Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on August 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fy 2024-25 Mcculloch/Jamaica Intersection Asphalt Re-Pavement Project

Closed
ITB-B25-PW-SM604C-500562-0-2025/SFState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
DIBBS
BINDER, LOAD
Solicitation # SPE8EF-27-T-0188
Solicitation SPE8EF-27-T-0188 is a request for quotations issued by DLA Troop Support, Construction and Equipment Manufacturing and Construction for the procurement of 61 units of Load Binders, identified by NSN 3990-01-554-6200 and Columbus McKinnon Corporation part number D060164. The requirement is designated as a total small business set-aside under FAR 19.5, with a response deadline of November 9, 2026. Delivery is required within 167 days after order, with a need ship date of April 26, 2027, and a final required delivery date of September 13, 2027. The items are to be delivered FOB Origin to DLA Distribution Red River in Texarkana, Texas, where both inspection and acceptance will take place. The contract mandates strict adherence to packaging and marking standards, requiring compliance with MIL-STD-129 and ASTM D3951, though DLA Master List technical and quality requirements take precedence. Palletization must follow RP001 guidelines. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Key regulatory clauses are incorporated, including DFARS 252.204-7012 for safeguarding covered defense information and various prohibitions regarding hazardous materials and covered telecommunications equipment. Offerors must maintain current certifications in the System for Award Management and provide safety data sheets where applicable to be considered responsible for award.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

about 21 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The project involves the removal and replacement of approximately 3,810 square yards of existing asphalt pavement at the intersection of McCulloch Blvd. and Jamaica Blvd. in Lake Havasu City, Arizona. The scope includes removing the current asphalt, preparing the subgrade, and installing a new 4-inch thick asphalt concrete pavement in two compacted lifts, following city specifications. Additionally, the work requires the lowering, adjustment, and reinstallation of seven water valve cans and collars, as well as two wastewater manhole rings and collars, which will be temporarily lowered and then raised to finish grade with concrete collars. The contractor is responsible for all related tasks such as hauling, disposal of debris, aggregate base addition and compaction, traffic control, and ensuring proper curing and protection of the new pavement and structures. The project must be scheduled within a 90-day window, with work anticipated to commence in October 2024, and any unacceptable asphalt work will need to be corrected at the contractor’s expense. The contract emphasizes the importance of quality, adherence to specifications, and comprehensive project management, including insurance, supervision, and safety measures. The project budget is estimated between $150,000 and $300,000, with the solicitation posted by Lake Havasu City, Arizona.

General Info

Agency

Arizona → Lake Havasu City

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Lake Havasu City
ContactsNo contacts available
OfficeN/A
Organization / Agency
Arizona → Lake Havasu City
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project consists of the removal of approximately 3,810 Square Yards of 3”-3 ½” thick existing asphalt concrete pavement, subgrade preparation to allow for 4” thick Asphalt Concrete pavement, the removal, lowering and necessary adjustments of seven (7) concrete water valve cans and collars and two (2) concrete manhole rings and collars, the hauling and disposal of existing asphalt concrete pavement, concrete and all debris. Metal plates or other approved means shall be used on the lowered sewer manhole rings and water valve cans. Aggregate base shall be added and compacted as needed to allow for the installation of the Asphalt Concrete pavement intersection repave. The supply, hauling, installation and compaction of approximately 3,810 square yards in two compacted 2” thick lifts to achieve a 4” thick Asphalt Concrete pavement repave at McCulloch Blvd. and Jamaica Blvd. intersection per Lake Havasu City Specifications. After the final paving is completed, seven (7) water valve cans and two (2) wastewater manhole rings will be raised to finish grade and have concrete collars installed, finished and protected from traffic until cured. All concrete for collars will be considered incidental to the project. The contractor will be responsible for scheduling this project with the City Representative in a time frame not to exceed 90 calendar days. Work will include the contractor supplying, hauling and installation of Asphalt Concrete Pavement; Concrete; labor; supervision; traffic control plan; traffic control; other related materials; mobilization; demobilization; tools and equipment; insurance and Workers' Compensation as required for saw cutting, grading, compaction of base material and replacement of the asphalt concrete pavement as specified in this ITB.
Any asphalt work that is deemed unacceptable by the City Representative shall be removed and replaced at the contractors’ expense. It is anticipated that this work will begin October in 2024.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS