Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GAOA Chilao Campground Water System Rehabilitation, Angeles National Forest

Closed
1240LT26Q0066Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This solicitation, numbered 1240LT26Q0066, is a combined synopsis and solicitation for the Chilao Campground Water System Rehabilitation on the Angeles National Forest, issued as a Request for Quotation under FAR Part 12 with a firm-fixed price contract type. It is a total small business set-aside under NAICS code 237110, with a size standard of $45 million, and only responsible small business concerns are eligible to respond. The project involves comprehensive water utility and roadwork activities, including pipeline installation along existing alignments and rerouted roadbeds, replacement and construction of valve boxes, fire boxes, and standpipes, rehabilitation of three existing water tanks, and replacement of appurtenances at four well locations. Roadwork requires pulverization and paving of existing road segments, specifically Roads 3N21 and 3N14A/A2, with specified materials and standards. All work must be performed in Palmdale, California, with a mandatory period of performance from August 10, 2026, to February 15, 2027, and contractors must begin work within 10 days of award and complete it within 180 calendar days. The Statement of Work, Schedule of Items, Forest Service Supplemental Specifications, CSI Specifications, and supporting drawings provide detailed technical requirements, while strict packaging and marking guidelines mandate manufacturer-origin containers, NSF certification for potable water components, factory-applied end caps on piping, and appropriately marked utility tape in trenches. All quotes must be submitted electronically to Judith Martin at PPS.proposals@usda.gov by 5:00 PM local time on July 6, 2026, and must include a completed Standard Form 1442 with blocks 14–20c filled, along with pricing for every line item in the Schedule of Items—failure to price any item renders the offer non-responsive. Technical proposals must address three evaluation factors: Technical and Project Management, Experience, and Past Performance, with submissions requiring a detailed project schedule in CPM, Gantt, or network diagram format showing the critical path and inclusion of long-lead item acquisition timelines. Contractors must submit a quality control plan for approval prior to commencing work, maintain records of all inspections and tests, and certify in writing that all procedures were followed in compliance. Mandatory contract clauses include Inspection of Construction (FAR 52.246-

General Info

RFQ for water system rehabilitation at Chilao Campground, small business set-aside, quotes due July 7, 2026.

Agency

Department Of Agriculture → Csa Intermountain 8 Usda-FsView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Palmdale, CA, USA

Set-Aside

SBA

Documents

(14)

C05 Attachment 6 Revised Drawings Amendment 01

PDFamendment

GAOA Chilao Campground Complex Water System Rehabilitation SOW

PDFsow

Attachment 7 Chilao Photos

PDFother

Attachment+8+-+ChilaoSchematic1999.pdf

PDF

Amendment 01 Chilao Campground Water System Rehabilitation 1240LT26Q0066

PDFamendment

Solicitation 1240LT26Q0066 Chilao Campground Water System Rehabilitation

PDFifb

California Los Angeles County Construction DBA Wage Determination CA2026022

PDFwage-determination

GAOA Chilao Campground Complex Water System Rehabilitation Minimization Measures

PDFminimization-measures

FP24 Forest Service Supplemental Specifications for Chilao CG Water System

PDFspecifications

Attachment 6 - Drawings Chilao CG Water System

PDFother

Fire Plan for GAOA Chilao Campground Complex Water System Rehabilitation

PDFfire-plan

Attachment 5 - CSI Specifications Chilao CG Water System

PDFspecifications

SOI Chilao CG Water System Rehabilitation 1240LT26Q0066

XLSXsoi

Attachment+9+-+ChilaoSystemHistoricalDrawing.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts2 people available
OfficeOgden, UT, 844012310, USA
Organization / Agency
Department Of Agriculture → Csa Intermountain 8 Usda-Fs
View Agency Profile
Office AddressOgden, UT, 844012310, USA

Full Description

Show more

This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. 


Solicitation number 1240LT26Q0066 is issued as a Request for Quotation (RFQ) for the Chilao Campground Water System Rehabilitation on the Angeles National Forest.


This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237110. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside.   All responsible sources may submit a quotation which will be considered by the agency. 


6/24/26 - Amendment 01 Posted.  Summary - Site visit information, questions and answers, and revised drawings.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237310
New
Federal
Selkirk to Surf Road Maintenance
Solicitation # 1240LT26Q0115
Solicitation 1240LT26Q0115 is a combined synopsis and request for quotation issued by the USDA Forest Service for the Selkirks to Surf road maintenance project. Located within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest in Okanogan County, Washington, the project focuses on deferred transportation maintenance along FSR 5400 Harts Pass Road and FSR 5400600 Slate Peak Road. This is a total small business set-aside under NAICS code 237310. The scope of work includes a base package for roadway clearing, ditch and culvert reconditioning, aggregate surface placement, and riprap armor installation, as well as five optional items for additional aggregate placement and landslide or flood damage repairs. The contract is a firm fixed price award with a period of performance from September 14, 2026, to October 13, 2027. Award will be based on the lowest price technically acceptable criteria, requiring a technical approach, construction schedule, and a record of three similar projects completed within the last three years. Compliance with the Davis-Bacon Act and specific Forest Service fire and camping regulations is required. Proposals must be submitted as four separate PDF documents to the designated contract specialist by September 14, 2026, at 1:00 PM Pacific Time. Payment will be based on actual work performed, with progress payments available monthly.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Federal
GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
Solicitation # 1240LT26Q0094
Solicitation 1240LT26Q0094 is a total Small Business set-aside for the Palisades Lagoon Liner and Effluent Sprinkler System Replacement project at the Coronado National Forest in Pima County, Arizona. The project involves the maintenance and upgrade of the wastewater treatment system at the Palisades Administrative Complex, specifically requiring the replacement of the existing lagoon liner with a double geomembrane system, the installation of a new effluent sprinkler system, and the reconstruction of approximately 660 linear feet of access road. To ensure uninterrupted wastewater services during construction, the contractor must provide a temporary above-ground wastewater conveyance system and manage the disposal of existing liners and effluent sludge. The estimated contract value ranges between 500,000 and 1,000,000 dollars, with a performance period from October 1, 2026, to December 1, 2026. The acquisition is governed by FAR Part 12 and NAICS code 237110. Award will be based on best value, evaluating technical approach, project management, performance schedules, specialized experience, and past performance. A bid guarantee of 20 percent is required for quotes exceeding 150,000 dollars. Contractors must comply with the Davis-Bacon Act for wage determinations and provide a written quality control plan for approval by the Contracting Officer's Representative before work begins. Final acceptance is contingent upon the system being tested under operating conditions. All invoicing must be processed electronically via the Department of Treasury's Invoice Processing Platform.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS