Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

FY27 SE Sikeston Office Window Replacement Project

Active
MODOT 0000000412SLState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Missouri Department of Transportation (MoDOT) is soliciting proposals for the FY27 SE Sikeston Office Window Replacement Project, which involves the removal and replacement of all exterior storefront window frames, glass, and sill flashings at the Southeast District Office in Sikeston. The project requires the installation of a complete watertight and functional system using materials equivalent to Tubelite T14000 thermal broke frames and solar bronze glass, with an optional alternate for Solarban 60 low-e glass. The contract period runs from the date of execution through June 14, 2027. Because the building will remain occupied during construction, the contractor must ensure that no office is displaced for more than one business day and that original interior trim casing is preserved. Proposals must be submitted electronically via MissouriBUYS by November 17, 2026, though hard copies are permitted if the buyer is notified five days in advance. A mandatory pre-proposal conference attendance is required for eligibility, and a proposal bond must be provided. Evaluation is based on the proposed fee (35 points), experience and reliability (30 points), method of performance (20 points), and key personnel expertise (15 points). Awardees must be registered in MissouriBUYS, maintain specific insurance coverages including 4 million dollars in general and automobile liability, and comply with Missouri state laws regarding worker eligibility and non-discrimination. All materials must be handled according to AAMA CW-10 standards, and the final installation must meet rigorous AAMA and ASTM quality and performance specifications.

General Info

MoDOT seeks proposals for window replacement at the Southeast District Office in Sikeston.

Place of Performance

MO, USA

Set-Aside

NONE

Documents

6

Missouri Annual Wage Order No. 33 - Scott and Adair Counties

PDF, High priority: read this firstwage-determination
High

MODOT 0000000412SL - FY27 SE Sikeston Office Window Replacement Project

PDF, High priority: read this first30 pages · rfp
High

Section 01300 Submittal Requirements and Section 01700 Contract Closeout

PDF, High priority: read this first5 pages · specifications
High

Tubelite E-T-TU14000 Storefront Guide Specification

DOCX, High priority: read this first8 pages · specifications
High

Tubelite T14000 Series Storefront Product Specifications

PDF, High priority: read this first2 pages · specifications
High

Sikeston Office Window Pictures

DOCX, Low priority7 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMissouri → MODOT TRANSPORTATION
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Logan WilbersBuyer

Full Description

Show more
This solicitation seeks proposals from qualified offerors to remove and replace all the exterior storefront window frames and glass in the Southeast District Office located in Sikeston. The contract period will be from the date of the fully executed agreement through June 14, 2027. Proposal bond is required, and all proposal bond documents are attached and must be mailed, upon request, to the buyer of record, Logan Wilbers, at 830 MoDOT Drive Jefferson City, MO 65109. MoDOT will receive proposals electronically through MissouriBUYS, by mail through USPS, UPS, or FEDEX. If an Offeror intends to submit a hard copy proposal, the buyer of record must be notified five (5) days before the solicitation closing date. MoDOT will not accept proposal responses by email. Pre-proposal attendance is mandatory for proposal to be accepted.

Similar Contracts

Same NAICS industry code

NAICS: 238150
New
SLED
A1418-02
Solicitation # A1418-02
Solicitation A1418-02 is a project for the New Jersey Division of Property Management and Construction to replace two pairs of glazed aluminum entrance doors and storefront frames at the NJN Building in Trenton, Mercer County. The scope includes the installation of an exterior set within the existing curtainwall and an interior set in a new vestibule wall, along with selective demolition of interior finishes, construction of a new gypsum board and metal stud partition to ensure a minimum 7-foot clear distance, painting, and flooring replacement. Electrical work involves disconnecting and reconnecting access control wiring and power supplies for the new hardware. The project must be completed within 120 calendar days from the Notice to Proceed. The contract is a lump sum all trades bid submitted via Bid Express, with the state reserving the right to award based on separate prime trade bids if the total is lower. Awardees must be DPMC classified, registered in the System for Award Management, and compliant with the Public Works Contractor Registration Act. Key requirements include a 100 percent performance bond, adherence to New Jersey Uniform Construction Code and ADA standards, and compliance with OSHA and silica safety programs. The contractor is responsible for obtaining FAA permits for crane operations and providing a one-year warranty on all materials and equipment. Payment is processed monthly through a detailed invoice packet submitted to the DPMC project representative.
New Jersey Division of Property Management and Construction

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 238150
New
SLED
Glass and Glazing Unit Price Portwide 2026
Solicitation # SW-0322954
Solicitation SW-0322954 is a unit-price contract for portwide glass and glazing services for the Port of Seattle, primarily supporting the Seattle-Tacoma International Airport. The scope of work includes providing all labor, materials, and equipment for the installation, repair, and maintenance of glass, glazing, skylights, window films, aluminum storefront assemblies, and Satellite Transportation System cars. These services may be applied to facility restorations, remodels, hazard mitigations, and new constructions. The contract has an estimated value not to exceed 350,000 dollars, excluding Washington State Sales Tax, with an initial term of one year and an option for a one-year extension. The contract will be awarded to the lowest responsible and responsive bidder based on a schedule of unit prices for forepersons, journey-level glaziers, and laborers across day, swing, and graveyard shifts, as well as mark-ups for materials, equipment, and subcontractors. Bids are due by October 27, 2026. Awardees must provide performance and payment bonds for the full contract sum, maintain required insurance, and adhere to Washington State prevailing wage laws. Administration is managed through specific Work Authorizations, with payments made via direct deposit within 30 days of invoice approval, subject to a 5 percent retainage. Contractors must also comply with strict waste management, hazardous material labeling, and federal nondiscrimination regulations.
Aviation Maintenance

POSTED

4 days ago

DEADLINE

in 11 days
View Details

More opportunities from Missouri → MODOT TRANSPORTATION

Same awarding agency

NAICS: 336120
New
SLED
MoDOT Statewide FY27 - Dump Truck 2028 Models - Multiple Award
Solicitation # MODOT 0000000406SL
The Missouri Department of Transportation (MoDOT) is seeking bids for a Multiple Award Blanket Purchase Agreement to procure 2028 model year dump trucks, specifically Single Axle, Tandem Axle, and Towplow configurations. The contract award period begins upon execution and continues through October 31, 2027. Bids must be submitted electronically via MissouriBUYS by October 21, 2026, though hard copies are permitted if the buyer is notified five days prior to closing. Evaluation is based on a point system where base and options costs account for 50 points, followed by unit features, dealer locations, delivery timelines, and past performance. Technical requirements are extensive, featuring detailed district-specific configuration packages and strict specifications for stainless steel dump bodies, electrical systems, and safety components such as three points of contact for ladders and unobstructed operator vision. Deliveries must be coordinated with a MoDOT representative at the receiving district between 8:00 A.M. and 3:00 P.M. on weekdays, with a minimum of 24 hours advance notice. Contractors must comply with the Buy American Act, which offers a ten percent preference for qualifying domestic products, and must certify compliance with anti-discrimination laws and drug-free workplace standards. Final acceptance of each vehicle is contingent upon a thorough inspection by a MoDOT representative to ensure compliance with all published specifications and the absence of shipping damage.
Heavy Duty Truck Manufacturing

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 323111
New
SLED
Missouri Aeronautical Chart - Cartographic Design, Layout, and Printing
Solicitation # MODOT 0000000397SL
Solicitation MODOT 0000000397SL is a request for proposals from the Missouri Department of Transportation for the cartographic design, layout, and printing of the 2027-2028 Missouri Aeronautical Charts. This is a comprehensive service contract rather than a print-only agreement, requiring the contractor to utilize the most recent FAA Sectional Charts to ensure the accuracy of aeronautical data, obstruction towers, and other critical flight planning information. The contract period runs from January 1, 2027, through December 31, 2029, with two optional one-year renewals. Proposals must be submitted electronically via the MissouriBUYS system by 2:00pm Central Time on November 16, 2026. The selected contractor must provide high-quality charts featuring specific folding requirements to a finished size of 5x11-1/2 inches, using a minimum four-color printing process on paper meeting U.S. Government printing office spec JCP O-91. Deliverables include blue-line and color proofs for approval within 10 business days of receiving materials, with final delivery expected 180 calendar days after a purchase order is issued. Strict packaging and palletization standards are mandated, including grouping charts in sets of 25 and limiting pallet height to 48 inches and weight to 1,600 pounds. Award decisions will be based on the best proposal, evaluated through a combination of objective analysis and subjective judgment. Evaluation criteria include cost (40 points), experience and reliability (30 points), method of performance (20 points), and the quality of printing samples (10 points). Offerors must submit a firm fixed price and complete several mandatory exhibits, including certifications regarding worker eligibility, the Anti-Discrimination Against Israel Act, and the Buy America Form for commodity purchases exceeding 25,000 dollars.
Commercial Printing (except Screen and Books)

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238170
New
SLED
FY27 SW Ozark Maintenance Building Metal Siding Replacement Project
Solicitation # MODOT 0000000420SL
The Missouri Department of Transportation (MoDOT) is soliciting bids for the FY27 SW Ozark Maintenance Building Metal Siding Replacement Project located in Christian County, Missouri. The scope of work involves the removal of existing exterior metal siding and the installation of new manufacturer standard 26-gauge prefinished metal siding. Additional project requirements include the replacement of pedestrian doors, LED fixtures, roof metal ventilation boots, gutters, and downspouts, as well as site grading to prevent water infiltration. Contractors must also provide a separate line item for roof system fall protection and a bid for approximately 2,440 square feet of additional wall insulation for wet areas. All work must be completed by May 18, 2027, and is subject to final acceptance rather than substantial completion. Bids are due by October 20, 2026, and must be submitted electronically via MissouriBUYS, though hard copies are permitted if the buyer is notified five business days in advance. A site visit is mandatory for bid acceptance. Awarding will be based on the lowest and best bid that complies with all mandatory specifications and Missouri statutes. Required submissions include a 5 percent bid security, certificates of insurance, and various compliance affidavits including E-Verify and Anti-Discrimination certifications. The successful contractor must provide a 100 percent performance and payment bond, adhere to OSHA safety standards, and pay prevailing wages according to Annual Wage Order No. 33 for Christian County. A one-year parts and labor warranty is required for all components.
Siding Contractors

POSTED

4 days ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS