The Bannockburn Village structures at the University of California, Riverside have deteriorated to a point where significant investment is required to meet modern seismic safety standards, leading to the decision to demolish the entire complex. This action aligns with the 2021 Long Range Development Plan Environmental Impact Report and includes the removal of all buildings, ancillary structures, and site features such as landscaping and hardscape. Following demolition, the site will be stabilized and temporarily repurposed with gravel parking and modular buildings to support ongoing campus operations. Prior to demolition, students currently housed in Bannockburn Village will be relocated to existing on-campus housing, while Auxiliary Services, Residential Life, and Foster Youth Support Services staff will be moved to other available campus office spaces or temporarily housed in modular units on-site. One commercial tenant’s lease has already expired and will not be renewed, while the other tenant’s lease is set to expire in October 2026; the university will offer relocation payment rights to the commercial tenant in the event of early termination. The project is managed by the University of California, Riverside’s Campus Planning office, with Stephanie Tang serving as the primary point of contact.

General Info

Bannockburn Village to be demolished for seismic safety, relocated residents and staff, site repurposed temporarily.

Agency

University of California, Riverside

Place of Performance

Canyon Crest Drive and University Avenue, Riverside, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyUniversity of California, Riverside
Contacts1 person available
OfficeN/A
Organization / Agency
University of California, Riverside
Office AddressN/A
Contacts
Stephanie TangDirector of Campus Planning

Full Description

Show more
The Bannockburn Village buildings have reached the end of their lifespan and require substantial investments to provide for adequate seismic safety. Consistent with the analysis in the 2021 Long Range Development Plan Environmental Impact Report, the proposed project address seismic, aging, and deteriorating buildings through the demolition of Bannockburn Village. The structures, along with ancillary structures, landscape, and hardscape, would be demolished and removed, and the site would be stabilized and include temporary gravel parking and modular buildings. Prior to demolition of these structures, students would have the option to be relocated to existing on campus student housing, Auxiliary Services and Residential Life staff would be relocated to existing office spaces on campus or temporarily placed within modular buildings on the project site, the Foster Youth Support Services staff would be relocated to existing office spaces on the project site. One of the leases for the commercial tenants has expired and will not be renewed while the other lease for the commercial tenant will expire in October 2026. The university will provide relocation payment rights for the early termination.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
2026-41 Demolition of Condemned Church Building
Solicitation # 2026-41
The City of Charleston, WV, is soliciting bids from qualified contractors for solicitation 2026-41, involving the demolition of a condemned church building located at 915 Main St, Charleston, WV 25302. The comprehensive scope of work includes all-inclusive asbestos abatement for the rooftop and flooded basement areas, complete structural demolition, and site restoration consisting of leveling, compaction, and seeding for future use by the City's Building Commission. The project must be completed within 45 calendar days following the issuance of a Notice to Proceed. Award will be granted to the lowest responsible bidder who meets all mandatory specifications and responsiveness requirements. This project is funded in whole or in part by a HUD Community Development Block Grant (CDBG) and is subject to strict federal requirements, including the Davis-Bacon and Related Acts prevailing wage requirements under General Decision No. WV20260038. Contractors are required to submit weekly certified payroll reports and comply with Section 3 Equal Employment Opportunity, the ADA, and Section 504 of the Rehabilitation Act. Additionally, the contractor must adhere to EPA NESHAP and OSHA standards for asbestos and lead-based paint handling. Required submissions include a bid bond, performance bond, labor/material payment bond, and a Federal Funds Addendum Vendor Certification. Bids must be submitted via BidExpress or in a sealed envelope by November 13, 2026, at 1:00 PM EDT, as emailed bids are not accepted.
City of Charleston, WV

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS