractor will be responsible for delivering 12 monthly reports from an existing online continuous tracking survey, two reports per year from a nationally representative longitudinal cohort study, and two ad hoc topic-specific reports annually. All deliverables must include detailed methodology, data analysis, and summary presentations. The contractor will perform all work at their own place of business, with coordination handled through a kick-off meeting and recurring monthly and quarterly teleconferences. Award will be based on a best-value approach, prioritizing the highest technical rating with a fair and reasonable price. Key evaluation factors include the existence of a data collection panel, understanding of youth tobacco use, relevant past performance, and the qualifications of key personnel. The contract is open for full competition, and the government will evaluate proposals based on technical approach, staffing, and a firm-fixed-price proposal submitted via a specific pricing template.
Other Management Consulting Services

POSTED

1 day ago

DEADLINE

in 1 day
View Details
NAICS: 334516
New
Federal
Vanquish Neo System and Ion Chromatography system
Solicitation # 75F40126Q000430
The U.S. Food and Drug Administration is soliciting quotations for a single award to acquire two laboratory chromatography systems under NAICS code 334516. The first requirement is for a Thermo Scientific Vanquish Neo System or equal for the Center for Veterinary Medicine in Laurel, Maryland, which must be compatible with an Orbitrap Exploris 240 mass spectrometer and includes a twelve-month warranty and two days of on-site LC support. The second requirement is for a Thermo Scientific Dionex ICS-6000 HPIC System or equal for the National Forensic Chemistry Center in Cincinnati, Ohio, which includes installation, start-up, and analyst training for up to five personnel. Award will be made using the Lowest Price Technically Acceptable approach, with technical acceptability determined on a pass/fail basis regarding compliance with minimum requirements and salient characteristics. The Vanquish Neo System must be delivered within six weeks after receipt of order, while the Ion Chromatography System must be delivered within thirty calendar days of award. Offerors must provide itemized pricing for all CLINs, manufacturer details, and country of origin information. Full payment is contingent upon successful delivery, installation, and completion of required training to the satisfaction of the government.
Analytical Laboratory Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 333415
New
Federal
Walk-In Laboratory Cooler
Solicitation # 75F40126Q00386
Solicitation 75F40126Q00386 is a firm-fixed-price requirement for the procurement and delivery of one new walk-in laboratory cooler to support the Chemistry Proficiency Testing and Method Validation Program at the FDA Moffett Center in Bedford Park, Illinois. This acquisition is a total small business set-aside under NAICS 333415. The cooler must feature stainless steel construction, interior dimensions of approximately 105 by 80 by 105 inches, temperature control of 2 degrees Celsius plus or minus 0.5 degrees Celsius with redundant refrigeration, four GFCI-protected interior electrical outlets, and an interior emergency door release. While the contract includes the equipment, accessories, and freight, installation and site preparation are explicitly excluded from the scope. The award will be made using the Lowest Price Technically Acceptable method, with technical acceptability evaluated on a pass/fail basis. Key deliverables include the cooler unit, manufacturer documentation, and a standard commercial warranty. The equipment must be delivered within 120 calendar days after award, with inspection and acceptance occurring at the delivery location. Following the most recent update in Amendment A00003, the quotation due date has been extended to September 18, 2026, at 2:30 PM Eastern Time. Quotations must be submitted via email to the contracting officer, Iris Johnson, and include technical specifications, pricing for CLIN 0001, and confirmation of active SAM.gov registration.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

2 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS