Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Full depth recycle and V-ditches.

Closed
06-1C0604State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract involves a construction project for full depth pavement recycling and V-ditch installation along a segment of Route 223 near Bakersfield in Kern County, California. With an estimated value of approximately $11.6 million, the project requires a licensed contractor holding either a Class A or a majority Class C-12 license. The work must be completed within 110 working days, with bid packages available electronically starting September 22, 2025, and bids due by October 29, 2025. The California Department of Transportation emphasizes compliance with Title VI of the Civil Rights Act of 1964, ensuring nondiscrimination and encouraging participation by disadvantaged business enterprises. All project documents, including plans and specifications, are accessible online via the Caltrans Construction Contract Award website, and inquiries can be directed to the Office Engineer or through designated Caltrans inquiry portals. The solicitation is structured as an electronic bidding process, with no explicit mention of detailed evaluation criteria or award factors beyond standard low-bid selection for responsible and responsive bidders. The contract emphasizes licensing requirements, non-discrimination policies, and adherence to Caltrans standards, but does not specify particular packaging, marking, or inspection procedures within the available documentation. Administrative details such as payment offices, invoicing methods, or specific contract management contacts are not included in the provided materials, which primarily direct bidders to online resources for comprehensive project specifications and submission instructions. Overall, the contract underscores compliance with federal civil rights laws, licensing prerequisites, and electronic bid submission procedures, with all supporting documents and project information centrally managed through Caltrans’ digital platforms.

General Info

Documents

1
PDF, High priority: read this first1 page · presolicitation
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A

Full Description

Show more
06-Ker-223-1.8/10.4   ***   KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 223/5 SEPARATION TO 0.1 MILE WEST OF ROUTE 223/99 SEPARATION

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project issued by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29, from Coyote Creek Bridge to Diener Drive/Road 543, and Route 53 at Route 29. Key activities include cold planing of AC pavement, installation of Rubberized Hot Mix Asphalt Gap Graded overlay, and Hot Mix Asphalt Type A surfacing. The project also involves bridge work at Coyote Creek Bridge, drainage improvements, utility plans, and the installation of sinusoidal rumble strips and traffic stripe tape. The estimated cost for the project is 14.4 million dollars. Bids must be submitted via the Bid Express website by January 6, 2027, and must include bidder security of at least 10 percent of the bid. Proposed project durations must fall between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and includes strict requirements for Buy America/Build America compliance and environmental product declarations for concrete and asphalt. Contractors must adhere to rigorous environmental standards, including specific pressure washing protocols for equipment to prevent the spread of invasive species and compliance with the RWQCB basin plan. Performance must begin within 55 days of contract approval by the Attorney General, with a notice of start required 72 hours prior to activity. The project mandates the use of prevailing wages and requires a certified safety representative with specific Cal/OSHA or OSHA training and professional certifications. Quality control personnel must hold ACI Concrete Field-Testing Technician Grade 1 certification. Temporary concrete barriers must be fabricated at authorized facilities and meet MASH Test Level 3 safety standards.
Highway, Street, and Bridge Construction

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS