Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

FY 2026-2027 Annual Major Roads Rehabilitation Program - Sycamore Drive (Cochran Street to 118 Freeway and Avenida Simi to Sharp Road), SV 27-10

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Simi Valley is implementing the FY 2026-2027 Annual Major Roads Rehabilitation Program, specifically project SV 27-10, which focuses on maintenance work along Sycamore Drive. The scope of work covers two primary sections: from Cochran Street to the 118 Freeway and from Avenida Simi to Sharp Road. All activities will be performed within the existing city right-of-way in Ventura County, California. The project entails comprehensive road improvements including resurfacing, traffic striping, and the installation of new sidewalks and curb ramps. Additionally, the contract requires the replacement of existing traffic loops, water valve boxes, and sewer manhole rings and covers. This project is classified under NAICS code 237310 and is designated as a Categorical Exemption under CEQA Section 15301(c), Class 1, as it involves the maintenance of existing road facilities without expanding their use. Ashique Khandaker, Senior Engineer, serves as the primary point of contact for this effort.

General Info

Simi Valley road rehabilitation on Sycamore Drive including resurfacing, sidewalks, and infrastructure upgrades.

Agency

California → City of Simi Valley

Place of Performance

Sycamore Dr And Cochran St, Sycamore Dr and Avenida Simi, and Sycamore Dr and Sharp Rd, Simi Valley, CA, 93065

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Simi Valley
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Simi Valley
Office AddressN/A
Contacts
Ashique KhandakerSenior Engineer

Full Description

Show more
The project includes maintenance work to the road section along Sycamore Drive between Cochran Street to 118 Freeway and Avenida Simi to Sharp Road within the existing City right-of-way including resurfacing of the road, replacement of existing traffic loops, replacement of water valve box, replacement of sewer manhole ring and cover, curb ramp, sidewalk and traffic striping.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including SWPPP and quality control. Material needs include ready mix supply, precast concrete, and steel casing. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a multi-modal path, walking trails, a playground, fitness pods, and extensive landscaping. Key deliverables include a 12-foot main multi-modal path, a 6-foot secondary walking trail, and various paving installations using concrete, stabilized decomposed granite, and PIP rubber. The scope also encompasses site work, electrical installations for pedestrian and street lighting, and adherence to a Final Water Quality Management Plan and Storm Water Pollution Prevention Plan. The engineer's estimate for the project is $11,100,000, with a performance period of 190 contract days. Bidders must hold a Class A contractor's license and provide a California Department of Industrial Relations Registration number. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 pm, with the critical requirement that a hard copy original of the bid bond be delivered to the City Clerk by the same deadline to avoid being deemed non-responsive. The contract will be awarded to the apparent low bidder. Contractual obligations include providing payment, faithful performance, and guaranty bonds, as well as maintaining workers' compensation insurance and complying with California Labor Code prevailing wage requirements. Payment will be issued through monthly progress payments at 95% of the work value, with the final 5% retained until 60 days after the recordation of the Notice of Completion and the submission of as-built plans. Liquidated damages for delays are set at $8,800 per calendar day. All work must conform to 2008 ADA Standards for Accessibility and Cal-OSHA safety requirements.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS