Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on September 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY24 - Engineering Service for NRCS EWP Grant - 444 VT Rt 155

Closed
FY24-05State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Town of Mount Holly has secured a USDA NRCS Emergency Watershed Protection (EWP) grant to address significant streambank erosion along the property at 444 VT Route 155, which was exacerbated during the July 2023 storm, putting a nearby home at risk. To implement the necessary reinforcement measures, the town is seeking proposals from qualified engineering firms to develop detailed design plans that comply with applicable state and federal standards, including the ANR Rivers and Streams Standards. The scope of work involves preparing construction drawings and specifications, a NRCS Quality Assurance Plan, and providing construction inspection and final inspection services. These drawings and plans will be reviewed by NRCS before the town proceeds with issuing a Request for Proposals (RFP) for construction services, which the town will administer. The project is part of a solicitation titled "FY24 - Engineering Service for NRCS EWP Grant - 444 VT Rt 155," with a response deadline of September 24, 2024. The contract value is estimated between $50,000 and $150,000, and the project falls under NAICS code 541330 for Engineering Services. Interested firms can contact Caitlin Boyle via email or phone for further details. The project location, scope of work, and relevant manuals are provided in attached documents, including a map and the Vermont Rivers and Roads Field Manual, to guide the design and implementation process.

General Info

Agency

Vermont → Town of Mount Holly

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Town of Mount Holly
Contacts1 person available
OfficeN/A
Organization / Agency
Vermont → Town of Mount Holly
Office AddressN/A

Full Description

Show more
The Town of Mount Holly has obtained a USDA NRCS EWP grant for reinforcement of streambank located on the property of 444 VT Route 155. Streambank was significantly eroded during the July 2023 Storm and the home near the stream is endangered. The Town of Mount Holly is seeking proposals from qualified professional engineering firms to design reinforcement per application state and federal standards including but not limited to ANR Rivers and Streams Standards. Deliverables include construction drawings and specifications, NRCS Quality Assurance Plan (QAP), construction inspection, and final inspection. Drawings and specifications will be reviewed by NRCS prior to issuance of RFP for construction. For purposes of the RFP the Town will administer the RFP for construction services. See attached map for location of proposed work. See attached for Grant Scope of Work. Also attached for reference are applicable pages from Vermont Rivers and Roads Field Manual.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS