Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on March 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY25 IPNF South Zone Snow Plowing

Closed
1284LL25Q0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 7 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 4 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for pre-commercial thinning services across two units in the McAllister Creek logging area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, specifically Unit 313-040 (10.33 acres) and Unit 313-035 (13.44 acres). The scope of work requires the contractor to identify and maintain desirable crop trees by removing competing trees and shrubs, including brush and hardwoods within a four-foot radius of leave trees. Performance standards include strict stump height limits of less than five inches, a maximum slash height of 24 inches, and specific bucking requirements for Ponderosa pine cut between January 1st and July 31st. Bids must be submitted in a sealed envelope labeled McAllister Creek PCT 2027 by 4:00pm on November 17, 2026. A complete bid package must include a bid sheet, bid evaluation form, contractor's work plan, TERO compliance and utilization form, and a certification regarding debarment, suspension, and responsibility. Payment is based on a bid price per acre for accepted acreage, with 20 percent of each payment held back until final acceptance. Contractors must provide proof of liability insurance and adhere to TERO Title X compliance and TOSHA safety regulations. The project is aligned with the FY2026 period from October 1, 2026, to September 30, 2027, and maintains an Indian preference policy for all products and supplies.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Non-Federal Lands
Solicitation # USDA-FS-2026-LSR
The Forest Service is offering the Landscape Scale Restoration (LSR) Grant Program for Non-Federal Lands under solicitation USDA-FS-2026-LSR to support collaborative, science-based restoration of priority forest landscapes. The program focuses on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality and watershed function, and mitigating invasive plants, insects, and disease. Eligible projects must be conducted on rural non-industrial private forest land or rural state and local government forest land, where rural is defined as areas outside Census places with more than 50,000 people. All applications, except those from federally recognized Tribes and Tribal organizations, require sponsorship from the relevant State Forester. Funding is provided through a competitive process with a total program funding of 11,340,000 dollars and an expected 30 awards. Individual awards range from a minimum of 100,000 dollars to a maximum of 300,000 dollars for single-state projects and 600,000 dollars for multi-state projects. A 1:1 non-federal cost share match is required. The period of performance is three years, with a possible two-year extension, not to exceed five years in total. Applicants must be registered in SAM.gov and provide a Unique Entity Identifier. Awards are determined by a ranked project list based on a 100-point scoring system, evaluating factors such as goals and objectives, integration with State Forest Action Plans, cross-boundary collaboration, and sustainability of outcomes. Before awarding funds, the Forest Service conducts a risk assessment based on financial stability and performance history, requiring the submission of a Financial Capability Questionnaire. Applications must be submitted via Grants.gov by January 26, 2027.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 115310
New
International
PL28TEM666 - Spring Tree Planting - 100 Mile House TSA
Solicitation # PL28TEM666
Solicitation PL28TEM666 is issued by the BC Timber Sales Branch of the Province of British Columbia for spring tree planting services within the 100 Mile House TSA. The contractor is responsible for providing all labor, materials, tools, and equipment to plant up to an estimated maximum of 2,821,016 units. The contract is awarded to the lowest priced compliant tender, with a verification process to ensure mathematical accuracy of the total bid price and a random draw to resolve any ties. Compliance requires bidders to provide two references from the last four years verifying experience in mixed species planting and to maintain SAFE company certification. A valid Tax Verification Letter is required for contracts valued at or above 100,000 CAD. The contractor must adhere to a strict Environmental Management System, which includes maintaining an Environmental Emergency Response Plan, following the BCTS training matrix, and notifying the Ministry Representative of supervising personnel before starting work. Performance is monitored through the Ministry of Forests Planting Quality Inspection System, with a minimum acceptable quality standard of 85 percent. Any contiguous area larger than one tenth of a hectare falling below this threshold may be declared unsatisfactory and subject to remediation or re-work. Payment is processed via written statements of account with a typical turnaround of 30 to 60 days, though the Province will retain a 10 percent holdback for 40 calendar days following the completion or termination of services.
BC Timber Sales Branch

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves providing snow removal and road clearance services within the St. Joe Ranger District of the Idaho Panhandle National Forest, covering approximately 60 miles of forest roads. The contractor is responsible for removing snow, fallen trees, debris, and obstructions, ensuring the roads are safe and accessible. Tasks include plowing a single vehicle path, creating water runoff holes, clearing turnouts, and maintaining drainage structures, with particular attention to preventing road damage and environmental impacts. The contractor must also secure necessary permits for hauling over bridges, adhere to pollution and erosion control measures, and implement traffic safety measures such as barricades, warning signs, and lights, all in compliance with federal standards like the MUTCD. Safety protocols aligned with OSHA regulations are mandatory, including providing protective equipment and maintaining a health and safety plan. The solicitation emphasizes the importance of experience, technical capability, past performance, and cost in the selection process. Contractors must submit detailed proposals, including technical and price components, and complete required certifications through the System for Award Management. The contract is set aside for small businesses under the SBA, with a response deadline of April 1, 2025. The project is managed by the USDA Forest Service, with specific contact details provided for inquiries. The overall goal is to ensure efficient, environmentally responsible snow removal that maintains road safety and accessibility within the designated forest area.

General Info

NAICS

115310 - Support Activities for Forestry

Place of Performance

Saint Maries, ID, 83861, USA

Set-Aside

SBA

Documents

1

Solicitation 1284LL25Q0016: FY25 IPNF South Zone Snow Plowing

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 1 Usda-Fs
Contacts1 person available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA

Full Description

Show more
1.0 Background and Purpose Clear the roads of snow, trees, brush and any other obstructions for approximately 60 miles located within the St. Joe Ranger District in the IPNF. 2.0 Definitions IPNF - Idaho Panhandle National Forest COR - Contracting Officer Representative - The Government representative on site who will ensure that the Government's technical objectives are met. To this end, the COR will provide necessary information, direction, coordination, monitor, and recommend necessary actions to the CO within the contractual work description. CO - Contracting Officer - The Government official with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. Only the CO has authority regarding time, money, or changes to the contract. Contractor Requirements 3.0 Technical Requirements / Tasks 3.1 Remove all snow, debris, and fallen trees on the roads highlighted in the schedule of items. At intervals of approximately 500 ft, or when necessary, the contractor shall push holes on the downhill side, extending beyond the road edge, to allow for water melt off to escape the road surface. Plow a single vehicle path as outlined on each of the three (3) provided maps. Where opportunities for turn outs and turn around areas present themselves, they are to be plowed out. Removal of snow slides, earth slides, fallen timber, and boulders that obstruct normal road surface width. There may be closed gates along the plowing route. These gates will be marked and unlocked by the Government official. The contractor will expose and open the gates along the plow routes and continue to the end of plowing as indicated on the provided maps. Clear areas for vehicle traffic to pass, park, and/or turn around. Removal of material. All debris, except snow and ice, which is removed from the road surface and ditches, shall be deposited away from stream channels at agreed locations. During snow removal operations, banks shall not be undercut nor shall gravel or other selected surfacing material be bladed off the roadway surface. Ditches and culverts shall be kept functional during and following roadway use. Snow berms shall not be left on the road surface. Berms left on the shoulder of the road shall be removed and/or drainage holes shall be opened and maintained. Dozers/front end loaders shall not be used to plow snow on forest roads without prior written approval of the Forest Service. Damage to roads, drainage structures or signs from, or as a result of contractor's snow removal operations, shall be restored or replaced in a timely manner. Any damage shall be reported immediately to the COR. 3.2 Permitting for Hauling over Bridges on NFS roads Submit gross weight of haul vehicle plus heavy equipment, as well as trainer configuration / number of axles for bridge permitting. Bridge overload permits are required for any vehicle which exceeds the maximum allowable gross vehicle weight of 80,000 pounds; if axle weight limitations dictated by the Bridge Formula result in a lower gross vehicle weight; if single axle loads exceed 20,000 pounds or tandem axle loads exceed 34,000 pounds; if the vehicle exceeds the posted load limits for the bridge. The Bridge Formula can be found in Forest Service Handbook 7709.56b - TRANSPORTATION STURCTURES HANDBOOK, CHAPTER 90 - ROAD BRIDGE OPERATION.92 - BRIDGE MANAGEMENT. 3.3 Pollution and Erosion Control During all operations under this contract, the Contractor shall exercise reasonable measures to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored and collected in a sanitary manner and disposed of in a State-approved sanitary landfill. 3.4 Maintenance of Traffic and Use of Warning Devices The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Project roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. All signs and devices remain the property and responsibility of the Contractor. Work shall not be started until all the required signs are in place. The Contractor shall erect warning signs to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform to the most recent edition of the Manual of Uniform Traffic Control Devices (MUTCD). Immediately replace any device that is lost, stolen, destroyed, or inoperative. Remove all temporary traffic control devices upon contract completion or when approved. Devices Required signs can be mounted on portable or temporary mountings. Traffic approaching the work area from either direction or side approaches shall be warned by signing. Equipment Vehicles and machinery not directly used in the maintenance operation shall be parked off the traveled way to minimize interference with the normal use of the road. 3.5 Safety Contractors shall comply with OSHA regulations and provide employees a work environment that is sanitary and not hazardous, which includes providing personal protective equipment. Contractors must maintain a health and safety plan and an accident prevention program, which includes frequent and regular inspections of the project site, materials and equipment. Contractors are responsible for risk management regarding contractor/employee and public safety, which include experience of operator to handle road and terrain conditions, getting to the worksite, traffic control and coordination with other users. Addenda to Provision 52.212-1 paragraph (b) Submission of Offers: Offerors must have an active entity registration in the System for Award Management in order to submit an offer. https://www.sam.gov/SAM/ Offers submitted in response to this solicitation shall include a technical proposal, a price proposal, and contractor representations and certifications. Technical Proposal - The technical proposal shall address the evaluation factors in 52.212-2. At a minimum, the technical proposal shall include: Experience Questionnaire - attached to this solicitation will be an experience questionnaire. When filling it out, answer the questions based on the requirement or service needed, such as snowplowing and road clearing services. Technical Capability - Provide a narrative on what the capabilities are for your company and how those capabilities will satisfy the requirement. Provide a delivery timeline of when you can start, and when the work will be completed. Past Performance - The government may use past performance information from any available source. If a company does not have past performance information available, information may be provided for predecessor companies, key personnel, or subcontractors. If there is no past performance information available, the offeror will receive a neutral rating in this factor. Price Proposal - Fill out the schedule of items located on the second page of the combined solicitation synopsis. Representations and Certifications - Fill in the check boxes for provisions 52.204-24, 52.204-29, 52.212-3, and include a copy with your offer. Submit documentation by emailing to contact@example.gov so that it is delivered into this inbox by the due date and time. Emails shall contain 3 separate attachments (Technical Proposal, Price Proposal, and Representations and Certifications) in Microsoft Word, Excel, or Adobe PDF format. Address questions about this solicitation to Shawn Trout at contact@example.gov by March 28th, 2025; any questions asked after that time may not be answered. All quotes and documentation for this solicitation will be due on April 1st, 2025, by 3:00PM EST. Addenda to Provision 52.212-1 paragraph (f) Late submissions: Replace (f)(2)(i) with the following: Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made and the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition. Delete 52.212-(f)(2)(i) paragraphs A, B, C. 52.212-2 Evaluation - Commercial Products and Commercial Services (NOV 2021) (a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Technical proposal, price, delivery timeline, and past performance (End of provision) Please see attached combined solicitation / synopsis for full details.

More opportunities from Department Of Agriculture → Csa Intermountain 1 Usda-Fs

Same awarding agency

NAICS: 332999
New
Federal
Aluminum Boundary Post Markers, Region One
Solicitation # 1284LL27Q0006
Solicitation 1284LL27Q0006 is a combined synopsis and request for quotation issued by the USDA Forest Service for the procurement of aluminum boundary post markers for Region One. This acquisition is a total small business set-aside under NAICS code 332999, with a size standard of 750 employees. The contract requires delivery to three specific locations: 50 percent to the Idaho Panhandle National Forests in Coeur d'Alene, 25 percent to the Lolo National Forest in Missoula, and 25 percent to the Flathead National Forest in Hungry Horse. Contractors must be aware that there are no loading docks or forklifts available at these delivery sites, and deliveries are prohibited on federal holidays. Award will be based on the best value to the government, evaluating price, product acceptability via a required product sheet, the proposed delivery schedule, and relevant past performance from the last three years. To be considered responsive, offerors must provide pricing for all items and an anticipated delivery date. Invoicing must be processed through the Department of Treasury's Invoice Processing Platform. The solicitation incorporates various FAR clauses, including those regarding commercial products, small business set-asides, and prohibitions on inverted domestic corporations. Quotations are due by November 10, 2026, at 4:30 PM.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS