Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fuel Tank Removal and Replacement, City Project No. 26-501

Closed
NIB No. PW-25-08State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
Environmental Trust, Comprehensive Emergency Management Plan Update & Environmental Engineering and Consulting Services
Solicitation # Environmental-Trust_RFP_FY-2027_Emergency-Plan-Update-Environmental-Services_1014.pdf
The Confederated Tribes of the Colville Reservation is soliciting professional services for a combined scope of work with a maximum budget of 289,497 dollars. The project is divided into two primary functional areas: emergency management planning and environmental engineering and consulting. The emergency management portion, capped at 150,000 dollars, involves updating the 2014 Comprehensive Emergency Management Plan, developing Emergency Support Functions and hazard-specific annexes, creating a tabletop exercise package, and establishing the first Tribal Threat and Hazard Identification and Risk Assessment and Continuity of Operations Plan. The environmental services portion, capped at 139,497 dollars, includes biannual groundwater monitoring and testing at the Nespelem Post and Pole site and the removal and disposal of hazardous materials at the Nespelem Recycle Center. The contract period ends on September 30, 2027, and is renewable on a yearly basis subject to tribal appropriation and fund availability. Key requirements include the submission of mandatory monthly progress reports and the provision of all final deliverables in editable Microsoft Office and PDF formats. Because the total value exceeds 100,000 dollars, a performance bond is required, though a 25% retainage may be used for smaller amounts. Proposals are due by November 5, 2026, and will be evaluated based on a criteria process that includes a weighted scoring system for Tribal Employment Rights Office status. TERO fees are not to be included in the proposed scope of work budget and will be determined separately.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The City of Placentia is soliciting sealed bids for a project focused on the removal and replacement of underground fuel storage tanks and related infrastructure. The scope includes the demolition and removal of two 12,000-gallon single-wall fiberglass underground tanks, associated fuel dispensers, piping, tank monitoring systems, wiring, and conduit, with all work to be completed in compliance with local and state environmental regulations, including the closure of tanks by December 31, 2025. Additionally, the project involves installing a new dual-compartment underground tank with a capacity of 15,000 gallons, designed to store gasoline and diesel, along with all necessary piping, spill protection, fuel dispensers, and monitoring systems, adhering to strict technical specifications and standards such as the 2024 Greenbook and applicable utility and state codes. The contract, identified as Fuel Tank Removal and Replacement (City Project No. 26-501), is open to qualified bidders and has an estimated value between $500,000 and $1,500,000. It was posted on October 20, 2025, with a response deadline of November 3, 2025. The project is managed under NAICS code 541620, and interested parties can contact Shelley Kennell via email or phone for further details. The work must meet all regulatory requirements and standards, ensuring environmental safety and compliance throughout the project duration.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Placentia
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The City of Placentia invites sealed bids for the demolition and removal of two 12,000-gallon single wall fiberglass underground fuel storage tanks, three fuel dispensers and associated piping, existingtank monitor systems, wiring and conduit. Work by the Contractor shall include all sampling,testing, reporting, paperwork and inspections needed to successfully complete all requirementsof Placentia Building Department and Orange County Health Care Agency (OCHCA) –Environmental Services. The tanks and connected piping must be permanently closed beforeDecember 31, 2025 in accordance with H&SC, section 25298, and California Code of Regulations(CCR) title 23, chapter 16, section 2672.The additive “B” schedule work includes construction and installation of one 15,000-gallon dualcompartment (10k gasoline/ 5k diesel) underground fuel storage tanks, all associated piping,wiring and spill protection, two dual hose fuel dispensers, tank and piping monitor system.All construction work shall be in accordance with the project bid documents, plans, technical specifications and all other references as depicted in strict adherence to the 2024 Greenbook, City’s standards and all other State and utility agency specifications.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS