Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on May 15, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GALLATIN NATIONAL FOREST: 2014 Backhoe & Dump Truck Equipment Rental

Awarded
AG-0398-S-14-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 9 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$96,890

NAICS

238910 - Site Preparation Contractors

Place of Performance

Gallatin National Forest PO Box 130 / 10 E Babcock, BOZEMAN, MT, 59771, USA

Set-Aside

NONE

Award Issued Date

Documents

2

AG-0398-S-14-0002-0001.pdf

PDF

AG-0398-S-14-0002.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

NAICS code changed from 532412 to 238910. The notice description changed.

Deadline changed

Response deadline changed from Apr 18, 2014 to Apr 21, 2014.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Custer Gallatin National Forest
Contacts1 person available
OfficeBOZEMAN, MT, 59715, USA
Office AddressBOZEMAN, MT, 59715, USA
Contacts
Alane M FitzpatrickContracting Officer

Full Description

Show more
Scope of Work: This is a request for an equipment rental contract (Backhoe and Dump Truck) on the Gallatin National Forest. This requirement involves furnishing equipment that is fully operated and that is in good mechanical and operational condition. The equipment must be operated by qualified, competent operators who are experienced in performing the type of work specified herein. The operator/s must be practiced in operating a backhoe and a dump truck in mountain conditions/terrain and must be skilled in the safe operation of the equipment and the hook-up of any/all equipment attachments. Thorough knowledge of all equipment capabilities is required. A concise resume for each operator must be provided. The Contractor shall provide all equipment, operating supplies, operators, supervision, and support functions necessary to perform the required work on a per hour basis. Description of Work: The work to be accomplished is associated with road maintenance, facility and administrative site maintenance, and road decommissioning. The work shall include, but is not limited to: roadside brushing and tree removal, placing and spreading aggregate base material, rip rap hauling, slide removal, repair of roadway slumps, installing culvert pipes and cattle guards, placing riprap, digging out culvert inlets/outlets and cross drains, cleaning ditch, gate repair and installation, bridge maintenance and repair, sign and post installation in accordance with Manual on Uniform Traffic Control Devices (MUTCD) specifications, placing rock in stream channels, and blocking roads with rock. Hand labor necessary for the accomplishment of any work will be provided by the Government. All materials referenced (i.e., aggregate, cattle guards, culvert, riprap, gates, posts, signs, etc.) will be furnished by the Government. Technical Specifications: Equipment furnished under this contract shall meet the following minimum specifications and equipment requirements. (a) Backhoe/Endloader (1) Minimum Net Engine Horsepower - 84 (2) 4-wheel drive, rubber-tired, mounted with extend-a-hoe boom and thumb; equipped with ride control. Required hydraulic attachments: flailing blade brush head capable of taking down a 6-inch diameter tree; 8-inch minimum diameter auger, vibrating/compacting plate; 12-inch bucket. All attachments will be "quick attach/quick coupler" with the hydraulics plumbed and ready for use. (3) Loader Bucket - multi-purpose (four-way), with flip-over forklift attachment. Flip-over forks will be adjustable for width and a minimum of 48-inches long. Clamp-on and bolt-on style forks are unacceptable. (4) Minimum Endloader Bucket Capacity: 1-1/8 cubic yards (5) Minimum Backhoe Bucket Capacity: 5.5 cubic feet; 24-inches wide (6) Power Shift (7) Maximum Equipment Age: NOT older than 6 years (b) Dump Truck (1) Diesel powered, minimum net horsepower: 190 (2) Tandem drive axle (3) End dump with lip and bed protection for hauling riprap (4) Equipment Age: NOT older than 8 years and in good serviceable condition (See *NOTE below) (c) Trailer. Trailer shall be capable of being towed by the above dump truck and hauling the backhoe/endloader. *NOTE: Equipment may be offered which exceeds the specified age, if: (a) The bidder completes the equipment identification blocks on The Schedule; (b) The bidder secures an inspection by a qualified mechanic employed by a factory authorized repair facility for warranty purposes or an authorized dealer, for the Make of equipment being offered; (c) The mechanic completes the Inspection Form (EXHIBIT B) and certifies that the equipment is in good operating and mechanical condition; (d) The bidder must complete and submit the inspection form as part of the bid package in response to this Request for Quotations. This inspection does not affect the Government's right to make additional inspections of the equipment or to contact the inspector concerning the inspection performed. Safety Requirements: The Contractor shall provide two signs, with stands, stating "Road Work Ahead." Signs shall be a minimum of 36" x 36" in size with 6-inch black lettering on an orange background, reflectorized. Signs shall be in good condition and lettering shall be legible. Signs shall conform to U.S. Department of Transportation "Manual of Uniform Traffic Control Devices" (MUTCD), sign W21-3. (See Exhibit A). Signs shall be posted at the beginning and end of the daily work area before work begins. Signs shall be removed at the end of each work day. Project Location: The work will be located on various roads/areas across the Gallatin National Forest on the Bozeman, Yellowstone (Livingston & Big Timber areas), Gardiner, and Hebgen Lake Ranger Districts. Contract Type: A Time and Material (Labor-Hour) contract is expected to result from this solicitation. Interested bidders with technical questions may contact Jeff Hiedeman at the Gallatin National Forest, Supervisor's Office at +1 (555) 000-0000. The solicitation will be available on approximately 2 April 2014 and can be downloaded from this website at that time.

More opportunities from Department Of Agriculture → Custer Gallatin National Forest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS