Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on March 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY25 Airfield Striping & Rubber Removal | Dover AFB, DE

Closed
FA449725R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 2 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-BID-007
Solicitation # 2026-BID-007
The Police Parking Improvements Project (2026-BID-007) for the City of Moraine, Ohio, involves expanding the parking lot and implementing other site enhancements at the Moraine Municipal Building located at 4200 Dryden Road. The base bid focuses on asphalt and concrete work to expand the parking lot where the existing canopy is located, with an engineer's estimate of $206,000. Additional optional improvements include a wrought iron fence with motorized gates (Alternate 1: $158,500), a dumpster pad and parking relocation (Alternate 2: $21,500), and utility conduits with parking lot lighting (Alternate 3: $54,900). The project is scheduled for a December 10, 2026 award date, with a final completion deadline of June 30, 2027. The contract will be awarded to the bidder offering the lowest and best proposal, based on price, technical compliance, and demonstrated competency via an experience statement. Bidders must submit all proposals electronically via Bid Express by October 22, 2026, including required affidavits, a bid guaranty, and a contract bond. This is a prevailing wage project requiring compliance with Ohio Department of Industrial Relations standards and ADA guidelines for sidewalks and ramps. Work must adhere to ODOT standards for asphalt concrete and ASTM D 1577 for fibers. The contractor is responsible for providing proof of insurance within ten days of the award and must furnish a maintenance bond upon project acceptance.
City of Moraine, OH

POSTED

about 13 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-0016
Solicitation # 2024-0022
The City of Centerville, Ohio, is soliciting bids for the Forest Brook Ditch Repairs project, with an engineer's estimate of 194,000 dollars funded by local sources. The scope of work involves pavement and joint maintenance, including the cleaning and sealing of longitudinal and transverse joints and miscellaneous cracks using Type II hot-applied fiberized joint and crack sealant. Additionally, the project requires the installation of Stress Absorbing Membrane Interlayer (SAMI) and concrete pavement repairs across locations including Ambridge Road, Forest Brook Avenue, and Green Road. The work is specifically focused on the open channel ditch from Clyo Road to the culvert pipe crossing under Forest Brook Boulevard. The project must be completed by October 31, 2027. Bids are due by October 29, 2026, at 3:00 PM and must be submitted via Bid Express. The contract will be awarded to the lowest and best bidder based on pricing, qualifications, experience, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and ethics laws. Required submission documents include a bid form, contract affidavits, a bid bond, and a certificate of liability insurance. Payments will be issued monthly based on the value of work and materials certified by the City Engineer, in accordance with Chapter 153 of the Ohio Revised Code. Contractors are responsible for worker safety and must adhere to ADA compliance for mat installations and Best Management Practices to prevent sediment from entering the storm sewer system.
City of Centerville

POSTED

about 13 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Department of the Air Force, through the 436 Contracting Squadron at Dover Air Force Base (Dover AFB), Delaware, has issued a firm fixed-price solicitation for FY25 Airfield Striping and Rubber Removal services under solicitation number FA449725R0007. The contract requires a qualified contractor to provide all labor, materials, and equipment necessary to remove existing paint and rubber buildup from airfield surfaces and to repaint pavement markings across runways, taxiways, and aprons at Dover AFB. The scope includes removal of up to 12,000 square feet of deteriorated pavement markings, removal of 85% of rubber buildup over designated runway areas totaling approximately 2500 linear feet by 65 feet across three runway ends, and installation of new striping covering up to 290,000 square feet, comprising 225,000 square feet of reflective and 65,000 square feet of non-reflective markings. Reflective markings may use either Type I or Type III beads as proposed by the contractor. Work must be performed in two phases—spring and fall 2025—and in accordance with FAA, Air Force, and base-specific guidance, including adherence to strict quality control, safety protocols, and operational coordination to minimize airfield disruption. The contract is being awarded through a best value source selection process emphasizing technical/management approach and past performance over price, with past experience on large military or civil airfields involving rubber and striping removal highly weighted. Contractors must demonstrate capability and provide detailed methodologies and schedules for project execution. The period of performance is 365 calendar days beginning approximately April 11, 2025, with delivery and acceptance at Dover AFB. All work must conform to specified standards, including compliance with relevant ASTM test methods and inspection criteria under FAR clauses incorporated by reference. The contract includes detailed wage determinations ensuring compliance with federal labor standards and executive orders. Security and operational protocols require contractor personnel to complete background checks and follow strict OPSEC and antiterrorism measures on base. Proposal submissions are due by March 7, 2025, via email to the designated contracting officer points of contact, with proposals valid for 120 days. Payment is administered through Wide Area WorkFlow (WAWF), with contract administration contact points provided for technical and invoicing inquiries. The solicitation documentation includes comprehensive attachments such as the Statement of Work, airfield specifications, wage determinations, bid schedules, and evaluation criteria to guide offerors in preparation and submission.

General Info

Air Force solicits contractor for FY25 airfield striping, rubber removal, and repainting at Dover AFB.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Dover AFB, DE, 19902, USA

Set-Aside

NONE

Documents

11

Airfield and Heavy-Duty Pavements Specifications - Dover AFB

PDF, High priority: read this firstspecifications
High

Airfield Striping & Rubber Removal Drawings

PDF, High priority: read this firstspecifications
High

Evaluation Factors and Instructions for Award - Rubber Removal and Airfield Markings

PDF, High priority: read this firstrfp
High

FY25 Airfield Striping & Rubber Removal Bid Schedule

XLSX, High priority: read this first4 pages · bid-schedule
High

Solicitation FA449725R00070001 - FY25 Airfield Stripping and Rubber Removal Project

PDF, High priority: read this firstrfp
High

SOW Airfield Striping & Rubber Removal 2025 - Rev 1

PDF, High priority: read this firstsow
High

Wage Determination DE20250004 - Highway Construction (Delaware)

PDF, High priority: read this firstwage-determination
High

DAFB Antiterrorism Awareness for Contractors Trifold

PDF, Low priority2 pages · other
Low

DAFB Antiterrorism Guide for Contractors (Apr 24)

PDF, Low prioritysupporting-document
Low

Dover AFB OPSEC Awareness Guide for Contractors

PDF, Low priorityspecial-notice
Low

FY25 Airfield Striping and Rubber Removal Q&A

PDF, Low priority5 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Mar 7, 2026 to Mar 10, 2025. The notice description changed.

Deadline changed

Response deadline changed from Mar 10, 2025 to Mar 7, 2026.

Notice updated

Response deadline changed from Mar 7, 2026 to Mar 21, 2025. The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4497 436 Cons Lgc
Contacts2 people available
OfficeDOVER AFB, DE, 19902-5016, USA
Office AddressDOVER AFB, DE, 19902-5016, USA

Full Description

Show more
AMENDMENT 001 Please review all attchements for updated information and new RFP Due date. The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below: Description of Service: The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following: 1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings. 2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property. Site Visit Information: A site visit is not necessary to refine this requirement. Proposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 21 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 120 calendar days. Government POCs: SSgt Mariah Thompson (302) 677-5104 mariah.thompson@us.af.mil SSgt Justin Bordalo (302) 677-3744 Justin.bordalo@us.af.mil

More opportunities from Department Of Defense → FA4497 436 Cons Lgc

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS