FY26/27 Waterline R&R Lindsay Street Phase 1 (C275152)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Jurupa Valley, through the Jurupa Community Services District, is undertaking a waterline replacement project on Lindsay Street to address chronic leaks and aging infrastructure. The project will replace approximately 2,560 feet of outdated 2-inch and 6-inch waterlines with new 8-inch diameter piping, aligning with the District’s minimum standard for system upgrades. This improvement will enhance hydraulic efficiency, reduce maintenance demands, and eliminate recurring service interruptions for residential customers. Work will include trenching, backfilling, compaction, and the replacement of associated components such as water meter boxes, fire hydrants, air valves, and system connections, all while ensuring the protection of existing above- and below-grade utilities. Following installation, all disturbed surfaces—including pavements, lawns, and parkways—will be fully restored to their original condition. The project is scheduled under the fiscal years 2026/2027 and is identified as Phase 1 of the broader Lindsay Street waterline replacement initiative. The Engineering Manager, Eddie Rhee, serves as the primary point of contact for inquiries, and the work is located within Jurupa Valley, California, with a zip code of 92509. The initiative is designed to deliver long-term reliability and improved water service to the community’s residents.
General Info
Agency
NAICS
Place of Performance
Lindsay St between Ben Nevis Blvd. and Mission Blvd., Jurupa Valley, CA, 92509Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
