Front Country Fire Break- North 1.5 Mile

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Front Country Fuel Break is a strategic wildfire mitigation project extending approximately 29 miles from Rumsey, California, along the base of the Inner Coast Range through Yolo County to near west Winters, designed to slow or halt the spread of wildfires approaching from the north and east, particularly to protect Capay Valley, Winters, and western Yolo County. Historically utilized during major fire events like the LNU Complex in 2020 and the County Fire in 2018, the fuel break serves as both a firebreak and an emergency access route for firefighting operations. The initial phase focuses on the first mile, which follows the former alignment of Highway 16 and is currently overgrown with invasive grasses and non-native weeds. Dozer operations will clear a 10- to 15-foot-wide strip down to bare soil or pavement, with a 50-foot no-disturbance buffer maintained around a single blue elderberry shrub and an intermittent stream, which the equipment will bypass via a designated detour using a landowner’s driveway. All work will be conducted by a licensed dozer operator under the supervision of the Yolo County Resource Conservation District, with coordination from CAL FIRE and the Capay Valley Fire Protection District. The project area traverses private lands, including tribal lands of the Yocha Dehe Wintun Nation and California Audubon’s Bobcat Ranch, requiring extensive engagement and consultation with landowners and cultural stakeholders. A desktop review using the California Native Diversity Database, iNaturalist, and Calflora, along with on-the-ground surveys by a state-qualified biologist, confirmed the absence of protected biological resources within the footprint, with vegetation dominated by invasive species. Surveys for nesting birds or other protected species will occur no less than three days prior to work during nesting season and one week prior outside of it, allowing for adaptive adjustments. The project aligns with the Yolo County Community Wildfire Protection Plan and is part of a broader effort to enhance regional resilience to wildfire, with the initial mile serving as a prototype for future expansion. The Yolo County Resource Conservation District is the lead organization, with key contacts including Executive Director Heather Nichols and Battalion Chief Trevyn Close overseeing coordination and implementation.

General Info

Clears 10–15 ft fuel break on private land to halt wildfires, protects communities, avoids sensitive species, led by Yolo County RCD.

Agency

California → Yolo County Resource Conservation District

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Front Country Fire Break - North 1.5 Mile

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Yolo County Resource Conservation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Yolo County Resource Conservation District
Office AddressN/A
Contacts
Heather NicholsExecutive Director
Trevyn CloseBattalion Chief

Full Description

Show more
The Front Country Fuel Break starts in Rumsey, CA and follows the base of the Inner Coast Range extending the north-south length of Yolo County and ending near west Winters, CA. Historically, the fuel break was implemented during wildfire events, most recently the LNU Complex {2020} and the County Fire (2018} to stop or slow wildfire approaching from the north and east. It serves as an access point for firefighters and a break in fuels to slow the spread of fire that would impact the Capay Valley, Winters, and western Yolo County. Yearly maintenance of the Front Country Fuel Break was proposed by CAL FIRE and included as a project in the Yolo County Community Wildfire Protection Plan (CWPP). The entire N29-mile fuel break crosses through private property, including Yocha Dehe Wintun Nation tribal lands and California Audubon's Bobcat Ranch. To start the fuel break, Yolo County Resource Conservation District (RCD) is partnered with Capay Valley Fire Protection District to map the project, engage landowners, conduct biological and botanical surveys and contract with CAL FIRE or a qualified licensed dozer operator to blade the first mile of the fuel break. The first mile of the fuel break largely follows the path of old Highway 16 and is intermittently paved, but overgrown with invasive grasses and other weeds. Implementation of the fuel break would include 10-15 feet of blading of vegetation by a dozer to remove 100% of groundcover to bare soil/pavement. The fuel break footprint does not contain any shrubs or trees, except for one blue elderberry along a fence line that will have a SO-foot no-disturbance buffer from the dripline. Dozer operations will be overseen by Yolo County RCD and implemented by CAL FIRE's Licensed Dozer Operator or another qualified professional dozer subcontractor to the RCD. An intermittent stream was identified to intersect with the fuel break footprint. The RCD has identified a route for the dozer to travel adjacent to the stream outside of a SO-foot no disturbance buffer towards Highway 16 where the stream crosses beneath the highway. The dozer will then continue the fuel break by using a landowner's driveway to re-access the footprint (see attached map for intermittent stream avoidance route). Yolo County RCD conducted a desktop review of the first one-mile footprint using the California Native Diversity Database (CNDDB), iNaturalist, and Calflora to determine potential biologic and botanical resources. The draft extent of the entire fuel break footprint was submitted via a Native American Heritage Commission Records request and further consultation on the one-mile footprint has occurred withYocha Dehe Wintun Nation's Cultural Department. An RCD California Dept of Fish and Wildlife (CDFW) qualified biologist has walked the first mile of the fuel break and found no resources of concern; the project's footprint largely consists of invasive grasses and other non-native species. If work commences during nesting season, an RCD CDFW qualified biologist will survey the entire 1-mile project area for nesting birds or other protected species not less than three (3) days prior to work and will make any necessary adjustments to project implementation plans. After nesting season, surveys will occur a week before work starts. This fire break will be used for emergency access and/or burning-out operations to stop the spread of fires at the base of the foothills to prevent fire from crossing west into adjoining counties, or east into the Ca pay Valley.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project located in Marina, California. The project encompasses a wide range of upgrades including replacement of digester gas piping and safety equipment, installation of new level measurement devices and five linear generators with associated electrical work, recoating and concrete repairs to four digesters and the building, installation of biogas conditioning and RNG upgrading systems with a pipeline to the PG&E injection station, replacement of the steam boiler with a hydronic heating system, replacement of waste gas flares with enclosed flares, and full demolition of the Cogen facility and related structures. Additional civil, structural, mechanical, and electrical work is required to support these improvements, with specific focus on enhancing renewable energy output and operational safety at the facility. Bidders must respond to this solicitation by the deadline of August 20, 2026, and are required to email estimating@gseconstruction.com to request access to secure project documents prior to submission. The contract falls under NAICS code 238910 and is open to Disadvantaged Business Enterprises certified under the Department of Transportation, Minority Business Enterprises certified by NMSDC, and Women Business Enterprises certified by WBENC. Primary point of contact for inquiries is Michael Demissie, reachable by phone or email. All bids must be submitted through the formal process outlined by GSE Construction Co., Inc., and bidders are expected to review full project documentation before submitting proposals.
GSE Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport S Concourse Evolution (SCE) Bid Package 2 is a major construction procurement managed by Hensel Phelps as General Contractor / Construction Manager, targeting small disadvantaged businesses under an 8A set-aside with a NAICS code of 238910. The scope encompasses eleven distinct subsystems including demolition and abatement, building concrete retrofit, structural steel and metal stairs, fire suppression, site paving, runway and taxi marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems, all concentrated at the airport’s S Concourse. Budget ranges for these subsystems collectively estimate the total contract value between $124.2 million and $143.7 million, with individual subsystems ranging from $600,000 for runway marking to over $20 million for baggage handling systems. All subcontracts exceeding $100,000 require performance bonds using Hensel Phelps–provided forms, and all subcontractors must comply with a mandatory Workers’ Compensation Waiver of Subrogation. The project operates under a Project Labor Agreement requiring union labor adherence, and all subcontracts must use Hensel Phelps’s standardized subcontract templates supplied in the bid documents. Bids are due by August 11, 2026, at 8:00 PM PDT and must be submitted via email to SEA-SCEBids@henselphelps.com using the official bid form from the Instructions To Bidders document. The place of performance is fixed at Seattle-Tacoma International Airport in Washington, and the solicitation is open exclusively to small disadvantaged businesses registered under the 8A program.
Hensel Phelps

POSTED

about 8 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to support the Design-Build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, under solicitation number 2026-138. The project will deliver a 0.50 MGD facility designed to produce approximately 500 acre-feet per year of purified water, encompassing key components such as a 200,000-gallon equalization tank, microfiltration/ultrafiltration and two-stage reverse osmosis systems, UV/advanced oxidation processes, post-treatment stabilization, chlorination, chemical storage and feed systems, purified water storage and pumping infrastructure, approximately 2,000 linear feet of HDPE conveyance pipelines, and groundwater recharge elements including one injection well and two monitoring wells. The scope also includes full electrical, instrumentation, SCADA, and control systems necessary for facility operation. Bidders must respond under specified NAICS codes including 237110, 238120, 237310, 238990, 561730, 238110, 238320, 332312, 238220, and 221310, and must request project documents via email at estimating@gseconstruction.com to gain secure access to all technical and contractual materials prior to submission. The solicitation is open exclusively to small businesses, with set-asides designated for Small Business, Small Disadvantaged Business, Women-Owned Small Business, Disadvantaged Business Enterprise certified under the Department of Transportation, and Minority Business Enterprise certified by NMSDC. The response deadline is August 11, 2026, and all bids must be submitted through the formal requesting process outlined by GSE Construction. Primary points of contact for inquiries are Michael Demissie and Juan Catano, both reachable via email at mdemissie@gseconstruction.com and jcatano@gseconstruction.com respectively. The project is located at 966 Huber Street, Pismo Beach, CA 93433, with performance confined to this site in California. Bidders are expected to fully review the detailed project documentation before submitting competitive proposals, and no bids will be accepted without prior request and access to the comprehensive suite of project files.
GSE Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details