Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fuel Pit Door Remove and Reinstall - JPBHH, HI

Closed
FA521526R0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract FA521526R0021 is a firm-fixed-price solicitation for the removal and replacement of two aircraft fuel pit door lids at Joint Base Pearl Harbor-Hickam, Hawaii, specifically relocating the serviceable lid from parking spot 21D to replace the damaged lid at spot 22B. The lids are model DAB-725WP, measuring approximately 30 inches wide by 78 inches long and weighing about 660 pounds. All work must be completed in compliance with federal, state, Department of Defense, and Air Force regulations including Davis-Bacon wage determinations, REAL ID requirements for personnel, environmental laws, and manufacturer specifications. The contract is a Small Business Set Aside with a size standard of $45 million, and proposals must be submitted via email to the designated point of contacts by August 10, 2026, at 1200 HST. Offerors are required to complete and submit Attachment 4 through Attachment 6, including a detailed Price Proposal Spreadsheet with a Basis of Estimate, as failure to do so renders the proposal nonresponsive. The solicitation does not include a government cost estimate or unit pricing, requiring offerors to provide fully developed pricing in the required format. Performance must begin no later than 10 business days after contract award and be fully completed with government acceptance by September 4, 2026. Work is performed at the destination, with final inspection and acceptance conducted on-site at parking spot 22B following a joint walkthrough with the Contracting Officer and Contracting Officer Representative. Acceptance criteria require zero unresolved punch list items and full operational functionality of the installed lid. The contractor is responsible for all personnel, equipment, tools, materials, debris removal, recycling of packaging, and coordination with base authorities for site access. Security and compliance requirements include adherence to cybersecurity protections outlined in FAR 52.240-93 and DFARS 252.204-7004, personal identity verification (PIV) for all personnel, antiterrorism awareness training, compliance with prohibitions on procurement from the Xinjiang Uyghur Autonomous Region and the Maduro regime, and exclusion of convict labor. Payment will be processed through WAWF using an Invoice 2in1 format for fixed-price service items, and accelerated payments to small business subcontractors are mandated. The Government will award to the responsible offeror with the lowest evaluated price whose

General Info

Remove and reinstall two 660-pound fuel pit door lids at JPBHH under solicitation FA521526R0021.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

JBPHH, HI, 96860, USA

Set-Aside

SBA

Documents

6

735 AMS Fuel Pit Lid Swap and Installation PWS v1.3

PDF, High priority: read this firstpws
High

A2+ Provisions and Clauses - Federal Contract Clauses

PDF, High priority: read this firstclauses
High

RFP FA521525R0021 Price Proposal Spreadsheet

XLSX, High priority: read this firstprice-proposal-spreadsheet
High

RFP FA521526R0021 Fuel Pit Door Remove and Reinstall

DOCX, High priority: read this firstrfp
High

RFP FA521526R0021 Questions and Answers

PDF, Low priorityq-and-a
Low

A3+-+DBAWD.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5215 766 Ess Pkp
Contacts2 people available
OfficeJBPHH, HI, 96860-4928, USA
Office AddressJBPHH, HI, 96860-4928, USA

Full Description

Show more

Requirement is for the removal of two Fuel pit door lids, 22B and 21D, whereas 21D is to be installed where 22B used to be. Fuel pit doors are model DAB-725WP and are approximately 30 inches wide by 78 inches long with a rough weight of 660lbs. For further details and visual references, please consult Attachment 1. Note that completing and submitting Attachment 4 - 6 is a requirement for this proposal. These attachemnts are designed to coninside with our contracting writing system and are apart of the evaluation criteria. 



AMENDMENT 0001


Upload of A - 6 containing responses to questions from RFQ.



Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS