Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fy26-27 Water Meter Changeout Services (Residential/Light Commerical)

Closed
PE-77050-NONST-2026-000000093State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Cobb County is soliciting bids for the annual replacement of up to 30,000 residential and light commercial water meters in sizes ranging from 5/8-inch to 3-inch over the fiscal years 2026-2027. The project involves the complete changeout of existing meters and requires full compliance with all technical and logistical specifications outlined in the bid documents, which will be available on OpenGov starting June 26, 2026. Bidders must submit proposals by the deadline of July 23, 2026, at 5:00 PM, and all submissions must adhere to the requirements detailed in the solicitation, identified by the number PE-77050-NONST-2026-000000093. The contract is issued under a state and local government procurement process with no specific small business set-aside designation. The primary point of contact for inquiries is Darrell McCook, reachable via email at [email hidden], and all related information can be accessed through the Georgia Procurement Registry portal. Work must be performed within Cobb County, Georgia, and contractors are expected to maintain all applicable standards for installation, recordkeeping, and customer notification throughout the project lifecycle.

General Info

Cobb County seeks bids for replacing up to 30,000 water meters 2026-2027, deadline July 23, 2026, PE-77050-NONST-2026-000000093.

Documents

1

FY26-FY27 Water Meter Changeout Services Bid Document MC2026

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Cobb County
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → Cobb County
Office AddressN/A
Contacts

Full Description

Show more
The Project consists of the changeout (replacement) of up to 30,000 (annually) 5/8-inch, ¾-inch, 1 ½-inch to 2-inch, and 3-inch residential and light commercial water meters. All Bid Documents AVAILABLE on OpenGov - https://procurement.opengov.com/portal/cobbcoga on Friday, June, 26, 2026.

More opportunities from Georgia → Cobb County

Same awarding agency

NAICS: 541330
SLED
Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1
Solicitation # B2464
Cobb County Department of Transportation is soliciting Statement of Qualifications for solicitation B2464 to obtain engineering design consultant services for the Factory Shoals Pedestrian Bridge project. The scope of work involves creating a dedicated pedestrian and bicyclist connection over I-20 via Factory Shoals Road, featuring a 12-foot shared use path with 2-foot barriers extending from the Hartman Road intersection to the Riverside Parkway intersection. Comprehensive services include concept development, public involvement, field surveys, environmental documentation, preliminary and final construction plans, roadway hydraulic and hydrological studies, signing and marking plans, right-of-way plans, and erosion control plans. All work must adhere to AASHTO guidelines and Cobb DOT Pre-Construction Process and Procedures Manual standards. The selection process is conducted in two phases, with the final award granted to the highest ranked firm based on combined scores. Phase I evaluates the Statement of Qualifications based on project manager and team leader experience, GDOT process familiarity, firm experience with similar projects, workload capacity, and the ability to meet the project schedule. Shortlisted firms proceed to Phase II, which focuses on unique technical approaches, challenge mitigation strategies, quality control procedures, and past performance ratings. Applicants must be prequalified in the required Area Class and provide notarized certifications, including the Georgia Security and Immigration Compliance Act Affidavit. The submission deadline for Phase I is November 12, 2026, at 5:00 PM, and all proposals must be submitted as a single PDF via the OpenGov eProcurement portal. The agency anticipates a multi-phase, project-specific contract with compensation potentially structured as a lump sum, cost plus fixed fee, cost per unit of work, or a specific rate of compensation. Final terms and fees will be negotiated with the top-ranked firm. Additionally, firms must maintain an accounting system meeting 48 CFR Part 31 standards, and those with aggregate contracts exceeding 250,000 dollars must provide a yearly CPA overhead audit.
Engineering Services

POSTED

13 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS