Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on September 26, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GAOA 2022 Ft. Pierre NFSR 227 Mueller Aggregate Road

Closed
1240LT22Q0137Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 8 hours ago

DEADLINE

in about 20 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 9 hours ago

DEADLINE

in about 1 month

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Fort Pierre, SD, 57532, USA

Set-Aside

SBA

Documents

7

1240LT22Q0137 - 2022 Ft Pierre NFSR 227 Mueller Road Aggregate

PDF, High priority: read this first41 pages · rfq
High

1240LT22Q0137 NFSR 227 Forest Service Supplemental Specifications

PDF, High priority: read this first21 pages · specifications
High

Attachment 5: Contractor Information and Past Performance Information Sheet

PDF, High priority: read this first2 pages · past-performance
High

GAOA 2022 Ft. Pierre Road Aggregate - Drawings and Maps

PDF, High priority: read this first2 pages · specifications
High

NFSR 227 Aggregate Specifications

PDF, High priority: read this first1 page · specifications
High

NFSR 227 Mueller Road - Description of Work

PDF, High priority: read this first3 pages · sow
High

SD20220001 Wage Determination - South Dakota Heavy and Highway

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts2 people available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA

Full Description

Show more
Work for this project consists of reconditioning a designated 2.0 miles of NFSR 227 Mueller Road per Base Item to a fourteen (14) foot wide roadway in preparation for furnishing, hauling, and placing approximately 1,680 cubic yards of specified aggregate base course twelve (12) foot wide as Shown on the Drawings. Blade the placed aggregate to provide a smooth running surface with a centerline crown. Reference (FP-14) Standard Specifications for Construction of Roads and Bridges as shown in the Specifications and Drawings. Quotes due 9/9/2022 5:00 pm Local Time Period of performance is NTP + 365 days Please see attachments for details.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Other Heavy and Civil Engineering Construction

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details
NAICS: 238990
New
Federal
Big Springs Horse Corral Replacement
Solicitation # 1240LT26Q0179
Solicitation 1240LT26Q0179 is a total small business set-aside for the Big Springs Horse Corral Replacement project located in the Westside Ranger District of the Caribou-Targhee National Forest in Caribou County, Idaho. The project requires the supply and installation of a 20 by 60 foot four-rail divided steel oil pipe corral with concrete post embedment. The contractor is responsible for all mobilization, clearing and grubbing, and the implementation of temporary traffic control measures, including closing local traffic and posting public notices for the duration of the work. There are two optional award items: the construction of one additional 20 by 60 foot corral and the installation of a hitching rail. The contract is a firm fixed price agreement with an estimated performance period from June 1, 2027, through July 31, 2027, allowing for 61 calendar days for completion. Award will be made to the lowest technically rated offeror with fair and reasonable pricing and acceptable or neutral past performance, evaluated via an experience questionnaire focusing on general construction and concrete work. Payment bonds are required for contracts exceeding 35,000 dollars. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave and minimum wage standards. Bids must be submitted to the USDA Forest Service by October 29, 2026.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 562910
New
Federal
Bunkhouse Asbestos Mitigation
Solicitation # 1240LT27Q0010
Solicitation 1240LT27Q0010 is a total small business set-aside for the removal and replacement of approximately 2,900 square feet of asbestos-containing building materials at three facility locations within the Rio Grande National Forest in Colorado. The scope of work includes the abatement of asbestos from ceilings, walls, windows, and flooring, followed by the installation of new materials such as drywall and wood flooring, and finishing the interior walls and ceilings with paint. Performance is scheduled to occur between October 30 and December 30, 2026. The project is estimated to have a value between 100,000 and 250,000 dollars. Award will be based on the best value to the government, with cost and price serving as the most important evaluation factor. Other critical requirements include the submission of a technical narrative and a record of past performance within the last three years. Contractors must provide 100 percent payment and performance bonds, as well as a bid bond equal to 20 percent of the total offer price. Additionally, the contractor is required to hire an independent third party for air clearance testing before renovation begins and must adhere to all applicable asbestos laws, OSHA regulations, and Davis-Bacon Act wage requirements. Quotations must be submitted via the specified Excel pricing format by the deadline of October 28, 2026.
Remediation Services

POSTED

6 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS