Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on February 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GAOA 4FO SMCG Trail Renovation

Closed
1240LT26Q0027Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
On-Call Maintenance and Minor Construction Services
Solicitation # RFP-VC-26-008
The Inland Empire Regional Composting Authority is soliciting proposals from licensed general contractors to establish a Master Services Contract for on-call maintenance and minor construction services in California. This is a small business set-aside solicitation, including SDB, WOSB, HUBZone, and VOSB designations, under NAICS code 238990. The scope of work involves providing qualified personnel and equipment for tasks that may require short-notice response, including millwright and welding activities, fire sprinkler system maintenance, general construction such as framing and concrete, and the maintenance of conveyors, hoppers, and heavy equipment. Work will be assigned via time-and-materials Task Orders, and the Authority intends to award multiple contracts based on the best interests of the agency. Proposals must be submitted electronically via PlanetBids by October 29, 2026, at 3:00 p.m. Evaluation criteria include price and payment terms, the nature of any exceptions taken to the RFP, organizational experience, personnel qualifications, and the quality of the proposed work plan. This is a prevailing wage contract subject to California Labor Code Section 1770, requiring contractors to be registered with the Department of Industrial Relations. Key contractual requirements include the provision of performance and payment bonds for any Task Order exceeding 25,000 dollars and strict adherence to OSHA safety standards. Payments are generally made within 30 days of invoice approval, though expedited payment options are available in exchange for a percentage discount.
Inland Empire Utilities Agency

POSTED

about 6 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This contract involves the construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail, along with the replacement of a 36-inch corrugated metal pipe culvert. The scope of work includes extensive earthwork such as clearing, grubbing, asphalt removal, excavation, embankment, and grading of the native subbase. Existing trail materials will be conserved and repurposed for trail shoulders and resting pad subgrades, ensuring all aggregate materials remain onsite. The new trail will feature a 6-foot width, 3-inch thick asphalt surface with a maximum 2% cross slope, supported by a 4-inch depth aggregate base. Additional elements include constructing asphalt resting pads measuring 4 by 6 feet with specified thickness and slope, installation of NDOT Type 5 concrete curbs with appropriate grading and compaction, and proper backfilling around curbs. The culvert work requires removal of the existing pipe and associated rock inlet and outlet riprap, with a proposed placement designed for a minimum 5% drop. Asphalt trail and shoulder extensions are included as option items. The project is a total small business set-aside under solicitation number 1240LT26Q0027, managed by the Humboldt-Toiyabe National Forest branch of the Department of Agriculture, with performance expected in Nevada and key contacts available at the provided emails. Responses are due by March 31, 2026.

General Info

Construct asphalt trail and replace culvert with earthwork, concrete curbs; small business set-aside.

NAICS

238990 - All Other Specialty Trade Contractors

Place of Performance

NV, USA

Set-Aside

SBA

Documents

5

GAOA SMVG Trail Renovation Plans and Specifications

PDF, High priority: read this firstsow
High

Solicitation 12401T2600027 for Asphalt Trail Services

PDF, High priority: read this firstrfp
High

Solicitation 1240LT26Q0027 GAOA 4FO SMCG Trail Renovation RFQ

DOCX, High priority: read this firstrfq
High

Statement of Work GAOA 4FO SMVG Trail Renovation

DOCX, High priority: read this firstsow
High

Wage Determination NV20260024 Clark County Nevada Heavy Construction

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Humboldt-Toiyabe National Forest
Contacts2 people available
OfficeSPARKS, NV, 89431, USA
Office AddressSPARKS, NV, 89431, USA
Contacts

Full Description

Show more
  1. This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36” cmp.
  2. Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite.
  3. Aggregate base shall be 4” depth below asphalt. Asphalt trail shall have 6’ width, 3” depth and 2% cross slope (max).
  4. Aggregate base, asphalt and concrete testing per FP-24.
  5. Resting pads shall be asphalt with 4’ width, 6’ length, 3” depth and 2% cross slope (max) in all directions. Resting pads aggregate base shall be compacted with water.
  6. Concrete curb shall be NDOT Type 5. Spillway to culvert inlet is inclusive to curb. Concrete curb may be placed on compacted aggregate base. Native subbase shall be compacted with water. The grade will be inspected for soft spots and accepted before concrete placement. Backfill to top of curb with native material.
  7.  Corrugated metal pipe item includes submitting a proposed pipe plot for placement of 36” culvert. Design for minimum 5% drop. Removal of existing culvert, inlet stacked rock and outlet riprap are inclusive to new culvert placement.
  8. All work to extend asphalt trail and shoulders is inclusive to the option items

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS