Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Frazier Field Eddie White Complex Parking Lot Project

Closed
Frazier Field – Eddie White Complex Parking Lot ProjectState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 11 hours ago

DEADLINE

in 13 days
NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 13 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Frazier Field Eddie White Complex Parking Lot Project involves comprehensive demolition and construction activities at a site in California. The scope includes the saw cutting of concrete and asphalt for proper removal, along with the responsible disposal of all construction waste generated during demolition. On the construction side, the project entails installing new asphalt pathways, dikes, gutters, approaches, curb ramps, and streets, including the placement of AC joiner strips and preservation of survey monuments to ensure accurate site layout. A key feature of the project is the construction of a bioretention basin, designed in accordance with detailed plans, specifications, and special provisions to promote sustainable stormwater management. The project is managed by the City of El Centro and is categorized under NAICS code 238910, which pertains to site preparation contractors. The contract value is estimated to range between $500,000 and $1,500,000. The solicitation was posted on September 2, 2025, with a response deadline of October 9, 2025. Interested contractors can contact Omar Negrete via email or phone for further information. The project emphasizes adherence to technical specifications and environmental considerations, aiming to enhance the functionality and sustainability of the parking lot area.

General Info

Agency

California → City of El Centro

Place of Performance

CA, USA

Set-Aside

NONE

Documents

2

City of El Centro - Frazier Field Park Site Plan

PDF, High priority: read this firstspecifications
High

Frazier Field - Eddie White Complex Parking Lot Project

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of El Centro
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of El Centro
Office AddressN/A

Full Description

Show more
This project encompasses general demolition, including saw cutting of concrete and asphalt, and responsible disposal of construction waste. The construction scope includes installing new asphalt pathways, dikes, gutters, approaches, curb ramps, and streets, including AC joiner strips and survey monument preservation. Additionally, a bioretention basin will be constructed in accordance with the plans, specifications, and special provisions.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS