Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Florida was posted on July 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Furniture, Fixtures, and Equipment (FF&E) Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

University of FloridaView Agency

NAICS

452319 - All Other General Merchandise StoresView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of ITN-13294.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

University of Florida, Lastinger Center For Learning

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUniversity of Florida
ContactsNo contacts available
OfficeN/A
Organization / Agency
University of Florida
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and delivery of office furniture, studio equipment, kitchen appliances, and signage for the leased space.

More opportunities from University of Florida

Same awarding agency

NAICS: 238220
SLED
Replacement of the Rabon Plant Cooling Towers 4 and 5
Solicitation # FY27-ITN-001
The University of Florida seeks to replace Cooling Towers 4 and 5 at the Lacy C. Rabon Chilled Water Plant, which serve as the primary cooling systems for Chillers 4 and 5. These towers, originally rebuilt in 2013, have reached the end of their serviceable life and must be replaced with new structures that fit within the existing 40ft x 50ft basin footprint while maintaining independent operation of the two cells. The contractor is responsible for demolition, debris removal, and full installation of new components including metal fan blades, fill, drift eliminators, gearboxes, vibration and oil level switches, motor space heaters, pole lights, and a lube oil system with external access points. All work must adhere strictly to UF Design & Construction standards and applicable codes. Electrical work is excluded from the contractor's scope and will be handled separately by UF-selected vendors. The contractor must submit engineered drawings, obtain all permits, implement lockout-tagout procedures, and coordinate with existing infrastructure, including a steel gangway connecting to Cooling Tower 1, which may require structural evaluation if it cannot be reused. A temporary cooling tower must be installed and maintained at the contractor's expense if completion is delayed beyond April 1, 2027, the absolute deadline required to avoid disruption to campus and UF Health operations. The project has a budget of $950,000 inclusive of all contingencies and is subject to a mandatory pre-bid site visit on July 17, 2026. Proposals must include evidence of performance on at least five similar projects within the past five years, proof of bonding capacity with a surety rated “A” or better, and detailed pricing with a list of spare parts as alternates. The contract will be awarded based on overall competitiveness, technical capability, and compliance—not simply lowest price—and the successful vendor must post performance and payment bonds in accordance with Florida Statute 255.05. Work must begin no earlier than November 1, 2026, and be completed within 120 days of Notice to Proceed, with final completion no later than April 1, 2027. The vendor must carry general liability insurance of at least $1 million, automobile liability of $100,000 per person and $500,000 per occurrence, and workers’ compensation as required by Florida law, with the University named as additional insured. All materials and
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 1 month ago

DEADLINE

in 6 days
View Details