This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on April 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
FY26 G3 Aviation Solar Generator
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The National Training Center is seeking a comprehensive leasing service for a single commercial, portable solar generator to support continuous critical operations at Bicycle Lake Army Airfield, a remote off-grid site at Fort Irwin. This lease is for a turnkey power solution over a 12-month period, starting June 16, 2026, and ending June 15, 2027. The generator must provide a minimum of 10 kW continuous power and include an integrated propane-fueled secondary power source to ensure uninterrupted operation during low solar output or system failures. The equipment must be ruggedized to withstand harsh environmental conditions of the Mojave Desert, including extreme heat, sand, and wind. The contractor is fully responsible for delivery, installation, maintenance, repairs, and removal of the generator, as well as environmental and storage compliance. This contract is a total small business set-aside under the NAICS code 532490 and is managed by the Department of Defense office at Fort Irwin, California. The solicitation was posted on March 27, 2026, with responses due by April 13, 2026. The solution is critical to maintaining uninterrupted mission readiness in a location without permanent power infrastructure, and the contractor must guarantee maximum uptime throughout the lease term. The point of contact for the contract is Franklin Brown, reachable via phone or email.
General Info
Contract Value
$23,700Place of Performance
Bicycle Lake Army Airfield (BLAAF), Building 6212, CA, 92310Set-Aside
Awardee
DYNAMIK, INC.Award Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
***1 April 2026, ammended to allow for monthly invoicing***
The National Training Center (NTC) requires a comprehensive leasing service for one commercial, portable solar generator to support sustained, critical operational requirements at Bicycle Lake Army Airfield (BLAAF), a remote, off-grid location at Fort Irwin. The service is not for a product purchase but for a turn-key power solution, ensuring a reliable, stand-alone power source for a 12-month period. This requirement is driven by the need for uninterrupted mission readiness in an environment lacking permanent power infrastructure.The generator lease must meet specific performance and durability requirements essential for success in the Mojave Desert. The leased unit must deliver a minimum continuous power output of 10kW and include an integrated propane-fueled secondary power source to guarantee 100% operational continuity. This redundancy is critical during periods of low solar generation, overnight missions, or any primary system failure. Furthermore, the equipment must be environmentally hardened and proven capable of long-term performance despite exposure to extreme heat, abrasive sand, and high winds. The contractor bears full responsibility for all maintenance, servicing, and repairs to ensure maximum uptime throughout the lease period. Without this reliable power source, critical operations at BLAAF would be jeopardized.The service is required for a 12-month period of performance, from 16 June 2026 to 15 June 2027. The contractor will be responsible for the timely delivery, installation, and subsequent removal of the generator from Fort Irwin, California. No unique environmental or storage requirements are levied on the government; all such considerations are the responsibility of the contractor.
1. Can offerors supply a gas or diesel generator as a back up to the solar portion, instead of the propane generator?
While other generator types may be technically feasible, propane is the preferred solution for this application. It is highly reliable for remote sites due to its indefinite fuel shelf life and minimal maintenance requirements. Propane's clean-burning nature and closed-system refueling process also eliminate the risks of fuel system degradation and environmental spills, which are concerns with gasoline and diesel.
2. How often does the current propane generator have to turn on and run as a back up?
According to the system's performance report for 2023, the backup generator recorded zero hours of runtime. The solar array and battery bank were sufficient to handle 100% of the load, even during periods of overcast weather. Generator use is exceedingly rare and would only be anticipated during prolonged periods (e.g., 3+ days) of extreme weather with no sun.
3. What is the running wattage of the load?
Our field observations show a consistent baseline load of approximately 120 Watts (1A at 120V). This does not include ancillary equipment like the heater or fan, which cycle on periodically.
4. What is the peak wattage of the load?
The peak wattage occurs when the unit's internal heater or lens-clearing fan activates.
More opportunities from Department Of Defense → W6QM Micc-Ft Irwin
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
