FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OK

Active
W912BV279A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Tulsa District, is preparing a competition for the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma. This 304 million dollar consolidated capital program aims to modernize infrastructure to support the 97th Air Mobility Wing by replacing legacy KC-135 operations with next-generation KC-46A Pegasus tankers. The project includes the construction of a general maintenance hangar, a multipurpose hangar for corrosion control and fuel cell maintenance, and an expansion of the Flight Training Center to include high-bay simulator facilities and secure SCIF areas. Additional scope involves the relocation of the aircraft refueler parking area and the liquid oxygen plant, along with the demolition of three existing flight-line structures. The acquisition will utilize a Progressive Design-Build approach under Other Transaction Authority, featuring a two-step selection process consisting of a Statement of Qualifications and pitch presentations. The resulting agreement will be a Firm-Fixed-Price contract divided into a design and pre-construction phase followed by a final design and construction phase. A virtual Industry Day is scheduled for September 25, 2026, to provide further project details. Additionally, the project requires the design-builder and its subcontractors to implement cybersecurity practices equivalent to CMMC Level 1 for handling Federal Contract Information.

General Info

$304M Progressive Design-Build project for KC-46A infrastructure modernization at Altus Air Force Base.

Agency

Department Of Defense → Endist TulsaView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

0, OK, 73523, USA

Set-Aside

NONE

Documents

(3)

FY28 KC-46A Aircraft Beddown Infrastructure Program Requirements

DOCX3 pagessow

RFQ W912BV279A001 - Altus AFB KC-46A Aircraft Beddown Infrastructure

DOCX15 pagesrfq

KC-46A Aircraft Beddown Infrastructure Program RFQ

DOCXrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Endist Tulsa
Contacts2 people available
OfficeN/A
Organization / Agency
Department Of Defense → Endist Tulsa
View Agency Profile
Office AddressN/A

Full Description

Show more

The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this special notice to announce an upcoming competition for a design and construction solicitation for the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC §2808a Other Transaction Authority for Construction.  This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. 



I. INDUSTRY DAY 


Tulsa District intends to conduct a virtual Industry Day on Friday, September 25, 2026 at 11:00AM Central Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Progressive Design-Build (PDB) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the solicitation release. 


General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Program Solicitation. Official Questions and Answers (Q&A) will be accepted and addressed following the release of the Program Solicitation. 


The Industry Day Team’s meeting link will be posted as an update to this notice NLT close of business on Wednesday, 23 September 2026. Please be advised this meeting will be recorded.



II. PROJECT OVERVIEW 


  • Project Title: FY28 KC-46A Aircraft Beddown Infrastructure Program

  • Location: Altus Air Force Base, OK

  • NAICS Code:  236220


III. PROJECT DESCRIPTION 


The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the Department of the Air Force’s sole formal training unit for heavy mobility aircraft. This $304M consolidated capital program will  modernize the installation’s infrastructure to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for C-17 and legacy fleets.


The program delivers three primary facility complexes along with associated airfield civil site infrastructure:


Aircraft Maintenance Facilities


  • KC-46A Aircraft Maintenance Hangar (General Maintenance): A fully enclosed, single-bay aircraft general maintenance facility (Cat Code 211-111) engineered to support maintenance tasks and provide inclement weather protection for multi-craft fleets (KC-46A, KC-135, C-17, and C-137). Structural components include reinforced concrete foundations, a structural steel frame and standing seam metal roof system, insulated metal wall panels, and high-strength concrete floor slabs. Interior functional space integrates personnel support areas, flight chief/production supervisor offices, expediter offices, break rooms, locker/shower rooms, tool rooms, laser rooms, hazardous material (HAZMAT) storage, a dedicated hazardous waste collection system, and Consolidated Tool Kits (CTK) suites. Airfield site work includes heavy-duty concrete pavement, taxiway tie-ins, aircraft wash racks, exterior lighting, and utility distribution.
  • KC-46A Multipurpose Hangar (Corrosion Control & Open-Tank Fuel Cell Maintenance): A highly complex, fully enclosed single-bay hangar (Cat Code 211-159) engineered specifically to execute high-risk corrosion control operations (sanding, washing, aircraft depainting/painting) and open-tank fuel cell maintenance. Structural features include steel framing, insulated metal walls, and explosion-resistant construction. Functional spaces encompass paint storage and mix rooms, clean rooms, blast booths, sanding/filter storage, dedicated fuel tank repair and tool storage shops, breathing air systems, specialized industrial ventilation/exhaust systems, hazardous waste collection, and administrative personnel spaces.

Flight Crew Training & Simulator Facility


  • KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion): An expansion to the existing Flight Training Center (FTC) (Cat Code 171-212) designed to support classified training operations for KC-46A aircrews. The expansion adds dedicated high-bay simulator bays and support space to house:
    • High-bay Weapons System Trainers (WST) (full-motion flight simulators);
    • Boom Operator Trainers (BOT) and Part Task Trainers (PTT);
    • Integrated bridge and overhead servicing cranes for simulator maintenance and hydraulic/motion platform equipment removal;
    • Specialized mechanical, electrical, plumbing (MEP), and fire detection and suppression systems, including redundant, high-efficiency Computer Room Air Conditioning (CRAC) / precision HVAC systems for computer rooms, simulator visual systems, and motion equipment;
    • Dedicated classroom spaces, flight briefing/debriefing rooms, and administrative offices;
    • Secure areas designed, engineered, and constructed to strict Intelligence Community Directive (ICD) 705 Sensitive Compartmented Information Facility (SCIF) physical, acoustic, and tempest security standards;
    • Associated heavy-duty exterior pavements, access driveways, delivery bays, and personnel parking areas.
    • Associated utility hookups and extensions.

Enabling Civil Infrastructure & Demolition


  • Aircraft Refueler Vehicle Parking Area Relocation: Site preparation for the General Maintenance Hangar requires the complete relocation and replacement of an existing 68,620 SF aircraft refueler parking yard. Scope includes high-strength concrete paving, dedicated secondary containment, security fencing, lighting, and an integrated environmental stormwater control and oil-water filtration system.
  • Liquid Oxygen (LOX) Plant Relocation: Enabling work for the Multipurpose Hangar requires the decommissioning, demolition, and off-site reconstruction of the active base LOX facility. The replacement facility encompasses specialized oil-free/hydrocarbon-free concrete paving, cryogen storage pads, an overhead weather protection structure, security fencing, hazardous gas detection, and dedicated utility connections.
  • Demolition: Demolition of three aging flight-line structures (approx. 155 SM total) and existing asphalt/concrete parking areas to clear the building footprints.

All facilities will be designed and constructed as permanent construction in accordance with UFC 1-200-01 (DoD Building Code), UFC 4-010-01 (DoD Minimum Antiterrorism Standards for Buildings), and the installation's Architectural Compatibility Plan.



IV. ACQUISITION STRATEGY - PRE-AWARD 


 The USACE will use a streamlined competitive selection process:  


  • Step 1 – Statement of Qualifications: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in solicitation). The Government intends to down-select up to three Design-Build Teams to proceed to Step 2.  
  • Step 2  Pitch Presentations: Selected Design-Build Teams will participate in pitch meetings. One company will be selected as the Design-Build team for award of the initial design and preconstruction services with a modification for design completion and construction award.  


V. ACQUSITION STRATEGY – AWARD 


 The agreement will be awarded to the most qualified progressive design-build entity (PDBE) to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes design and pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds are available.   



VI. KEY SECURITY REQUIREMENTS 


The Department of War (DoW) has established the Cybersecurity Maturity Model Certification (CMMC) program, as codified in 32 CFR Part 170, to ensure that entities handling government information implement appropriate cybersecurity standards. As a matter of DoW policy, the principles of the CMMC program are applicable to the OT resulting from this Request for Qualifications. Performance under the resulting Agreement will require the handling of Federal Contract Information (FCI).


The Government anticipates this project will require the implementation of cybersecurity practices equivalent to CMMC Level 1. The CMMC Level 1 requirements apply to all information systems owned or operated by the Design-Builder (and its subcontractors) that will process, store, or transmit FCI in the performance of the OT.



NOTE: All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents are included in this special notice for feedback and informational purposes only and are subject to change upon issuance of the formal Request for Qualifications. 

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Federal
FY27 SPECIAL PROJECT USNH YOKOSUKA ALTERATION, JAPAN
Solicitation # N4008427R1027
This is a sources sought notice issued by the Naval Facilities Engineering Systems Command Far East for a major renovation project at U.S. Naval Hospital Yokosuka in Japan, with a projected scope valued between $100 million and $250 million. The notice is not a solicitation for proposals but a market research effort to identify qualified contractors capable of performing a Design-Bid-Build construction project involving three interrelated packages: Package A, the base electrical infrastructure work requiring 578 calendar days; Package B, alterations to Buildings 1400 and 1407 at 1,627 calendar days; and Package C, renovation of the operating room in Building 1400 at 986 calendar days. Package A must be completed before work on Packages B and C can commence, and those two are optional, subject to future funding and exercise after award. The work encompasses extensive civil, structural, architectural, mechanical, electrical, plumbing, fire protection, cybersecurity, hazardous material abatement, antiterrorism, and sustainability measures across multiple hospital departments including the Emergency Department, Inpatient Pharmacy, Radiology, Sterile Processing, Surgery Suites, and Laboratory, requiring full compliance with UFC and NFPA standards, ABA accessibility standards, MHS World Class Checklist, and Japanese regulations. Contractors must be legally authorized to conduct business in Japan, possess a valid construction license issued by the Ministry of Land, Infrastructure and Transport or a prefectural authority, and be capable of executing complex renovations within an active military medical facility without disrupting critical operations. The U.S. Government will not extend United States Official Contractor status or civilian component certification under the U.S.-Japan Status of Forces Agreement, meaning contractors and their personnel must operate under local Japanese law without U.S. diplomatic protections. Responses must be submitted electronically via the designated Contractor Information Form, limited to 12 single-sided pages or six double-sided pages with 12-point font, including up to five detailed project examples that demonstrate relevant experience, capability, and capacity. All submissions must be received by 1530 JST on August 10, 2026, and no reimbursement will be provided for response costs. Proprietary information will be safeguarded and used solely for acquisition planning; no contract award will result from this notice, no evaluations or feedback will be issued, and no binding obligations are formed regardless of the substance of submissions. The contract type, when awarded, will be firm-fixed-price with performance occurring entirely on the
Navfacsyscom Far East

POSTED

about 3 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, Project 7190530, involves upgrading the life health safety systems in Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs within an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 380 calendar days after the award. The basis for award is the lowest price, and the successful offeror will be issued a task order under MACC contract N4008525D. Key administrative requirements include the submission of proposals by September 24, 2026, at 3:00 PM local time. Bonding requirements are tiered based on proposal value, with bid, payment, and performance bonds required for proposals exceeding 150,000 dollars. The contract is subject to the Davis-Bacon Act and the Buy American Act, and it mandates specific paid sick leave for employees. Invoicing must be processed through Wide Area WorkFlow, and the contractor is required to maintain a comprehensive quality control system covering both onsite and offsite operations. Final acceptance is contingent upon a series of inspections, including punch out, pre-final, and final acceptance inspections.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Department Of Defense → Endist Tulsa

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement