FY26 Lake Marion Cameron Reach Water Lines

Awarded
W912HP26RA003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The FY26 Lake Marion Cameron Reach Water Lines contract, awarded to Chandler Construction for 16,471,000.00 dollars, involves the installation and operation of approximately 65,000 linear feet of 12-inch diameter and 1,000 linear feet of 8-inch diameter water main pipe. The scope of work encompasses all necessary pipes, valves, roadway bores, horizontally directionally drilled pipe, backfill, compaction, and quality control testing required for successful operation. This project forms a part of the Lake Marion Regional Water System, with ownership and maintenance shared between Santee Cooper and Calhoun County. The contractor is tasked with coordinating all activities with local utility owners, property owners, Calhoun County, and personnel from the Lake Marion Water Treatment Plant. The contract was managed by the Department of Defense through the Endist Charleston office and officially posted on January 12, 2026.

General Info

Contract Value

$16,471,000

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

SC, 29403, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Charleston
Contacts1 person available
OfficeCHARLESTON, SC, 29403-5107, USA
Office AddressCHARLESTON, SC, 29403-5107, USA
Contacts

Full Description

Show more
THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025. This award was made to Chandler Construction in the amount of $16,471,000.00 and is hereby posted on 1.12.2026.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Defense → W074 Endist Charleston

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS