Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fuel Transfer Pump Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Dallas Area Rapid Transit is seeking a subcontractor to supply an aboveground tank fuel transfer pump or an approved equivalent suitable for dispensing fuel from storage tanks to vehicles and equipment. The requirement specifies that the pump must meet operational standards for safe and efficient fuel transfer in a transit environment, with no preference indicated for a specific manufacturer as long as the equipment is approved as an equal alternative. The solicitation is posted under NAICS code 333911, which corresponds to commercial and industrial machinery and equipment manufacturing, and is open for responses until June 19, 2026. The contract is structured as a subcontract with no set-aside designation, and the performance location is not specified beyond the agency’s jurisdiction in Texas. Interested parties must submit proposals through the provided web portal by the deadline to be considered for award.

General Info

Dallas Area Rapid Transit seeks subcontractor for approved aboveground fuel transfer pump by June 19, 2026.

Agency

Texas → Dallas Area Rapid TransitView Agency

NAICS

333911 - Pump and Pumping Equipment ManufacturingView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of B-2097453.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Northwest Shop - ATF & Coolant Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Dallas Area Rapid Transit
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of an aboveground tank fuel (ATF) transfer pump or approved equal, suitable for dispensing fuel from storage tank to vehicles or equipment.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 238340
SLED
Annex Floor Tile and Paint
Solicitation # B-2098311
Dallas Area Rapid Transit (DART) has issued solicitation B-2098311 for the replacement of hallway floor tiles and interior wall painting at the Central Rail Operations Facility (CROF) Annex Building in Dallas, Texas. The scope of work includes the removal and installation of approximately 3,500 square feet of charcoal vinyl composition tile, the installation of 1,200 linear feet of dark gray vinyl cove base, leveling of approximately 380.79 square feet of concrete flooring, and the preparation and painting of approximately 10,000 square feet of hallway walls. The project is designed to improve the facility's durability and appearance, with a performance period of five months from the notice to proceed, potentially extendable by eight months. The contract is an invitation for bids for locally funded supplies and services, with the award granted to the responsible bidder who provides the most advantageous price and price-related factors. Bidders must submit a comprehensive package including a bid schedule, representations and certifications, a business questionnaire, and an employee information report. Key requirements include compliance with small business concern provisions, drug-free workplace certifications, and non-discrimination assurances. The contractor is responsible for all labor, materials, and equipment, ensuring that all work meets DART standards and manufacturer recommendations, with final acceptance contingent upon the absence of defects in workmanship.
Tile and Terrazzo Contractors

POSTED

18 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS