FY26-DDOT-IPMA-MLK Phase 2 - from South Capitol St to 4th St
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The FY26-DDOT-IPMA-MLK Phase 2 project is a comprehensive construction management initiative managed by the District of Columbia Department of Transportation. The scope of work focuses on corridor improvements from South Capitol Street to 4th Street, encompassing extensive roadway resurfacing, pavement work, and the reconstruction of sidewalks and curbs. Key infrastructure upgrades include the installation of new traffic signals, modification of existing signals, the construction of ADA-compliant ramps, and the upgrading of streetlighting and communication conduits. In addition to transportation infrastructure, the project integrates significant utility and environmental enhancements. This includes the replacement of water mains in coordination with DC Water, the repair of catch basins, and the implementation of green infrastructure and improved drainage systems. The project further aims to enhance the urban environment through updated signage, pavement markings, landscaping, and the installation of new street furniture to improve the overall streetscape.
General Info
Agency
Place of Performance
DC, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
