This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS Battery Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation W912HQ26S0066 is a firm-fixed-price requirement issued by the U.S. Army Corps of Engineers Headquarters for the full start-up and commissioning of data center environmental control systems and the replacement of UPS batteries at Building 2592 in Alexandria, Virginia. The scope of work includes the commissioning of twelve Liebert CRV units, two Liebert IRC controllers, and one Multistack rooftop chiller, as well as the installation of one new top fan. Additionally, the contractor must decommission and remove eighty existing batteries for an Eaton PW9390-160 UPS system, provide new batteries, and ensure EPA-compliant disposal with a formal certificate of recycling. The project must be completed within 90 days of award, and the contractor is required to maintain an OSHA-certified competent person onsite. This procurement is a total small business set-aside under NAICS code 238210, utilizing simplified acquisition procedures. A mandatory site visit was scheduled for September 1 at the Cude Building 2592, and offers are due by September 8. Evaluation is based on technical capability, past performance via two references from the last two years, and price analysis. Eligible offerors must be U.S. citizens or nationals with valid government IDs and active SAM registration. Submissions must include a technical work plan limited to ten pages, a detailed price proposal following the specified CLIN structure, and compliance with wage determination VA20260178. All quotes must be submitted electronically via email to the contracting office.
General Info
Place of Performance
Alexandria, VA, 22315, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Offers are due 8 SEPT. The U.S. Army Corps of Engineers Headquarters has a requirement to to execute the full start-up and commissioning of existing data center environmental control systems based on original design specifications, as well as the replacement and EPA-compliant disposal of batteries for an Eaton Uninterruptible Power Supply (UPS) system.This procurement will be awarded under Simplified Acquisition Procedures. There will be one site visit at the Cude Building 2592 on Tuesday, 1 September. The site visit is required. All contractors will need to meet at the CUDE Building 2592, 7701 Telegraph Road, Alexandria, Virginia 22315 for check-in beginning at 0900. All contractors who wish to be at the site visit must send their names, phone numbers, and company names to the Contract Specialist, Rick Klein, via email. All contractors must be US Citizen or US National and possess a valid Government ID. Must have driver license to enter Facilities. It is the Offeror’s responsibility to ensure the quote has been received by the contracting office via email. Fax quotes will not be accepted. Late quotes will be processed in accordance with RFO 52.212-1(c) “Late submission, modifications, revisions, and withdrawals of offers.” Upon receipt of the electronic offer, the Government will acknowledge receipt of that offer via email to the Offeror.
More opportunities from Department Of Defense → W4LD USA Hecsa
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS