Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

FY26-DDOT-IPMA-MLK Phase 2 - from South Capitol St to 4th St

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The FY26-DDOT-IPMA-MLK Phase 2 project is a comprehensive infrastructure initiative managed by the District of Columbia Department of Transportation. The scope of work focuses on the corridor from South Capitol Street to 4th Street and encompasses extensive roadway and pavement improvements, including resurfacing, drainage upgrades, and the repair of catch basins. The project emphasizes safety and accessibility through the reconstruction of sidewalks and curbs, the installation of ADA-compliant ramps, and the enhancement of signage and pavement markings. In addition to roadway work, the contract includes significant electrical and utility upgrades, such as the installation of new traffic signals, modification of existing signals, and the upgrading of streetlighting and communication conduits. The project also integrates green infrastructure, streetscape enhancements, landscaping, and the installation of street furniture to improve the overall urban environment. Furthermore, the scope involves critical utility coordination with DC Water for the replacement of water mains along the designated corridor.

General Info

DDOT infrastructure project for MLK Phase 2 featuring roadway, utility, and accessibility upgrades.

Agency

District of Columbia → Transportation (DDOT)

Place of Performance

DC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → Transportation (DDOT)
ContactsNo contacts available
OfficeDC
Organization / Agency
District of Columbia → Transportation (DDOT)
Office AddressDC
ContactsNo contact information available

Full Description

Show more
EOR Construction - roadway, pavement, drainage, green infrastructure, streetlighting, signals, pavement, New Traffic Signal and Existing Traffic Signal Modification Sidewalk and Curb Reconstruction Improving Signage and Pavement Markings Enhancing Streetscape and Landscaping Roadway Resurfacing Constructing ADA Ramps Upgrading Existing Streetlights and Traffic Signals Installation of Communication Conduit Repairing Catch Basins Furnishing and Installation of Street Furniture Other Corridor Improvements DC Water - Water Main Replacement

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and utility construction services, including underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, shoring, and subsurface investigation. Additional requirements include asphalt paving, traffic signals, lighting, landscaping, and the supply of ready mix and precast concrete. The solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, Kiewit emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system. Technical plans and specifications are available for review at Kiewit's office in Santa Fe Springs, California.
Kiewit Infrastructure West Co.

POSTED

14 minutes ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS