Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New Hampshire was posted on October 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY26 Stormwater Main Lining Project

Closed
BID #01-26-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract involves a comprehensive stormwater main rehabilitation project for the City of Keene in New Hampshire, with a total estimated value between 1.5 and 3 million dollars. The scope includes the cured-in-place pipe (CIPP) lining of approximately 360 linear feet of 18-inch, 1,300 linear feet of 24-inch, and 930 linear feet of 30-inch stormwater mains, complemented by the replacement of around 320 linear feet of 24-inch corrugated metal pipe with high-density polyethylene pipe. Additionally, a new 4-foot diameter pre-cast concrete drain manhole will be installed, with all stormwater mains undergoing pre- and post-inspection using certified CCTV assessments. The project also entails cementitious lining of drain manholes, selective demolition and reconstruction of chimneys, and bypassing stormwater flows as necessary to facilitate work. The contractor is responsible for restoring disturbed surfaces such as pavement, curbing, utilities, shrubbery, and signage, as well as shoring or guying utility poles impacted by the work. Existing utilities must be protected and promptly repaired if damaged, with all repairs to meet the satisfaction of the owner. The project includes testing of stormwater infrastructure components and correcting any failures or breaks identified during inspection. The contract emphasizes utility protection, proper reconstruction of affected structures, and adherence to inspection and testing standards, ensuring a thorough and coordinated approach to stormwater infrastructure improvement.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Hampshire → City of Keene
ContactsNo contacts available
OfficeN/A
Organization / AgencyNew Hampshire → City of Keene
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Can be found in the summary of work and detailed in the following points. 1. Cured-in-Place Pipe (CIPP) rehabilitation of approximately 360 linear feet (LF) of 18-inch, 1,300 LF of 24-inch, and 930 LF of 30-inch stormwater mains; 2. Replacement of approximately 320 LF of 24-inch corrugated metal pipe (CMP) stormwater main with 24-inch high-density polyethylene (HDPE) pipe; 3. Installation of a new 4-foot diameter pre-cast concrete drain manhole. 4. Pre and post CCTV inspection using NASSCO Pipeline Assessment Certification Program (PACP) of all stormwater mains requiring CIPP rehabilitation; 5. The cementitious lining of drain manholes and selective demolition of existing chimneys as required to perform pipelining activities, Contractor shall reconstruct chimney in kind following pipelining completion; 6. By-passing stormwater flows, as necessary, to accomplish the work listed above; 7. Replace and restore any disturbed pavement surfaces, curbing, utilities, shrubbery, grass, posts, signs, etc. along the line of work. Shore or guy any impacted utility poles as required by utility company. Replace any disturbed bounds utilizing the services of a registered land surveyor; 8. Protect existing utilities as necessary and immediately repair any damage caused to existing utilities to the satisfaction of the Owner; and 9. Perform testing of stormwater mains, drain manholes, and catch basins and correct all failure and/or breaks.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS